{"id":392684,"date":"2026-03-24T20:29:13","date_gmt":"2026-03-24T10:29:13","guid":{"rendered":"https:\/\/railuk.com\/?p=190988"},"modified":"2026-03-24T20:29:13","modified_gmt":"2026-03-24T10:29:13","slug":"major-engineering-work-delivered-at-glasgow-central-during-emergency-closure-2","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=392684","title":{"rendered":"Major engineering work delivered at Glasgow Central during emergency closure"},"content":{"rendered":"<p><a href=\"https:\/\/railuk.com\/railway-stations\/major-engineering-work-delivered-at-glasgow-central-during-emergency-closure\/\" title=\"Major engineering work delivered at Glasgow Central during emergency closure\" rel=\"nofollow\"><img loading=\"lazy\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/24102709\/Glasgow-Central-station-work-Network-Rail-485x360.png\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\" style=\"display: block; margin-bottom: 5px; clear:both;max-width: 100%;\" link_thumbnail=\"1\" decoding=\"async\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/24102709\/Glasgow-Central-station-work-Network-Rail-485x360.png 485w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/24102709\/Glasgow-Central-station-work-Network-Rail-80x60.png 80w\" sizes=\"auto, (max-width: 485px) 100vw, 485px\" \/><\/a><\/p>\n<p>Network Rail engineers seized the rare opportunity of the closure of Scotland\u2019s busiest station to deliver an extensive package of maintenance and renewals that would ordinarily have taken around ten months to complete.<\/p>\n<p>With Glasgow Central closed from March 8 due to the Union Street fire, teams moved quickly to plan and carry out a broad range of essential works before the station partially reopened on March 18.<\/p>\n<p>The work would\u2019ve normally required multiple weekend and weekday nightshifts to complete around passenger services at Central, where over 1,200 trains move in and out each day.<\/p>\n<p>On the tracks more than 108 tonnes of used rail were removed from the station approaches along with 73 old timber sleepers. More than 6,200 sqm of vegetation was also cleared.<\/p>\n<p>Engineers carried out extensive maintenance on Overhead Line Equipment (OLE) around the station, inspecting 299 sections and carrying out a range of repairs to the wires, insulators and other kit.<\/p>\n<p>Work was carried out on switches and crossings (pieces of track that move trains from one line to another) and inspections made on 439 insulated block joints (part of the signalling system that pinpoints where trains are on the tracks).<\/p>\n<p>Keiren Sharkey, infrastructure maintenance delivery manager at Network Rail, said: \u201cIt was a situation none of us expected, but our teams reacted immediately and were determined to make the most of this rare opportunity.<\/p>\n<p>&#8220;It allowed teams based in Motherwell and Glasgow to complete an enormous amount of work that would have required a much longer period of time to complete under normal conditions.\u201d<\/p>\n<p>Image credit: Network Rail<\/p>\n","protected":false},"excerpt":{"rendered":"<p><a href=\"https:\/\/railuk.com\/railway-stations\/major-engineering-work-delivered-at-glasgow-central-during-emergency-closure\/\" title=\"Major engineering work delivered at Glasgow Central during emergency closure\" rel=\"nofollow\"><img loading=\"lazy\" decoding=\"async\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/24102709\/Glasgow-Central-station-work-Network-Rail-485x360.png\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\"><\/a>Network Rail engineers seized the rare opportunity of the closure of Scotland\u2019s busiest station to deliver an extensive package of maintenance and renewals that would ordinarily have taken around ten months to complete. With Glasgow Central closed from March 8 due to the Union Street fire, teams moved quickly to plan and carry out a [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[11323,343,16015,47,16092,85],"tags":[],"class_list":["post-392684","post","type-post","status-publish","format-standard","hentry","category-electrification","category-infrastructure","category-permanent-way","category-rail-news","category-stations","category-uk"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.9 - aioseo.com -->\n\t<meta name=\"description\" content=\"Network Rail engineers seized the rare opportunity of the closure of Scotland\u2019s busiest station to deliver an extensive package of maintenance and renewals that would ordinarily have taken around ten months to complete. With Glasgow Central closed from March 8 due to the Union Street fire, teams moved quickly to plan and carry out a [\u2026]\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=392684\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.9\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Major engineering work delivered at Glasgow Central during emergency closure - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Network Rail engineers seized the rare opportunity of the closure of Scotland\u2019s busiest station to deliver an extensive package of maintenance and renewals that would ordinarily have taken around ten months to complete. With Glasgow Central closed from March 8 due to the Union Street fire, teams moved quickly to plan and carry out a [\u2026]\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=392684\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-03-24T10:29:13+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-03-24T10:29:13+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Major engineering work delivered at Glasgow Central during emergency closure - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Network Rail engineers seized the rare opportunity of the closure of Scotland\u2019s busiest station to deliver an extensive package of maintenance and renewals that would ordinarily have taken around ten months to complete. With Glasgow Central closed from March 8 due to the Union Street fire, teams moved quickly to plan and carry out a [\u2026]\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=392684#blogposting\",\"name\":\"Major engineering work delivered at Glasgow Central during emergency closure - VibeWire Magazine\",\"headline\":\"Major engineering work delivered at Glasgow Central during emergency closure\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/cdn.railuk.co\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/24102709\\\/Glasgow-Central-station-work-Network-Rail-485x360.