{"id":39347,"date":"2024-05-09T13:36:43","date_gmt":"2024-05-09T03:36:43","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=39347"},"modified":"2024-05-09T13:36:43","modified_gmt":"2024-05-09T03:36:43","slug":"iarnrod-eireann-irish-rails-night-time-track-works","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=39347","title":{"rendered":"Iarnr\u00f3d \u00c9ireann (Irish Rail)\u2019s night-time track works"},"content":{"rendered":"<p><a href=\"https:\/\/www.irishrail.ie\/\">Iarnr\u00f3d \u00c9ireann<\/a> is committed to providing a quality train service to the large number of DART, commuter and intercity passengers using the railway on a daily basis. In order to ensure safe delivery of these public services we have to constantly maintain and improve the track infrastructure. Most of this work is safety critical maintenance work which has to take place at night when passenger trains are not running. This work can be noisy and affect people whose homes are near the operating railway as it involves the use of on-track machines and power tools.<\/p>\n<p>We endeavour to notify house owners adjacent to the railway of any planned night-time works near their homes. In the case of apartment blocks and multiple units, communication is primarily through the relevant management companies or multiple unit owners.<\/p>\n<p>Night-time track works can involve:<\/p>\n<p>Points and crossing maintenance<br \/>\nPlain line track maintenance<br \/>\nVegetation control<br \/>\nBridge maintenance and renewals<br \/>\nBallasting works<\/p>\n<p>Night-time track works generally take place between midnight and 6am, except on Sundays when work can continue until 8am.<\/p>\n<p>On some occasions, emergency works have to be carried out at short notice and it is not possible to advise home owners in advance. Also, some maintenance work is linear in nature and can be spread over approximately 2km on any one night alone, making it impractical to notify all of the homes that may be affected.<\/p>\n<p>For alterations and amendments to the scheduled timetable due to line improvement works please see our\u00a0<a title=\"Upcoming Line Improvement Works\" href=\"https:\/\/www.irishrail.ie\/news\/irishrail-engineering-works\">Upcoming Line Improvement Works<\/a>\u00a0page.<\/p>\n<p>The following currently scheduled night-time works are in close proximity to residential areas:<\/p>\n<p>Night-time Track Works Across Iarnr\u00f3d \u00c9ireann Network<\/p>\n<p>Station \/ Area<br \/>\nDate<br \/>\nLocation<\/p>\n<p>Ashtown<br \/>\n7th \u2013 18th May<br \/>\nEssential track maintenance (electrical and drainage works). Use of heavy on track machinery needed<\/p>\n<p>Balbriggan<\/p>\n<p>15th April \u2013 4th May<\/p>\n<p>7th \u2013 18th May<\/p>\n<p>Essential track maintenance (renewal of P&amp;C). Use of heavy on track machinery needed<\/p>\n<p>Bray\u00a0<\/p>\n<p>29th April \u2013 3rd May<\/p>\n<p>7th \u2013 11th May<\/p>\n<p>Essential linear track maintenance (points repair). Use of heavy on track machinery needed<\/p>\n<p>Caragh<br \/>\n22nd April \u2013 18th May<br \/>\nEssential linear track maintenance (track renewal). Use of heavy on track machinery needed<\/p>\n<p>Carrigtwohill to Midleton\u00a0<\/p>\n<p>29th April \u2013 31st May<br \/>\nWorks will be carried out 11.30pm \u2013 5am each night incorporating areas along rail corridor including Ballyadam, Ballyrichard More, Waterock, Ford and Mill Road Level Crossings. Use of plant and machinery needed.\u00a0<\/p>\n<p>Cherryville \u2013 Portarlington<br \/>\n29th April \u2013 4th May<br \/>\nEssential linear track maintenance (rail repair). Use of heavy on track machinery needed<\/p>\n<p>Connolly \u2013 Howth Junction<\/p>\n<p>7th \u2013 11th May<\/p>\n<p>Essential linear track maintenance (rail milling machine). Use of heavy on track machinery needed<\/p>\n<p>Dalkey \u2013 Shankill<br \/>\n7th \u2013 11th May<br \/>\nEssential linear track maintenance (cable containment\/installation). Use of heavy on track machinery needed<\/p>\n<p>Donabate<br \/>\n7th \u2013 11th May<br \/>\nEssential track maintenance. Use of heavy on track machines needed.