{"id":380511,"date":"2026-03-05T14:05:11","date_gmt":"2026-03-05T04:05:11","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=380511"},"modified":"2026-03-05T14:06:39","modified_gmt":"2026-03-05T04:06:39","slug":"cloud-carrier-proposes-gas-fired-power-station-to-power-moss-vale-ai-data-centre","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=380511","title":{"rendered":"Cloud Carrier proposes gas-fired power station to power Moss Vale AI data centre"},"content":{"rendered":"\n<p>A small town in the NSW Southern Highlands is watching the AI revolution take shape in its backyard, as plans emerge to build one of the state&#8217;s largest gas-fired power stations to run a data-processing complex.<\/p>\n\n\n\n<p>The proposal from Sydney company Cloud Carrier would see three data centres and a 700-megawatt (MW) power station built on a site six kilometres from Moss Vale.<\/p>\n\n\n\n<p>The power plant would be made up of 21 reciprocating engines, rather than the turbines used in traditional peaking power stations, generating enough energy to run 70,000 homes<\/p>\n\n\n\n<p>As the state prepares for more and more data centres to come online in the AI age, the project provides an insight into their enormous energy requirements.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\" id=\"106406646\"><img loading=\"lazy\" decoding=\"async\" width=\"862\" height=\"575\" src=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/03\/image_2026-03-05_145937844.png\" alt=\"\" class=\"wp-image-380603\" srcset=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/03\/image_2026-03-05_145937844.png 862w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/03\/image_2026-03-05_145937844-300x200.png 300w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/03\/image_2026-03-05_145937844-768x512.png 768w\" sizes=\"auto, (max-width: 862px) 100vw, 862px\" \/><figcaption class=\"wp-element-caption\">Toby Walsh, an AI expert, says the project should be rolled out in a responsible way.&nbsp;(ABC News: Berge Breiland)<\/figcaption><\/figure>\n<\/div>\n\n\n<p>Professor Toby Walsh is chief scientist at the University of NSW AI Institute.<\/p>\n\n\n\n<p>&#8220;I don&#8217;t think we fully appreciate the physical size of the infrastructure that&#8217;s needed to give us AI services, to give us the digital services that we&#8217;re increasingly using,&#8221; he said.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>&#8220;If we&#8217;re not careful, this is going to be another major sink of electricity and also a use of valuable water.&#8221;<\/p>\n<\/blockquote>\n\n\n\n<p>&#8220;We&#8217;ve got to roll this out in a responsible way.&#8221;<\/p>\n\n\n\n<p>There are already 90 data-centre projects up and running in NSW and dozens more approved or in the planning pipeline.<\/p>\n\n\n\n<p>&#8220;NSW is really keen to see the investment and the potential in terms of data centres,&#8221; Environment Minister Penny Sharpe told Budget Estimates last week.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>&#8220;You can&#8217;t go anywhere without people talking about AI, talking about the importance of data centres.&#8221;<\/p>\n<\/blockquote>\n\n\n\n<h2 class=\"wp-block-heading\">Gas for data<\/h2>\n\n\n\n<p>Cloud Carrier has already constructed one small data centre on the site, and hopes to have the full &#8220;campus&#8221; up and running in five to eight years.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\" id=\"106406666\"><img loading=\"lazy\" decoding=\"async\" width=\"862\" height=\"575\" src=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/03\/image_2026-03-05_145953488.png\" alt=\"\" class=\"wp-image-380604\" srcset=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/03\/image_2026-03-05_145953488.png 862w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/03\/image_2026-03-05_145953488-300x200.png 300w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/03\/image_2026-03-05_145953488-768x512.png 768w\" sizes=\"auto, (max-width: 862px) 100vw, 862px\" \/><figcaption class=\"wp-element-caption\">Greg Jackson says gas-fired generation is the company&#8217;s best option.&nbsp;(ABC Illawarra: Penny Burfitt)<\/figcaption><\/figure>\n<\/div>\n\n\n<p>Its lead engineer, Greg Jackson, said the company was building essential infrastructure needed for the country&#8217;s future.<\/p>\n\n\n\n<p>&#8220;Potentially, you could support the data requirements of the federal government in this space,&#8221; he said.<\/p>\n\n\n\n<p>He said the project would use no town water, thanks to a chip-cooling system that recycled water harvested on site on a loop.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\" id=\"106406836\"><img loading=\"lazy\" decoding=\"async\" width=\"862\" height=\"575\" src=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/03\/image_2026-03-05_150005692.png\" alt=\"\" class=\"wp-image-380605\" srcset=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/03\/image_2026-03-05_150005692.png 862w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/03\/image_2026-03-05_150005692-300x200.png 300w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/03\/image_2026-03-05_150005692-768x512.png 768w\" sizes=\"auto, (max-width: 862px) 100vw, 862px\" \/><figcaption class=\"wp-element-caption\">The data centre recycles the same water, supplied from its own harvesting on-site.&nbsp;(ABC News: Toby Hemmings)<\/figcaption><\/figure>\n<\/div>\n\n\n<p>But he said the amount of power needed for the high-capacity chips used to store and process AI exceeded the grid&#8217;s capability in the area.<\/p>\n\n\n\n<p>&#8220;For reliability and economic reasons, pipeline natural gas is a suitable fuel,&#8221; he said.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>&#8220;That is transitioning to more renewable fuels and as they become available, we will transition our plant to use those fuels.&#8221;<\/p>\n<\/blockquote>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\" id=\"106406758\"><img loading=\"lazy\" decoding=\"async\" width=\"862\" height=\"575\" src=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/03\/image_2026-03-05_150016935.png\" alt=\"\" class=\"wp-image-380606\" srcset=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/03\/image_2026-03-05_150016935.png 862w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/03\/image_2026-03-05_150016935-300x200.png 300w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2026\/03\/image_2026-03-05_150016935-768x512.png 768w\" sizes=\"auto, (max-width: 862px) 100vw, 862px\" \/><figcaption class=\"wp-element-caption\">Greg Jackson says Cloud Carrier plans to build 21 gas-fired generator halls to run their AI data centres.&nbsp;(ABC Illawarra: Penny Burfitt)<\/figcaption><\/figure>\n<\/div>\n\n\n<p>Mr Jackson said the company would treat its emissions and reduce the plant&#8217;s pollutants to well below the NSW Environment Protection Authority&#8217;s limits for the area.<\/p>\n\n\n\n<p>He said the company wanted to be &#8220;a partner in the region,&#8221; and was committed to employing from the local area.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Cloud Carrier plans to power its data centres with on-site gas-fired engines, producing enough energy to power 70,000 homes.<\/p>\n","protected":false},"author":90574,"featured_media":380608,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[35,12785],"tags":[19770,10114,5026],"class_list":["post-380511","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-breaking-news","category-data-centre","tag-cloud-carrier","tag-moss-vale","tag-nsw"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/380511","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/90574"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=380511"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/380511\/revisions"}],"predecessor-version":[{"id":380609,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/380511\/revisions\/380609"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/media\/380608"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=380511"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=380511"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=380511"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}