{"id":372890,"date":"2026-02-20T21:22:00","date_gmt":"2026-02-20T11:22:00","guid":{"rendered":"https:\/\/railuk.com\/?p=189583"},"modified":"2026-02-20T21:22:00","modified_gmt":"2026-02-20T11:22:00","slug":"rare-glimpse-inside-stations-clocktower-as-restoration-ticks-along","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=372890","title":{"rendered":"Rare glimpse inside station\u2019s clocktower as restoration ticks along"},"content":{"rendered":"<p><a href=\"https:\/\/railuk.com\/heritage\/rare-glimpse-inside-stations-clocktower-as-restoration-ticks-along\/\" title=\"Rare glimpse inside station\u2019s clocktower as restoration ticks along\" rel=\"nofollow\"><img loading=\"lazy\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105448\/Scarborough-clocktower-1_cropped-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\" style=\"display: block; margin-bottom: 5px; clear:both;max-width: 100%;\" link_thumbnail=\"1\" decoding=\"async\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105448\/Scarborough-clocktower-1_cropped-485x360.jpg 485w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105448\/Scarborough-clocktower-1_cropped-80x60.jpg 80w\" sizes=\"auto, (max-width: 485px) 100vw, 485px\" \/><\/a><\/p>\n<p>Network Rail\u2019s ongoing transformation of Scarborough station has allowed this rare view inside the grade II-listed building\u2019s clocktower.<\/p>\n<p>The \u00a314 million upgrade includes a new roof, drainage systems, restored stonework and refurbished waiting room and ticket office.<\/p>\n<p>A Railway Heritage Trust grant of \u00a3203,000 has allowed for the restoration of the clocktower as an additional benefit while the scaffolding is in place.<\/p>\n<p>The clock hands are being regilded using 23\u00be-carat, double-thick English gold leaf&nbsp;\u2013 a traditional heritage technique. This is the same type of craftsmanship used on historical cathedral clocks.<\/p>\n<p>The gear mechanisms, which partly protrude into the open sea air, have suffered weather damage and are being carefully dismantled, cleaned, repainted, regreased, and reassembled.<\/p>\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105433\/Scarborough-clocktower-2-scaled.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105433\/Scarborough-clocktower-2-1024x768.jpeg\" alt=\"\" class=\"wp-image-189586\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105433\/Scarborough-clocktower-2-1024x768.jpeg 1024w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105433\/Scarborough-clocktower-2-300x225.jpeg 300w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105433\/Scarborough-clocktower-2-768x576.jpeg 768w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105433\/Scarborough-clocktower-2-1536x1152.jpeg 1536w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105433\/Scarborough-clocktower-2-2048x1536.jpeg 2048w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105433\/Scarborough-clocktower-2-560x420.jpeg 560w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105433\/Scarborough-clocktower-2-80x60.jpeg 80w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105433\/Scarborough-clocktower-2-696x522.jpeg 696w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105433\/Scarborough-clocktower-2-1068x801.jpeg 1068w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105433\/Scarborough-clocktower-2-1920x1440.jpeg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n<p><strong>Ann Shannon, scheme project manager for Network Rail, said:<\/strong><\/p>\n<p>\u201cOur work to upgrade Scarborough station was already extensive and will transform the experience for passengers.<\/p>\n<p>\u201cThe Railway Heritage Trust grant has meant we\u2019ve been able to achieve even more with this exciting project. The restoration of the clocktower, with upgraded lighting, will be the crowning glory of this landmark building. We can\u2019t wait for the public to see the significant improvements when the project is completed.\u201d<\/p>\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105418\/Scarborough-clocktower-scaffolding-1.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"189584\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105418\/Scarborough-clocktower-scaffolding-1-1024x576.jpeg\" alt=\"\" class=\"wp-image-189584\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105418\/Scarborough-clocktower-scaffolding-1-1024x576.jpeg 1024w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105418\/Scarborough-clocktower-scaffolding-1-300x169.jpeg 300w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105418\/Scarborough-clocktower-scaffolding-1-768x432.jpeg 768w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105418\/Scarborough-clocktower-scaffolding-1-1536x864.jpeg 1536w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105418\/Scarborough-clocktower-scaffolding-1-747x420.jpeg 747w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105418\/Scarborough-clocktower-scaffolding-1-696x392.jpeg 696w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105418\/Scarborough-clocktower-scaffolding-1-1068x601.jpeg 1068w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105418\/Scarborough-clocktower-scaffolding-1.jpeg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105419\/Scarborough-roof-inside-trainshed-1_cropped.