{"id":365945,"date":"2026-02-11T01:10:35","date_gmt":"2026-02-10T15:10:35","guid":{"rendered":"https:\/\/www.railfreight.com\/?p=69266"},"modified":"2026-02-11T01:10:35","modified_gmt":"2026-02-10T15:10:35","slug":"railport-completes-first-finished-vehicle-rail-operation-in-turkiye","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=365945","title":{"rendered":"Railport completes first finished vehicle rail operation in T\u00fcrkiye"},"content":{"rendered":"<p><strong>Railport, the intermodal terminal in Kartepe, T\u00fcrkiye, has completed its first finished vehicle train operation, marking a new milestone for rail-based automotive logistics at the site, according to duisport.<\/strong><br \/>\n<span id=\"more-69266\"><\/span>The inaugural train transported 216 imported finished vehicles from Ford Otosan and arrived at the <a href=\"https:\/\/railport.com.tr\/\"  rel=\"noopener\">Railport terminal<\/a>, where unloading was completed successfully. The operation was carried out by rail and involved several partners across the logistics chain.<\/p>\n<p>The finished vehicle service follows Railport\u2019s earlier operational start, when the terminal launched intermodal services with its first container train in November 2025. <a href=\"https:\/\/railport.com.tr\/\"  rel=\"noopener\">Railport is T\u00fcrkiye\u2019s first private intermodal terminal<\/a> and a joint venture between Arkas Holding and <a href=\"https:\/\/duisport.de\/en\/\"  rel=\"noopener\">duisport<\/a>.<\/p>\n<figure style=\"max-width: 100%; margin: 20px auto; border-radius: 6px; overflow: hidden; box-shadow: 0 2px 8px rgba(0, 0, 0, 0.1);\"><img fetchpriority=\"high\" decoding=\"async\" class=\"fluid alignnone\" style=\"width: 100%; height: auto; display: block;\" src=\"https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/02\/b1d2f84a-735f-4aa4-bdbe-203c60221af8-e1770722802962.jpg\" alt=\"Duisport rail freight terminal\" width=\"960\" height=\"642\" \/><figcaption style=\"padding: 10px 15px; font-size: 14px; background: #f8f8f8; text-align: left; color: #555;\">Image: \u00a9 duisport.<\/figcaption><\/figure>\n<h2>Multi-partner rail operation<\/h2>\n<p><a href=\"https:\/\/duisport.de\/en\/\"  rel=\"noopener\">Duisport<\/a> underlined that the finished vehicle transport was conducted with Mars Logistics acting as the logistics service provider. Ko\u00e7Zer led strategic procurement and process management, while K\u00f6rfez Ula\u015ft\u0131rma was responsible for the continuous execution of rail operations. Transwaggon Group supplied the wagons used for transport.<\/p>\n<p>The terminal itself is equipped with infrastructure specifically designed for handling finished vehicles. <a href=\"https:\/\/railport.com.tr\/\"  rel=\"noopener\">Railport<\/a> covers approximately 22,000 square metres and has a finished vehicle parking capacity of 1,563 vehicles. Dedicated ramps enable import and export operations of finished vehicles by rail.<\/p>\n<aside class=\"readmore\">\n<div class=\"readmore-item\"><a href=\"https:\/\/www.railfreight.com\/intermodal\/2025\/11\/24\/turkish-railport-terminal-launches-operations-with-metrans-train\/\"><img decoding=\"async\" src=\"https:\/\/www.railfreight.com\/wp-content\/uploads\/2025\/11\/Railport-Go%CC%88rsel-5-128x128.jpeg\" alt=\"\" class=\"readmore-thumbnail\" \/><\/a><\/p>\n<div class=\"readmore-info\"><a href=\"https:\/\/www.railfreight.com\/intermodal\/2025\/11\/24\/turkish-railport-terminal-launches-operations-with-metrans-train\/\" class=\"readmore-title\">Turkish Railport terminal launches operations with METRANS train<\/a><\/div>\n<\/div>\n<\/aside>\n<h2>Focus on rail-based vehicle logistics<\/h2>\n<p>With the completion of its first finished vehicle rail operation, <a href=\"https:\/\/railport.com.tr\/\"  rel=\"noopener\">Railport<\/a> is now extending its activities beyond containers to automotive logistics by rail. According to <a href=\"https:\/\/duisport.de\/en\/\"  rel=\"noopener\">duisport<\/a>, the terminal aims to support more efficient and environmentally friendly transport by shifting freight to rail and integrating it into intermodal supply chains.<\/p>\n<p>The operator said the development forms part of its broader strategy to expand rail-based logistics solutions in T\u00fcrkiye, following the terminal\u2019s initial operational launch in late 2025.<\/p>\n<figure style=\"max-width: 100%; margin: 20px auto; border-radius: 6px; overflow: hidden; box-shadow: 0 2px 8px rgba(0, 0, 0, 0.1);\"><img loading=\"lazy\" decoding=\"async\" class=\"fluid alignnone\" style=\"width: 100%; height: auto; display: block;\" src=\"https:\/\/www.railfreight.com\/wp-content\/uploads\/2026\/02\/842485cb-57c1-4328-9f62-30389915308b-e1770722848469.jpg\" alt=\"Duisport rail freight terminal\" width=\"960\" height=\"642\" \/><figcaption style=\"padding: 10px 15px; font-size: 14px; background: #f8f8f8; text-align: left; color: #555;\">Image: \u00a9 duisport.<\/figcaption><\/figure>\n<h2>Becoming a hub<\/h2>\n<p><a href=\"https:\/\/railport.com.tr\/\"  rel=\"noopener\">Railport<\/a> is located around 150 kilometres southeast of Istanbul, at the heart of the Iron Silk Road corridor. Construction of the terminal started in September 2023 and was developed in cooperation with Arkas Holding and <a href=\"https:\/\/duisport.de\/en\/\"  rel=\"noopener\">duisport<\/a>.<\/p>\n<p>Earlier reporting by RailFreight.com noted that, once fully developed, <a href=\"https:\/\/railport.com.tr\/\"  rel=\"noopener\">Railport<\/a> is expected to handle containers, general cargo, trailers, and finished vehicles, supported by advanced operational systems and intermodal connectivity. The terminal has also implemented a dedicated terminal operating system to manage and optimise rail and road flows.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Railport, the intermodal terminal in Kartepe, T\u00fcrkiye, has completed its first finished vehicle train operation, marking a new milestone for rail-based automotive logistics at the\u2026<\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[7383,5326,65,16253,471,47,9971,1186,8804],"tags":[12634],"class_list":["post-365945","post","type-post","status-publish","format-standard","hentry","category-automotive-logistics","category-duisport","category-intermodal","category-intermodal-terminals","category-news","category-rail-news","category-railport","category-terminals","category-turkiye","tag-railfreight"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/365945","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=365945"}],"version-history":[{"count":3,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/365945\/revisions"}],"predecessor-version":[{"id":366386,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/365945\/revisions\/366386"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=365945"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=365945"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=365945"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}