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=392684\\\/#articleImage\"},\"datePublished\":\"2026-03-24T20:29:13+10:00\",\"dateModified\":\"2026-03-24T20:29:13+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=392684#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=392684#webpage\"},\"articleSection\":\"Electrification, Infrastructure, Permanent Way, Rail News, Stations, UK\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=392684#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=392684#listItem\",\"name\":\"Major engineering work delivered at Glasgow Central during emergency closure\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=392684#listItem\",\"position\":3,\"name\":\"Major engineering work delivered at Glasgow Central during emergency closure\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=392684\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=392684\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=392684#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=392684#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=392684\",\"name\":\"Major engineering work delivered at Glasgow Central during emergency closure - VibeWire Magazine\",\"description\":\"Network Rail engineers seized the rare opportunity of the closure of Scotland\\u2019s busiest station to deliver an extensive package of maintenance and renewals that would ordinarily have taken around ten months to complete. With Glasgow Central closed from March 8 due to the Union Street fire, teams moved quickly to plan and carry out a [\\u2026]\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=392684#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"datePublished\":\"2026-03-24T20:29:13+10:00\",\"dateModified\":\"2026-03-24T20:29:13+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Major engineering work delivered at Glasgow Central during emergency closure - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Major engineering work delivered at Glasgow Central during emergency closure - VibeWire Magazine","description":"Network Rail engineers seized the rare opportunity of the closure of Scotland\u2019s busiest station to deliver an extensive package of maintenance and renewals that would ordinarily have taken around ten months to complete. With Glasgow Central closed from March 8 due to the Union Street fire, teams moved quickly to plan and carry out a [\u2026]","canonical_url":"https:\/\/www.vibewire.com.au\/?p=392684","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=392684#blogposting","name":"Major engineering work delivered at Glasgow Central during emergency closure - VibeWire Magazine","headline":"Major engineering work delivered at Glasgow Central during emergency closure","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/24102709\/Glasgow-Central-station-work-Network-Rail-485x360.png","@id":"https:\/\/www.vibewire.com.au\/?p=392684\/#articleImage"},"datePublished":"2026-03-24T20:29:13+10:00","dateModified":"2026-03-24T20:29:13+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=392684#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=392684#webpage"},"articleSection":"Electrification, Infrastructure, Permanent Way, Rail News, Stations, UK"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=392684#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=392684#listItem","name":"Major engineering work delivered at Glasgow Central during emergency closure"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=392684#listItem","position":3,"name":"Major engineering work delivered at Glasgow Central during emergency closure","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=392684\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=392684\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=392684#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=392684#webpage","url":"https:\/\/www.vibewire.com.au\/?p=392684","name":"Major engineering work delivered at Glasgow Central during emergency closure - VibeWire Magazine","description":"Network Rail engineers seized the rare opportunity of the closure of Scotland\u2019s busiest station to deliver an extensive package of maintenance and renewals that would ordinarily have taken around ten months to complete. With Glasgow Central closed from March 8 due to the Union Street fire, teams moved quickly to plan and carry out a [\u2026]","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=392684#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"datePublished":"2026-03-24T20:29:13+10:00","dateModified":"2026-03-24T20:29:13+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Major engineering work delivered at Glasgow Central during emergency closure - VibeWire Magazine","og:description":"Network Rail engineers seized the rare opportunity of the closure of Scotland\u2019s busiest station to deliver an extensive package of maintenance and renewals that would ordinarily have taken around ten months to complete. With Glasgow Central closed from March 8 due to the Union Street fire, teams moved quickly to plan and carry out a [\u2026]","og:url":"https:\/\/www.vibewire.com.au\/?p=392684","article:published_time":"2026-03-24T10:29:13+00:00","article:modified_time":"2026-03-24T10:29:13+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Major engineering work delivered at Glasgow Central during emergency closure - VibeWire Magazine","twitter:description":"Network Rail engineers seized the rare opportunity of the closure of Scotland\u2019s busiest station to deliver an extensive package of maintenance and renewals that would ordinarily have taken around ten months to complete. With Glasgow Central closed from March 8 due to the Union Street fire, teams moved quickly to plan and carry out a [\u2026]","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"392684","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-03-24 10:30:20","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2026-03-24 10:29:30","updated":"2026-03-24 10:30:20"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tMajor engineering work delivered at Glasgow Central during emergency closure\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"Major engineering work delivered at Glasgow Central during emergency closure","link":"https:\/\/www.vibewire.com.au\/?p=392684"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/392684","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=392684"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/392684\/revisions"}],"predecessor-version":[{"id":392719,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/392684\/revisions\/392719"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=392684"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=392684"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=392684"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}