{"id":389555,"date":"2026-03-19T23:26:12","date_gmt":"2026-03-19T13:26:12","guid":{"rendered":"https:\/\/railuk.com\/?p=190838"},"modified":"2026-03-19T23:26:12","modified_gmt":"2026-03-19T13:26:12","slug":"signalling-overhaul-nears-completion-affecting-services-on-the-leeds-knaresborough-route","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=389555","title":{"rendered":"Signalling overhaul nears completion, affecting services on the Leeds\u2013Knaresborough route"},"content":{"rendered":"<p><a href=\"https:\/\/railuk.com\/rail-news\/signalling-overhaul-nears-completion-affecting-services-on-the-leeds-knaresborough-route\/\" title=\"Signalling overhaul nears completion, affecting services on the Leeds\u2013Knaresborough route\" rel=\"nofollow\"><img loading=\"lazy\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/19113644\/New-collapsible-signals-at-Leeds_cropped-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\" style=\"display: block; margin-bottom: 5px; clear:both;max-width: 100%;\" link_thumbnail=\"1\" decoding=\"async\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/19113644\/New-collapsible-signals-at-Leeds_cropped-485x360.jpg 485w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/19113644\/New-collapsible-signals-at-Leeds_cropped-80x60.jpg 80w\" sizes=\"auto, (max-width: 485px) 100vw, 485px\" \/><\/a><\/p>\n<p>An important milestone in a signalling upgrade project will affect passenger services between Leeds and Knaresborough on Sunday 22 March.<\/p>\n<p>Network Rail is carrying out improvement work between Horsforth station and Armley Junction from 19 January to 30 March. This involves replacing life-expired signal control cases, track circuit equipment and signals to improve the reliability of rail services.<\/p>\n<p>Renewal of these assets reduces the need for maintenance activity by making potential faults far less frequent. Collapsible signal posts are being installed to avoid the need for working at height, helping to make the network safer for railway colleagues.<\/p>\n<p>The work so far has been carried out during night shifts to minimise passenger disruption. However, the new equipment will be tested and commissioned this weekend, which will mean buses replace trains between Leeds and Knaresborough on Sunday 22 March.<\/p>\n<p>Also taking place will be the refurbishment of signals and crossings (also known as points \u2013 the sections of track allowing trains to switch between lines) at Harrogate, making the most of the time when trains will not be running.<\/p>\n<p>On Sunday 22 March, Northern will have buses operating between Leeds and Knaresborough. LNER will have no trains running between Leeds and Harrogate. Tickets can be used on Northern\u2019s replacement bus services between Leeds and Harrogate.<\/p>\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/19113639\/Resignalling-work-between-Horsforth-station-and-Armley-Junction.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"768\" height=\"1024\" data-id=\"190841\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/19113639\/Resignalling-work-between-Horsforth-station-and-Armley-Junction-768x1024.jpg\" alt=\"\" class=\"wp-image-190841\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/19113639\/Resignalling-work-between-Horsforth-station-and-Armley-Junction-768x1024.jpg 768w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/19113639\/Resignalling-work-between-Horsforth-station-and-Armley-Junction-225x300.jpg 225w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/19113639\/Resignalling-work-between-Horsforth-station-and-Armley-Junction-1152x1536.jpg 1152w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/19113639\/Resignalling-work-between-Horsforth-station-and-Armley-Junction-315x420.jpg 315w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/19113639\/Resignalling-work-between-Horsforth-station-and-Armley-Junction-696x928.jpg 696w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/19113639\/Resignalling-work-between-Horsforth-station-and-Armley-Junction-1068x1424.jpg 1068w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/19113639\/Resignalling-work-between-Horsforth-station-and-Armley-Junction.jpg 1536w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/a><\/figure>\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/19113639\/New-collapsible-signals-at-Leeds.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"980\" data-id=\"190840\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/19113639\/New-collapsible-signals-at-Leeds-1024x980.jpg\" alt=\"\" class=\"wp-image-190840\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/19113639\/New-collapsible-signals-at-Leeds-1024x980.jpg 1024w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/19113639\/New-collapsible-signals-at-Leeds-300x287.jpg 300w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/19113639\/New-collapsible-signals-at-Leeds-768x735.jpg 768w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/19113639\/New-collapsible-signals-at-Leeds-439x420.jpg 439w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/19113639\/New-collapsible-signals-at-Leeds-696x666.jpg 696w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/19113639\/New-collapsible-signals-at-Leeds-1068x1022.jpg 1068w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/19113639\/New-collapsible-signals-at-Leeds.jpg 1363w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n<\/figure>\n<p><strong>Karen Duffy, Network Rail operations director, said:<\/strong><\/p>\n<p>\u201cThese essential upgrades will replace ageing signalling equipment with modern, more reliable technology that will help keep services running smoothly for passengers and improve safety for railway workers.<\/p>\n<p>\u201cWe\u2019re grateful for the public\u2019s patience and understanding as we carry out this work, and we\u2019re sorry to anyone whose journey is affected when buses replace trains between Leeds and Knaresborough on Sunday 22 March. Please remember to check before you travel.\u201d<\/p>\n<p><strong>A spokesperson for Northern and LNER said:<\/strong><\/p>\n<p>\u201cWe\u2019re working closely with Network Rail while these important signalling upgrades take place, and arrangements are in place to keep customers moving on Sunday 22 March. We\u2019d like to thank all customers for their patience while this essential work is carried out and encourage everyone to check their journey before travelling.\u201d<\/p>\n<p>Image credit: Network Rail<\/p>\n","protected":false},"excerpt":{"rendered":"<p><a href=\"https:\/\/railuk.com\/rail-news\/signalling-overhaul-nears-completion-affecting-services-on-the-leeds-knaresborough-route\/\" title=\"Signalling overhaul nears completion, affecting services on the Leeds\u2013Knaresborough route\" rel=\"nofollow\"><img loading=\"lazy\" decoding=\"async\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/03\/19113644\/New-collapsible-signals-at-Leeds_cropped-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\"><\/a>An important milestone in a signalling upgrade project will affect passenger services between Leeds and Knaresborough on Sunday 22 March. Network Rail is carrying out improvement work between Horsforth station and Armley Junction from 19 January to 30 March. This involves replacing life-expired signal control cases, track circuit equipment and signals to improve the reliability [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[47,16115,85],"tags":[],"class_list":["post-389555","post","type-post","status-publish","format-standard","hentry","category-rail-news","category-signalling-and-telecoms","category-uk"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/389555","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=389555"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/389555\/revisions"}],"predecessor-version":[{"id":390016,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/389555\/revisions\/390016"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=389555"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=389555"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=389555"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}