{"id":393443,"date":"2026-03-25T19:58:32","date_gmt":"2026-03-25T09:58:32","guid":{"rendered":"https:\/\/railuk.com\/?p=191055"},"modified":"2026-03-25T19:58:32","modified_gmt":"2026-03-25T09:58:32","slug":"major-accessibility-upgrades-progress-at-tenby-station","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=393443","title":{"rendered":"Major accessibility upgrades progress at Tenby station"},"content":{"rendered":"<p>Passengers at Tenby station to benefit from step-free access between platforms as upgrades move into next phase<\/p>\n<p>Network Rail, alongside contractors AmcoGiffen, is delivering major accessibility upgrades at Tenby station through the UK Government\u2019s Access for All programme. The scheme will provide step-free access to both platforms via a new footbridge and lifts, making it easier for disabled passengers, as well as those travelling with pushchairs or heavy luggage, to move around the station independently.<\/p>\n<p>This March, teams safely removed the existing footbridge, using\u202fa 220 tonne and 60 tonne crane,\u202fand installed a temporary walkway, allowing passengers to continue moving between platforms while construction of the new accessible bridge gets underway.<\/p>\n<p>The milestone was marked by a visit from a group of local schoolchildren, who had the opportunity to watch the crane operation up close and learn more about careers in engineering.<\/p>\n<p>To accommodate the new footbridge and lifts, teams had to relocate and recommission significant signalling and telecoms equipment, as well as install new platform ducting and reroute cabling which will support the upgraded infrastructure.<\/p>\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/25093936\/Tenby-old-bridge-removal-March-2026.png\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"733\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/25093936\/Tenby-old-bridge-removal-March-2026-1024x733.png\" alt=\"\" class=\"wp-image-191068\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/25093936\/Tenby-old-bridge-removal-March-2026-1024x733.png 1024w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/25093936\/Tenby-old-bridge-removal-March-2026-300x215.png 300w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/25093936\/Tenby-old-bridge-removal-March-2026-768x550.png 768w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/25093936\/Tenby-old-bridge-removal-March-2026-587x420.png 587w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/25093936\/Tenby-old-bridge-removal-March-2026-696x498.png 696w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/25093936\/Tenby-old-bridge-removal-March-2026-1068x765.png 1068w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/25093936\/Tenby-old-bridge-removal-March-2026.png 1215w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n<p>Over the coming months, Network Rail and its contractors will progress work to install the new step-free facilities at Tenby station, with completion expected in autumn 2026.<\/p>\n<p>The improvements at Tenby form part of Network Rail\u2019s wider commitment to creating a more accessible railway across Britain. Since 2006, the Access for All programme has transformed more than 200 stations, helping to remove barriers and support more inclusive travel.<\/p>\n<p>Theo Smith, senior portfolio manager at Network Rail Wales and Borders said, \u201cThis is an important milestone for Tenby and the local community, bringing us closer to a station that everyone can use with confidence.<\/p>\n<p>\u201cI\u2019d like to thank our teams and partners who worked safely and efficiently to deliver this stage of the project on time &#8211; helping us minimise disruption while we carried out the next phase of these major improvements.<\/p>\n<p>\u201cWe\u2019re very grateful to passengers and residents for their patience as we continue to invest in a safer, more accessible and reliable railway for Wales and Borders.\u201d<\/p>\n<p>James Gough, customer operations director at Transport for Wales said, \u201cIt\u2019s fantastic to see real progress being made at Tenby. The community and many visitors who pass through this station deserve safe, convenient access to both platforms which is why we were delighted when funding for this project was confirmed, and we\u2019re looking forward to seeing the long-term benefits it brings.\u201d<\/p>\n<p>Image credit: Network Rail<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Passengers at Tenby station to benefit from step-free access between platforms as upgrades move into next phase Network Rail, alongside contractors AmcoGiffen, is delivering major accessibility upgrades at Tenby station through the UK Government\u2019s Access for All programme. The scheme will provide step-free access to both platforms via a new footbridge and lifts, making it [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[146,47,16092,16031,85],"tags":[],"class_list":["post-393443","post","type-post","status-publish","format-standard","hentry","category-accessibility","category-rail-news","category-stations","category-structures","category-uk"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.9 - aioseo.com -->\n\t<meta name=\"description\" content=\"Passengers at Tenby station to benefit from step-free access between platforms as upgrades move into next phase Network Rail, alongside contractors AmcoGiffen, is delivering major accessibility upgrades at Tenby station through the UK Government\u2019s Access for All programme. The scheme will provide step-free access to both platforms via a new footbridge and lifts, making it [\u2026]\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=393443\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.9\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Major accessibility upgrades progress at Tenby station - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Passengers at Tenby station to benefit from step-free access between platforms as upgrades move into next phase Network Rail, alongside contractors AmcoGiffen, is delivering major accessibility upgrades at Tenby station through the UK Government\u2019s Access for All programme. The scheme will provide step-free access to both platforms via a new footbridge and lifts, making it [\u2026]\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=393443\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-03-25T09:58:32+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-03-25T09:58:32+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Major accessibility upgrades progress at Tenby station - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Passengers at Tenby station to benefit from step-free access between platforms as upgrades move into next phase Network Rail, alongside contractors AmcoGiffen, is delivering major accessibility upgrades at Tenby station through the UK Government\u2019s Access for All programme. The scheme will provide step-free access to both platforms via a new footbridge and lifts, making it [\u2026]\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=393443#blogposting\",\"name\":\"Major accessibility upgrades progress at Tenby station - VibeWire Magazine\",\"headline\":\"Major accessibility upgrades progress at Tenby station\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/cdn.railuk.co\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/25093936\\\/Tenby-old-bridge-removal-March-2026-1024x733.