{"id":36563,"date":"2024-05-07T15:29:27","date_gmt":"2024-05-07T05:29:27","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=36563"},"modified":"2024-05-07T15:30:38","modified_gmt":"2024-05-07T05:30:38","slug":"melbournes-long-awaited-airport-rail-hits-more-turbulence","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=36563","title":{"rendered":"Melbourne\u2019s long-awaited Airport Rail hits more turbulence"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The long-awaited&nbsp;<a href=\"https:\/\/www.heraldsun.com.au\/news\/victoria\/10b-airport-rail-link-wont-receive-new-funding-in-state-budget\/news-story\/b3c648ac9ead87e3680cfc38a0bd5041\" target=\"_blank\" rel=\"noreferrer noopener\">$10 bn Melbourne Airport Rail Link<\/a>&nbsp;has hit more turbulence with Treasurer Tim Pallas expecting a delay of \u201cat least four years\u201d amid a bitter stoush with airport operators.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Allan Government has instead staked its credibility on cutting the ribbon on the $14bn Metro Tunnel and the $10.2bn West Gate Tunnel project next year, as it also ramps up works on the contentious $34.5bn Suburban Rail Loop East between Cheltenham and Box Hill.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cost blowouts are still being felt across the budget, worth about 4 per cent across the multi-billion dollar public infrastructure sector \u2013 most of which is due to the eye-watering $10bn overrun at the North East Link being built between the Eastern Freeway and the M80 in Greensborough.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Treasurer said rising prices of materials, labour and transportation have spiked 22 per cent since 2021, battering project budgets.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/image-10.jpeg\" alt=\"Treasurer Tim Pallas is expecting a delay of at least four years for Melbourne\u2019s Airport Rail Link. Picture: Melbourne Airport\" class=\"wp-image-36570\" srcset=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/image-10.jpeg 1024w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/image-10-300x225.jpeg 300w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/image-10-768x576.jpeg 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Treasurer Tim Pallas is expecting a delay of at least four years for Melbourne\u2019s Airport Rail Link. Picture: Melbourne Airport<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Mr Pallas said the redirection of funding away from the long-awaited airport rail link was a \u201csensible decision\u201d given the standoff between the State and the Airport over the location of a station at Tullamarine, which has resulted in a&nbsp;<a href=\"https:\/\/www.heraldsun.com.au\/news\/victoria\/new-mediator-neil-scales-tasked-with-ending-melbourne-airport-rail-link-wars\/news-story\/09602900590043a3254590bfba249ffe\" target=\"_blank\" rel=\"noreferrer noopener\">federal mediator being appointed<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This is despite more than $1bn already spent on early works, including shifting utilities and preparing for major construction.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Treasurer said the airport was locked into building a below ground station but emphatically ruled out the state agreeing to that option, preferring a cheaper and quicker elevated station.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWere the airport operator to see reason and maybe become a good corporate citizen at some point instead of a really good car park operator, then perhaps we might be able to bring those things forward,\u201d he said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The announcement of a four-year delay \u2013 which matches the forward estimates of the Budget \u2013 comes despite the project only being halted last year by former premier Daniel Andrews.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The lengthy delay comes amid a broader shift in Victoria that will see the government tap the brakes on capital spending to a more sustainable long-term infrastructure pipeline.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/image-11.jpeg\" alt=\"\" class=\"wp-image-36572\" srcset=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/image-11.jpeg 1024w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/image-11-300x225.jpeg 300w, https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/image-11-768x576.jpeg 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The Allan government is prioritising other infrastructure projects. Picture: Andrew Henshaw<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThat doesn\u2019t mean going from feast to famine,\u201d he said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cIn this Budget we will progressively return the capital program to pre-Covid levels, to better align with the ability of our economy to deliver,\u201d he said.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cA sustainable, ongoing pipeline will provide certainty to the construction industry, and help them to build critical social and economic infrastructure for all Victorians.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This would see average spending on roads, rail, schools and hospitals to reduce from its peak of $24bn this financial year, to $15.6bn a year over the following four years.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Budget shows a total of $208bn in new and existing projects underway, but Mr Pallas said a shortage of workers and material price hikes had forced a change to the previous approach.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This has also seen about a quarter of projects delayed since last year\u2019s Budget.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Spending across the transport sector has tightened significantly, with a focus on delivering health and education capital projects.