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"577\" data-id=\"189585\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105419\/Scarborough-roof-inside-trainshed-1_cropped-1024x577.jpg\" alt=\"\" class=\"wp-image-189585\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105419\/Scarborough-roof-inside-trainshed-1_cropped-1024x577.jpg 1024w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105419\/Scarborough-roof-inside-trainshed-1_cropped-300x169.jpg 300w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105419\/Scarborough-roof-inside-trainshed-1_cropped-768x432.jpg 768w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105419\/Scarborough-roof-inside-trainshed-1_cropped-1536x865.jpg 1536w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105419\/Scarborough-roof-inside-trainshed-1_cropped-746x420.jpg 746w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105419\/Scarborough-roof-inside-trainshed-1_cropped-696x392.jpg 696w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105419\/Scarborough-roof-inside-trainshed-1_cropped-1068x601.jpg 1068w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105419\/Scarborough-roof-inside-trainshed-1_cropped.jpg 1545w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n<\/figure>\n<p><strong>Tim Hedley-Jones, director of the Railway Heritage Trust, said:<\/strong><\/p>\n<p>\u201cWe have given many grants to help restore railway clocks over our 40-year history. Clocks and clocktowers provide important focal points for stations and the example at Scarborough is one of the best in the country. We are pleased that Network Rail is taking an exemplary approach to its restoration.\u201d<\/p>\n<p>Roof repairs were started in 2021. After funding constraints were overcome, the full restoration began in spring last year.<\/p>\n<p>Image credit: Network Rail<\/p>\n","protected":false},"excerpt":{"rendered":"<p><a href=\"https:\/\/railuk.com\/heritage\/rare-glimpse-inside-stations-clocktower-as-restoration-ticks-along\/\" title=\"Rare glimpse inside station\u2019s clocktower as restoration ticks along\" rel=\"nofollow\"><img loading=\"lazy\" decoding=\"async\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105448\/Scarborough-clocktower-1_cropped-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\"><\/a>Network Rail\u2019s ongoing transformation of Scarborough station has allowed this rare view inside the grade II-listed building\u2019s clocktower. The \u00a314 million upgrade includes a new roof, drainage systems, restored stonework and refurbished waiting room and ticket office. A Railway Heritage Trust grant of \u00a3203,000 has allowed for the restoration of the clocktower as an additional [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[16013,4920,47,16092,85],"tags":[],"class_list":["post-372890","post","type-post","status-publish","format-standard","hentry","category-general-interest","category-heritage","category-rail-news","category-stations","category-uk"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.10 - aioseo.com -->\n\t<meta name=\"description\" content=\"Network Rail\u2019s ongoing transformation of Scarborough station has allowed this rare view inside the grade II-listed building\u2019s clocktower. The \u00a314 million upgrade includes a new roof, drainage systems, restored stonework and refurbished waiting room and ticket office. A Railway Heritage Trust grant of \u00a3203,000 has allowed for the restoration of the clocktower as an additional [\u2026]\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=372890\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.10\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Rare glimpse inside station\u2019s clocktower as restoration ticks along - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Network Rail\u2019s ongoing transformation of Scarborough station has allowed this rare view inside the grade II-listed building\u2019s clocktower. The \u00a314 million upgrade includes a new roof, drainage systems, restored stonework and refurbished waiting room and ticket office. A Railway Heritage Trust grant of \u00a3203,000 has allowed for the restoration of the clocktower as an additional [\u2026]\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=372890\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-02-20T11:22:00+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-02-20T11:22:00+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Rare glimpse inside station\u2019s clocktower as restoration ticks along - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Network Rail\u2019s ongoing transformation of Scarborough station has allowed this rare view inside the grade II-listed building\u2019s clocktower. The \u00a314 million upgrade includes a new roof, drainage systems, restored stonework and refurbished waiting room and ticket office. A Railway Heritage Trust grant of \u00a3203,000 has allowed for the restoration of the clocktower as an additional [\u2026]\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=372890#blogposting\",\"name\":\"Rare glimpse inside station\\u2019s clocktower as restoration ticks along - VibeWire Magazine\",\"headline\":\"Rare glimpse inside station\\u2019s clocktower as restoration ticks along\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/cdn.railuk.co\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/20105448\\\/Scarborough-clocktower-1_cropped-485x360.jpg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=372890\\\/#articleImage\"},\"datePublished\":\"2026-02-20T21:22:00+10:00\",\"dateModified\":\"2026-02-20T21:22:00+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=372890#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=372890#webpage\"},\"articleSection\":\"General Interest, heritage, Rail News, Stations, UK\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=372890#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=372890#listItem\",\"name\":\"Rare glimpse inside station\\u2019s clocktower as restoration ticks along\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=372890#listItem\",\"position\":3,\"name\":\"Rare glimpse inside station\\u2019s clocktower as restoration ticks along\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=372890\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=372890\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=372890#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=372890#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=372890\",\"name\":\"Rare glimpse inside station\\u2019s clocktower as restoration