{"id":380326,"date":"2026-03-05T00:00:00","date_gmt":"2026-03-04T14:00:00","guid":{"rendered":"https:\/\/www.railadvent.co.uk\/?p=941524"},"modified":"2026-03-05T00:00:00","modified_gmt":"2026-03-04T14:00:00","slug":"four-weekends-of-disruption-on-the-east-coast-main-line-starts-this-saturday","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=380326","title":{"rendered":"Four weekends of disruption on the East Coast Main Line starts this Saturday"},"content":{"rendered":"<p><img loading=\"lazy\" width=\"640\" height=\"361\" src=\"https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2026\/03\/Track-renewal-200_cropped-1278x720.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"Renewing track on the East Coast Main Line. \/\/ Credit: Network Rail\" style=\"display: block; margin: auto; margin-bottom: 10px; max-width: 100%;\" decoding=\"async\" srcset=\"https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2026\/03\/Track-renewal-200_cropped-1278x720.jpg 1278w, https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2026\/03\/Track-renewal-200_cropped-300x169.jpg 300w, https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2026\/03\/Track-renewal-200_cropped-768x433.jpg 768w, https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2026\/03\/Track-renewal-200_cropped-750x422.jpg 750w, https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2026\/03\/Track-renewal-200_cropped-360x203.jpg 360w, https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2026\/03\/Track-renewal-200_cropped-624x351.jpg 624w, https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2026\/03\/Track-renewal-200_cropped-600x338.jpg 600w, https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2026\/03\/Track-renewal-200_cropped.jpg 1280w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/>For the next four weekends, services between York and Newcastle on the East Coast Main Line will be disrupted because of major engineering work.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>For the next four weekends, services between York and Newcastle on the East Coast Main Line will be disrupted because of major engineering work.<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[2335,3620,3731,3674,1757,3675,2317,3680,4973,2309,113,2542,3722,2663,3013,47,2537,3735,3165,2543],"tags":[12406],"class_list":["post-380326","post","type-post","status-publish","format-standard","hentry","category-bedford","category-darlington","category-durham","category-east-coast-digital-programme","category-east-coast-main-line","category-ecdp","category-hertfordshire","category-hitchin","category-london-kings-cross","category-network","category-network-rail","category-newcastle","category-northallerton","category-peterborough","category-rail-delivery-group","category-rail-news","category-signalling","category-sunderland","category-thameslink","category-york","tag-rail-advent"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/380326","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=380326"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/380326\/revisions"}],"predecessor-version":[{"id":380328,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/380326\/revisions\/380328"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=380326"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=380326"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=380326"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}