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The long-awaited&nbsp;$10 bn Melbourne Airport Rail Link&nbsp;has hit more turbulence with Treasurer Tim Pallas expecting a delay of \u201cat least four years\u201d amid a bitter [&hellip;]<\/p>\n","protected":false},"author":21,"featured_media":36564,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[273,999,513,163],"tags":[472,993,7529,7,8],"class_list":["post-36563","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-australia","category-australia-politics","category-melbourne-airport","category-rail-industry-news-australia-new-zealand","tag-australian","tag-melbourne","tag-melbourne-airport","tag-transport","tag-victoria"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"The long-awaited $10 bn Melbourne Airport Rail Link has hit more turbulence with Treasurer Tim Pallas expecting a delay of \u201cat least four years\u201d amid a bitter stoush with airport operators. The Allan Government has instead staked its credibility on cutting the ribbon on the $14bn Metro Tunnel and the $10.2bn West Gate Tunnel project next year,\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Bardy Bigglesworth\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=36563\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Melbourne\u2019s long-awaited Airport Rail hits more turbulence\" \/>\n\t\t<meta property=\"og:description\" content=\"The long-awaited $10 bn Melbourne Airport Rail Link has hit more turbulence with Treasurer Tim Pallas expecting a delay of \u201cat least four years\u201d amid a bitter stoush with airport operators. The Allan Government has instead staked its credibility on cutting the ribbon on the $14bn Metro Tunnel and the $10.2bn West Gate Tunnel project next year,\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=36563\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Screenshot-2024-05-07-at-3.16.54\u202fPM.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Screenshot-2024-05-07-at-3.16.54\u202fPM.png\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1266\" \/>\n\t\t<meta property=\"og:image:height\" content=\"684\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-05-07T05:29:27+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-05-07T05:30:38+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Melbourne\u2019s long-awaited Airport Rail hits more turbulence\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The long-awaited $10 bn Melbourne Airport Rail Link has hit more turbulence with Treasurer Tim Pallas expecting a delay of \u201cat least four years\u201d amid a bitter stoush with airport operators. The Allan Government has instead staked its credibility on cutting the ribbon on the $14bn Metro Tunnel and the $10.2bn West Gate Tunnel project next year,\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Screenshot-2024-05-07-at-3.16.54\u202fPM.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=36563#blogposting\",\"name\":\"Melbourne\\u2019s long-awaited Airport Rail hits more turbulence\",\"headline\":\"Melbourne\\u2019s long-awaited Airport Rail hits more turbulence\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=21#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/Screenshot-2024-05-07-at-3.16.54\\u202fPM.png\",\"width\":1266,\"height\":684},\"datePublished\":\"2024-05-07T15:29:27+10:00\",\"dateModified\":\"2024-05-07T15:30:38+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=36563#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=36563#webpage\"},\"articleSection\":\"Australia, Australia Politics, Melbourne Airport, Rail industry news (Australia, New Zealand), australian, Melbourne, Melbourne Airport, transport, victoria\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=36563#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"name\":\"Rail industry news (Australia, New Zealand)\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"position\":2,\"name\":\"Rail industry news (Australia, New Zealand)\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=36563#listItem\",\"name\":\"Melbourne\\u2019s long-awaited Airport Rail hits more turbulence\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=36563#listItem\",\"position\":3,\"name\":\"Melbourne\\u2019s long-awaited Airport Rail hits more turbulence\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"name\":\"Rail industry news (Australia, New Zealand)\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=36563\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=36563\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=21#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=21\",\"name\":\"Bardy Bigglesworth\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=36563#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e3d1fce2fc3f81c2cf0bda5fbfee560ac033389e9a3983a9ee462907c5ca5c9d?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Bardy Bigglesworth\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=36563#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=36563\",\"name\":\"Melbourne\\u2019s long-awaited Airport Rail hits more turbulence\",\"description\":\"The long-awaited $10 bn Melbourne Airport Rail Link has hit more turbulence with Treasurer Tim Pallas expecting a delay of \\u201cat least four years\\u201d amid a bitter stoush with airport operators. The Allan Government has instead staked its credibility on cutting the ribbon on the $14bn Metro Tunnel and the $10.2bn West Gate Tunnel project next year,\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=36563#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=21#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=21#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/05\\\/Screenshot-2024-05-07-at-3.16.54\\u202fPM.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=36563\\\/#mainImage\",\"width\":1266,\"height\":684},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=36563#mainImage\"},\"datePublished\":\"2024-05-07T15:29:27+10:00\",\"dateModified\":\"2024-05-07T15:30:38+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Melbourne\u2019s long-awaited Airport Rail hits more turbulence<\/title>\n\n","aioseo_head_json":{"title":"Melbourne\u2019s long-awaited Airport Rail hits more turbulence","description":"The long-awaited $10 bn Melbourne Airport Rail Link has hit more turbulence with Treasurer Tim Pallas expecting a delay of \u201cat least four years\u201d amid a bitter stoush with airport operators. The Allan Government has instead staked its credibility on cutting the ribbon on the $14bn Metro Tunnel and the $10.2bn West Gate Tunnel project next year,","canonical_url":"https:\/\/www.vibewire.com.au\/?p=36563","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=36563#blogposting","name":"Melbourne\u2019s long-awaited Airport Rail hits more