{"id":3828,"date":"2024-01-19T15:36:58","date_gmt":"2024-01-19T05:36:58","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=3828"},"modified":"2024-01-19T15:36:58","modified_gmt":"2024-01-19T05:36:58","slug":"romania-selects-alstom-for-locomotive-contract","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=3828","title":{"rendered":"Romania selects Alstom for locomotive contract"},"content":{"rendered":"<p>ROMANIA\u2019s Railway Reform Authority (ARF) has confirmed Alstom as the winner of a tender to supply 16 four-axle 25kV ac electric locomotives.<\/p>\n<p>The locomotives will be capable of 160-200km\/h operation and will be used by CFR-C\u0103l\u0103tori to haul 16-car passenger trains operated under three public service obligation (PSO) contracts on the following lines:<\/p>\n<p>Dej &#8211; Bra\u0219ov &#8211; Bucharest &#8211; Constan\u021ba<\/p>\n<p>Timi\u0219oara &#8211; Arad &#8211; Bra\u0219ov &#8211; Bucharest &#8211; Constan\u021ba<\/p>\n<p>Timisoara &#8211; Cluj-Napoca &#8211; Iasi, and<\/p>\n<p>Iasi\/Suceava &#8211; Bucharest &#8211; Constan\u021ba.<\/p>\n<p>Alstom will also provide maintenance and service the locomotives for 20 years. The total value of the contract is Lei 767.5m ($US 168m). It includes an option to extend the maintenance element for a further 20 years.<\/p>\n<p>The project is being financed through the European Union (EU)-supported National Recovery and Resilience Plan and from the budget of the Ministry of Transport and Infrastructure.<\/p>\n<p>Alstom was the sole participant in the tender. The contract is set to be signed provided there are no objections during a 10-day standstill period.<\/p>\n<p><em>For detailed data on fleet orders from around the world, subscribe to <a href=\"https:\/\/irjpro.com\/\">IRJ Pro<\/a>.<\/em><\/p>\n<p>The post <a href=\"https:\/\/www.railjournal.com\/locomotives\/romania-selects-alstom-for-locomotive-contract\/\">Romania selects Alstom for locomotive contract<\/a> appeared first on <a href=\"https:\/\/www.railjournal.com\/\">International Railway Journal<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>ROMANIA\u2019s Railway Reform Authority (ARF) has confirmed Alstom as the winner of a tender to supply 16 four-axle 25kV ac electric locomotives. The locomotives will [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[47,5],"tags":[],"class_list":["post-3828","post","type-post","status-publish","format-standard","hentry","category-rail-news","category-transport"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/3828","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3828"}],"version-history":[{"count":0,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/3828\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3828"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3828"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3828"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}