ticks along - VibeWire Magazine\",\"description\":\"Network Rail\\u2019s ongoing transformation of Scarborough station has allowed this rare view inside the grade II-listed building\\u2019s clocktower. The \\u00a314 million upgrade includes a new roof, drainage systems, restored stonework and refurbished waiting room and ticket office. A Railway Heritage Trust grant of \\u00a3203,000 has allowed for the restoration of the clocktower as an additional [\\u2026]\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=372890#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"datePublished\":\"2026-02-20T21:22:00+10:00\",\"dateModified\":\"2026-02-20T21:22:00+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Rare glimpse inside station\u2019s clocktower as restoration ticks along - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Rare glimpse inside station\u2019s clocktower as restoration ticks along - VibeWire Magazine","description":"Network Rail\u2019s ongoing transformation of Scarborough station has allowed this rare view inside the grade II-listed building\u2019s clocktower. The \u00a314 million upgrade includes a new roof, drainage systems, restored stonework and refurbished waiting room and ticket office. A Railway Heritage Trust grant of \u00a3203,000 has allowed for the restoration of the clocktower as an additional [\u2026]","canonical_url":"https:\/\/www.vibewire.com.au\/?p=372890","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=372890#blogposting","name":"Rare glimpse inside station\u2019s clocktower as restoration ticks along - VibeWire Magazine","headline":"Rare glimpse inside station\u2019s clocktower as restoration ticks along","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/20105448\/Scarborough-clocktower-1_cropped-485x360.jpg","@id":"https:\/\/www.vibewire.com.au\/?p=372890\/#articleImage"},"datePublished":"2026-02-20T21:22:00+10:00","dateModified":"2026-02-20T21:22:00+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=372890#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=372890#webpage"},"articleSection":"General Interest, heritage, Rail News, Stations, UK"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=372890#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=372890#listItem","name":"Rare glimpse inside station\u2019s clocktower as restoration ticks along"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=372890#listItem","position":3,"name":"Rare glimpse inside station\u2019s clocktower as restoration ticks along","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=372890\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=372890\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=372890#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=372890#webpage","url":"https:\/\/www.vibewire.com.au\/?p=372890","name":"Rare glimpse inside station\u2019s clocktower as restoration ticks along - VibeWire Magazine","description":"Network Rail\u2019s ongoing transformation of Scarborough station has allowed this rare view inside the grade II-listed building\u2019s clocktower. The \u00a314 million upgrade includes a new roof, drainage systems, restored stonework and refurbished waiting room and ticket office. A Railway Heritage Trust grant of \u00a3203,000 has allowed for the restoration of the clocktower as an additional [\u2026]","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=372890#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"datePublished":"2026-02-20T21:22:00+10:00","dateModified":"2026-02-20T21:22:00+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Rare glimpse inside station\u2019s clocktower as restoration ticks along - VibeWire Magazine","og:description":"Network Rail\u2019s ongoing transformation of Scarborough station has allowed this rare view inside the grade II-listed building\u2019s clocktower. The \u00a314 million upgrade includes a new roof, drainage systems, restored stonework and refurbished waiting room and ticket office. A Railway Heritage Trust grant of \u00a3203,000 has allowed for the restoration of the clocktower as an additional [\u2026]","og:url":"https:\/\/www.vibewire.com.au\/?p=372890","article:published_time":"2026-02-20T11:22:00+00:00","article:modified_time":"2026-02-20T11:22:00+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Rare glimpse inside station\u2019s clocktower as restoration ticks along - VibeWire Magazine","twitter:description":"Network Rail\u2019s ongoing transformation of Scarborough station has allowed this rare view inside the grade II-listed building\u2019s clocktower. The \u00a314 million upgrade includes a new roof, drainage systems, restored stonework and refurbished waiting room and ticket office. A Railway Heritage Trust grant of \u00a3203,000 has allowed for the restoration of the clocktower as an additional [\u2026]","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"372890","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-02-20 12:06:32","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2026-02-20 12:06:27","updated":"2026-02-20 12:06:32"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tRare glimpse inside station\u2019s clocktower as restoration ticks along\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"Rare glimpse inside station\u2019s clocktower as restoration ticks along","link":"https:\/\/www.vibewire.com.au\/?p=372890"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/372890","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=372890"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/372890\/revisions"}],"predecessor-version":[{"id":372891,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/372890\/revisions\/372891"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=372890"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=372890"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=372890"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}