<\/p>\n<p>Drogheda<\/p>\n<p>15th April \u2013 28th September<\/p>\n<p>Kearney\u2019s Yard. Access\/Egress. Loading on\/off machinery. Use of heavy on track machines needed.<\/p>\n<p>Dundalk<\/p>\n<p>30th April \u2013 4th May<\/p>\n<p>Dunleer. Access\/Egress. Loading on\/off machinery. Use of heavy on track machines needed.<\/p>\n<p>Enfield \u2013 Ashtown<\/p>\n<p>29th April \u2013 4th May<\/p>\n<p>Essential linear track maintenance. Use of heavy on track machinery needed<\/p>\n<p>Greystones<\/p>\n<p>11th \u2013 12th May<\/p>\n<p>Ennis Lane. Access\/Egress. Loading on\/off machinery. Use of heavy on track machines needed.<\/p>\n<p>Howth Junction<\/p>\n<p>29th April \u2013 3rd May<\/p>\n<p>Essential linear track maintenance (points repair). Use of heavy on track machinery needed<\/p>\n<p>Howth Junction \u2013 Portmarnock<\/p>\n<p>7th \u2013 11th May<\/p>\n<p>Essential linear track maintenance (muck digging). Use of heavy on track machinery needed<\/p>\n<p>Kilbarrack \u2013 Howth Junction<\/p>\n<p>7th \u2013 11th May<\/p>\n<p>Essential linear track maintenance (points repair). Use of heavy on track machinery needed<\/p>\n<p>Kilcock\/Maynooth<\/p>\n<p>29th April \u2013 4th May<\/p>\n<p>Jackson\u2019s Bridge\/Old Bog Road\/Ferran\u2019s Crossing\/Kilcock Station. Essential track maintenance (ballast maintenance). Use of heavy on track machinery needed<\/p>\n<p>Kildare<\/p>\n<p>2nd May \u2013 12th May<\/p>\n<p>Sallins. Essential track maintenance (rail replacement). Use of heavy on track machinery needed<\/p>\n<p>Kildare<\/p>\n<p>2nd May \u2013 12th May<\/p>\n<p>Sherlockstown. Access\/Egress. Loading on\/off machinery. Use of heavy on track machines needed.<\/p>\n<p>Kildare<\/p>\n<p>4th \u2013 5th May<\/p>\n<p>11th \u2013 12th May<\/p>\n<p>Essential track maintenance (rail repair). Use of heavy on track machinery needed<\/p>\n<p>Kildare<\/p>\n<p>22nd April \u2013 25th May<\/p>\n<p>Essential linear track maintenance (track renewal). Use of heavy on track machinery needed<\/p>\n<p>Kildare<\/p>\n<p>10th \u2013 12th May<\/p>\n<p>Cherryville. Essential track maintenance (rail stress). Use of heavy on track machinery needed<\/p>\n<p>Kilkenny<\/p>\n<p>\u00a0<\/p>\n<p>7th- 11th May<\/p>\n<p>\u00a0<\/p>\n<p>30th April \u2013 4th May<\/p>\n<p>\u00a0<\/p>\n<p>Newrath to Dunkitt. Essential track maintenance. Use of heavy on track machinery needed<\/p>\n<p>Mullinavat to Coolmeen. Essential linear track maintenance. Use of heavy on track machinery needed<\/p>\n<p>Killiney<\/p>\n<p>29th April \u2013 7th May<\/p>\n<p>Access\/Egress. Loading on\/off machinery. Use of heavy on track machines needed.<\/p>\n<p>Lansdowne Road<\/p>\n<p>15th April \u2013 11th May<\/p>\n<p>Lansdowne Road Level Crossing. Access\/Egress. Loading on\/off machinery. Use of heavy on track machines needed.<\/p>\n<p>\u00a0<\/p>\n<p>Lansdowne Road \u2013 Sepentine<br \/>\n15th April \u2013 11th May<br \/>\nEssential linear track maintenance (boundary wall repair). Use of heavy on track machinery needed<\/p>\n<p>Leixlip<br \/>\n11th \u2013 12th May<br \/>\nEssential track maintenance (rail stress). Use of heavy on track machinery needed<\/p>\n<p>Lucan North<\/p>\n<p>7th \u2013 12h May<\/p>\n<p>29th April \u2013 4th May<\/p>\n<p>Foley\u2019s Yard. Access\/Egress. Loading on\/off machinery. Use of heavy on track machines needed.<\/p>\n<p>Malahide<\/p>\n<p>31st January \u2013 10th May<\/p>\n<p>7th May \u2013 27th September<\/p>\n<p>Essential track maintenance (Overhead Cable Equipment Mast Strengthening). Use of heavy on track machines needed<\/p>\n<p>Maynooth<\/p>\n<p>\u00a0<\/p>\n<p>9th \u2013 11th May<\/p>\n<p>\u00a0<\/p>\n<p>Essential linear track maintenance. Use of heavy on track machinery needed<\/p>\n<p>Maynooth \u2013 Ashtown<\/p>\n<p>7th \u2013 12th May<\/p>\n<p>Essential linear track maintenance. Use of heavy on track machinery needed<\/p>\n<p>Mullingar<\/p>\n<p>Weekly to 4th May<\/p>\n<p>Essential track maintenance works near Mullingar Station Co. Westmeath. Works will take place from 21:00 to 06:00 each night respectively. Works will continue every week Tuesday night to Saturday morning until Saturday 4th May.