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=393443\\\/#articleImage\"},\"datePublished\":\"2026-03-25T19:58:32+10:00\",\"dateModified\":\"2026-03-25T19:58:32+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=393443#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=393443#webpage\"},\"articleSection\":\"accessibility, Rail News, Stations, Structures, UK\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=393443#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=393443#listItem\",\"name\":\"Major accessibility upgrades progress at Tenby station\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=393443#listItem\",\"position\":3,\"name\":\"Major accessibility upgrades progress at Tenby station\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=393443\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=393443\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=393443#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=393443#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=393443\",\"name\":\"Major accessibility upgrades progress at Tenby station - VibeWire Magazine\",\"description\":\"Passengers at Tenby station to benefit from step-free access between platforms as upgrades move into next phase Network Rail, alongside contractors AmcoGiffen, is delivering major accessibility upgrades at Tenby station through the UK Government\\u2019s Access for All programme. The scheme will provide step-free access to both platforms via a new footbridge and lifts, making it [\\u2026]\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=393443#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"datePublished\":\"2026-03-25T19:58:32+10:00\",\"dateModified\":\"2026-03-25T19:58:32+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Major accessibility upgrades progress at Tenby station - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Major accessibility upgrades progress at Tenby station - VibeWire Magazine","description":"Passengers at Tenby station to benefit from step-free access between platforms as upgrades move into next phase Network Rail, alongside contractors AmcoGiffen, is delivering major accessibility upgrades at Tenby station through the UK Government\u2019s Access for All programme. The scheme will provide step-free access to both platforms via a new footbridge and lifts, making it [\u2026]","canonical_url":"https:\/\/www.vibewire.com.au\/?p=393443","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=393443#blogposting","name":"Major accessibility upgrades progress at Tenby station - VibeWire Magazine","headline":"Major accessibility upgrades progress at Tenby station","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/25093936\/Tenby-old-bridge-removal-March-2026-1024x733.png","@id":"https:\/\/www.vibewire.com.au\/?p=393443\/#articleImage"},"datePublished":"2026-03-25T19:58:32+10:00","dateModified":"2026-03-25T19:58:32+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=393443#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=393443#webpage"},"articleSection":"accessibility, Rail News, Stations, Structures, UK"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=393443#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=393443#listItem","name":"Major accessibility upgrades progress at Tenby station"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=393443#listItem","position":3,"name":"Major accessibility upgrades progress at Tenby station","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=393443\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=393443\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=393443#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=393443#webpage","url":"https:\/\/www.vibewire.com.au\/?p=393443","name":"Major accessibility upgrades progress at Tenby station - VibeWire Magazine","description":"Passengers at Tenby station to benefit from step-free access between platforms as upgrades move into next phase Network Rail, alongside contractors AmcoGiffen, is delivering major accessibility upgrades at Tenby station through the UK Government\u2019s Access for All programme. The scheme will provide step-free access to both platforms via a new footbridge and lifts, making it [\u2026]","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=393443#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"datePublished":"2026-03-25T19:58:32+10:00","dateModified":"2026-03-25T19:58:32+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Major accessibility upgrades progress at Tenby station - VibeWire Magazine","og:description":"Passengers at Tenby station to benefit from step-free access between platforms as upgrades move into next phase Network Rail, alongside contractors AmcoGiffen, is delivering major accessibility upgrades at Tenby station through the UK Government\u2019s Access for All programme. The scheme will provide step-free access to both platforms via a new footbridge and lifts, making it [\u2026]","og:url":"https:\/\/www.vibewire.com.au\/?p=393443","article:published_time":"2026-03-25T09:58:32+00:00","article:modified_time":"2026-03-25T09:58:32+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Major accessibility upgrades progress at Tenby station - VibeWire Magazine","twitter:description":"Passengers at Tenby station to benefit from step-free access between platforms as upgrades move into next phase Network Rail, alongside contractors AmcoGiffen, is delivering major accessibility upgrades at Tenby station through the UK Government\u2019s Access for All programme. The scheme will provide step-free access to both platforms via a new footbridge and lifts, making it [\u2026]","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"393443","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-03-25 10:34:46","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2026-03-25 10:33:54","updated":"2026-03-25 10:34:46"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tMajor accessibility upgrades progress at Tenby station\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"Major accessibility upgrades progress at Tenby station","link":"https:\/\/www.vibewire.com.au\/?p=393443"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/393443","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=393443"}],"version-history":[{"count":3,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/393443\/revisions"}],"predecessor-version":[{"id":393539,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/393443\/revisions\/393539"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=393443"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=393443"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=393443"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}