turbulence","headline":"Melbourne\u2019s long-awaited Airport Rail hits more turbulence","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=21#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Screenshot-2024-05-07-at-3.16.54\u202fPM.png","width":1266,"height":684},"datePublished":"2024-05-07T15:29:27+10:00","dateModified":"2024-05-07T15:30:38+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=36563#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=36563#webpage"},"articleSection":"Australia, Australia Politics, Melbourne Airport, Rail industry news (Australia, New Zealand), australian, Melbourne, Melbourne Airport, transport, victoria"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=36563#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","name":"Rail industry news (Australia, New Zealand)"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","position":2,"name":"Rail industry news (Australia, New Zealand)","item":"https:\/\/www.vibewire.com.au\/?cat=163","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=36563#listItem","name":"Melbourne\u2019s long-awaited Airport Rail hits more turbulence"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=36563#listItem","position":3,"name":"Melbourne\u2019s long-awaited Airport Rail hits more turbulence","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","name":"Rail industry news (Australia, New Zealand)"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=36563\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=36563\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=21#author","url":"https:\/\/www.vibewire.com.au\/?author=21","name":"Bardy Bigglesworth","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=36563#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/e3d1fce2fc3f81c2cf0bda5fbfee560ac033389e9a3983a9ee462907c5ca5c9d?s=96&d=mm&r=g","width":96,"height":96,"caption":"Bardy Bigglesworth"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=36563#webpage","url":"https:\/\/www.vibewire.com.au\/?p=36563","name":"Melbourne\u2019s long-awaited Airport Rail hits more turbulence","description":"The long-awaited $10 bn Melbourne Airport Rail Link has hit more turbulence with Treasurer Tim Pallas expecting a delay of \u201cat least four years\u201d amid a bitter stoush with airport operators. The Allan Government has instead staked its credibility on cutting the ribbon on the $14bn Metro Tunnel and the $10.2bn West Gate Tunnel project next year,","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=36563#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=21#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=21#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Screenshot-2024-05-07-at-3.16.54\u202fPM.png","@id":"https:\/\/www.vibewire.com.au\/?p=36563\/#mainImage","width":1266,"height":684},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=36563#mainImage"},"datePublished":"2024-05-07T15:29:27+10:00","dateModified":"2024-05-07T15:30:38+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Melbourne\u2019s long-awaited Airport Rail hits more turbulence","og:description":"The long-awaited $10 bn Melbourne Airport Rail Link has hit more turbulence with Treasurer Tim Pallas expecting a delay of \u201cat least four years\u201d amid a bitter stoush with airport operators. The Allan Government has instead staked its credibility on cutting the ribbon on the $14bn Metro Tunnel and the $10.2bn West Gate Tunnel project next year,","og:url":"https:\/\/www.vibewire.com.au\/?p=36563","og:image":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Screenshot-2024-05-07-at-3.16.54\u202fPM.png","og:image:secure_url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Screenshot-2024-05-07-at-3.16.54\u202fPM.png","og:image:width":"1266","og:image:height":"684","article:published_time":"2024-05-07T05:29:27+00:00","article:modified_time":"2024-05-07T05:30:38+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Melbourne\u2019s long-awaited Airport Rail hits more turbulence","twitter:description":"The long-awaited $10 bn Melbourne Airport Rail Link has hit more turbulence with Treasurer Tim Pallas expecting a delay of \u201cat least four years\u201d amid a bitter stoush with airport operators. The Allan Government has instead staked its credibility on cutting the ribbon on the $14bn Metro Tunnel and the $10.2bn West Gate Tunnel project next year,","twitter:creator":"@VibewireCentral","twitter:image":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Screenshot-2024-05-07-at-3.16.54\u202fPM.png"},"aioseo_meta_data":{"post_id":"36563","title":"#post_title","description":null,"keywords":null,"keyphrases":{"focus":{"keyphrase":"","score":0,"analysis":{"keyphraseInTitle":{"score":0,"maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":"#post_excerpt","og_object_type":"default","og_image_type":"featured","og_image_url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/05\/Screenshot-2024-05-07-at-3.16.54\u202fPM.png","og_image_width":"1266","og_image_height":"684","og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"seo_analyzer_scan_date":"2026-06-14 18:12:18","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-05-07 05:29:34","updated":"2026-06-14 18:12:18"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=163\" title=\"Rail industry news (Australia, New Zealand)\">Rail industry news (Australia, New Zealand)<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tMelbourne\u2019s long-awaited Airport Rail hits more turbulence\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail industry news (Australia, New Zealand)","link":"https:\/\/www.vibewire.com.au\/?cat=163"},{"label":"Melbourne\u2019s long-awaited Airport Rail hits more turbulence","link":"https:\/\/www.vibewire.com.au\/?p=36563"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/36563","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=36563"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/36563\/revisions"}],"predecessor-version":[{"id":36573,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/36563\/revisions\/36573"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/media\/36564"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=36563"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=36563"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=36563"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}