<\/p>\n<p>Newtownforbes, Co. Longford<\/p>\n<p>9th May<\/p>\n<p>16th May<\/p>\n<p>17th- 18th May<\/p>\n<p>Essential track maintenance works. Works will take place from 21:00 to 06:00 each night respectively<\/p>\n<p>North Strand<\/p>\n<p>10th \u2013 12th May<\/p>\n<p>Essential track maintenance (points repair). Use of heavy on track machinery needed<\/p>\n<p>Pearse station \u2013 Lansdowne Road<\/p>\n<p>7th -11th May<\/p>\n<p>Essential linear track maintenance (points maintenance). Use of heavy on track machinery needed<\/p>\n<p>Phoenix Park Tunnel<\/p>\n<p>8th April \u2013 1st June<\/p>\n<p>Essential track maintenance (brick repairs). Use of heavy on track machinery needed<\/p>\n<p>Portarlington<\/p>\n<p>29th April \u2013 4th May<\/p>\n<p>7th \u2013 10th May<\/p>\n<p>Essential track maintenance (points &amp; crossings maintenance). Use of heavy on track machinery needed<\/p>\n<p>Essential track maintenance (rail repair). Use of heavy on track machinery needed<\/p>\n<p>Sandycove \u2013 Killiney<\/p>\n<p>29th April \u2013 7th May<\/p>\n<p>8th May \u2013 11th May<\/p>\n<p>Essential linear track maintenance (overhead cable renewal). Use of heavy on track machinery needed<\/p>\n<p>Seapoint \u2013 Dun Laoghaire<\/p>\n<p>7th \u2013 11th May<\/p>\n<p>29th April \u2013 4th May<\/p>\n<p>Essential linear track maintenance (rail and overhead cable renewal). Use of heavy on track machinery needed<\/p>\n<p>Shankill \u2013 Bray<\/p>\n<p>29th April \u2013 8th June<\/p>\n<p>Essential linear track maintenance (track renewal). Use of heavy on track machinery needed<\/p>\n<p>Spin Bridge<\/p>\n<p>29th April \u2013 4th May<\/p>\n<p>Access\/Egress. Loading on\/off machinery. Use of heavy on track machines needed.<\/p>\n<p>Streete, Co. Westmeath<\/p>\n<p>2nd \u2013 3rd May<\/p>\n<p>8th May<\/p>\n<p>14th \u2013 15th May<\/p>\n<p>21st \u2013 24th May<\/p>\n<p>Essential railway engineering and safety critical track maintenance works. Works will take place from 21:00 to 06:00 each night respectively<\/p>\n<p>Wexford<\/p>\n<p>30th April \u2013 5th May<\/p>\n<p>3rd May \u2013 4th May<\/p>\n<p>Ardcandrisk to The Heritage Park. Essential linear track maintenance. Use of heavy on track machinery needed<\/p>\n<p>Macmine to Polehore. Essential linear track maintenance. Use of heavy on track machinery needed<\/p>\n<div class=\"box\">\n<p><strong>More Like This<\/strong><\/p>\n<h3><a href=\"https:\/\/www.globalrailwayreview.com\/news\/172157\/rail-baltica-webinar\/\">Rail Baltica webinar TODAY \u2013 supplier opportunities 2024<\/a><\/h3>\n<h3><a href=\"https:\/\/www.globalrailwayreview.com\/news\/172152\/transport-refunds\/\">\u00a3200,000 paid out in \u2018device clash\u2019 refunds could be tip of the iceberg warns transport watchdog<\/a><\/h3>\n<h3><a href=\"https:\/\/www.globalrailwayreview.com\/news\/172097\/network-rail-glenfinnan\/\">Network Rail begins repairing the world-famous Glenfinnan viaduct<\/a><\/h3>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Iarnr\u00f3d \u00c9ireann is committed to providing a quality train service to the large number of DART, commuter and intercity passengers using the railway on a [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":39348,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[32,47,488],"tags":[],"class_list":["post-39347","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-and-opinion","category-rail-news","category-railway-stations"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/39347","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=39347"}],"version-history":[{"count":0,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/39347\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/media\/39348"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=39347"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=39347"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=39347"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}