{"id":365253,"date":"2026-02-09T22:58:29","date_gmt":"2026-02-09T12:58:29","guid":{"rendered":"https:\/\/railuk.com\/?p=188995"},"modified":"2026-02-09T22:58:29","modified_gmt":"2026-02-09T12:58:29","slug":"trains-through-oxford-running-as-normal-following-successful-bridge-replacement","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=365253","title":{"rendered":"Trains through Oxford running as normal following successful bridge replacement"},"content":{"rendered":"<p><a href=\"https:\/\/railuk.com\/infrastructure\/structures\/trains-through-oxford-running-as-normal-following-successful-bridge-replacement\/\" title=\"Trains through Oxford running as normal following successful bridge replacement\" rel=\"nofollow\"><img loading=\"lazy\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/09120933\/DJI-20260209014538-0007-W_cropped-1-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\" style=\"display: block; margin-bottom: 5px; clear:both;max-width: 100%;\" link_thumbnail=\"1\" decoding=\"async\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/09120933\/DJI-20260209014538-0007-W_cropped-1-485x360.jpg 485w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/09120933\/DJI-20260209014538-0007-W_cropped-1-80x60.jpg 80w\" sizes=\"auto, (max-width: 485px) 100vw, 485px\" \/><\/a><\/p>\n<p>Trains are running through Oxford as normal this morning after Network Rail successfully completed the latest phase of the Oxfordshire Connect programme with the replacement of the Botley Road rail bridge.<\/p>\n<p>The eight-day closure enabled engineers to safely demolish the old structure, install new bridge spans and carry out essential preparatory works that keep the project on track for the full reopening of Botley Road in August 2026.<\/p>\n<p>The temporary walkway diversion through Oxford station has now closed, with the usual route under the bridge reopened for public use. Railway lines between Oxford and Didcot Parkway have also returned to normal operation, following a period of replacement bus services while southbound trains were paused.<\/p>\n<p>Throughout the closure, dozens of volunteers came together to support passengers and local residents navigating the diversion routes, helping people get from A to B safely and efficiently.<\/p>\n<p>Network Rail and construction partner, Kier, have thanked the community for its patience and cooperation during this intensive period of work, as well as the volunteers and station teams who provided 24\/7 support, signage and assistance throughout the diversion.<\/p>\n<p>The bridge replacement is a key milestone in the wider Oxfordshire Connect programme, which will deliver:<\/p>\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/09121010\/Drone-Friday-6-February_new-bridge-spans-in-place-DJI_20260206100750_0004_W-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"188999\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/09121010\/Drone-Friday-6-February_new-bridge-spans-in-place-DJI_20260206100750_0004_W-1024x768.jpg\" alt=\"\" class=\"wp-image-188999\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/09121010\/Drone-Friday-6-February_new-bridge-spans-in-place-DJI_20260206100750_0004_W-1024x768.jpg 1024w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/09121010\/Drone-Friday-6-February_new-bridge-spans-in-place-DJI_20260206100750_0004_W-300x225.jpg 300w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/09121010\/Drone-Friday-6-February_new-bridge-spans-in-place-DJI_20260206100750_0004_W-768x576.jpg 768w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/09121010\/Drone-Friday-6-February_new-bridge-spans-in-place-DJI_20260206100750_0004_W-1536x1152.jpg 1536w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/09121010\/Drone-Friday-6-February_new-bridge-spans-in-place-DJI_20260206100750_0004_W-2048x1536.jpg 2048w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/09121010\/Drone-Friday-6-February_new-bridge-spans-in-place-DJI_20260206100750_0004_W-560x420.jpg 560w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/09121010\/Drone-Friday-6-February_new-bridge-spans-in-place-DJI_20260206100750_0004_W-80x60.jpg 80w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/09121010\/Drone-Friday-6-February_new-bridge-spans-in-place-DJI_20260206100750_0004_W-696x522.jpg 696w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/09121010\/Drone-Friday-6-February_new-bridge-spans-in-place-DJI_20260206100750_0004_W-1068x801.jpg 1068w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/09121010\/Drone-Friday-6-February_new-bridge-spans-in-place-DJI_20260206100750_0004_W-1920x1440.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/09121009\/Botley-Road-Bridge-CGI-NR-1-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"577\" data-id=\"189000\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/09121009\/Botley-Road-Bridge-CGI-NR-1-1024x577.jpg\" alt=\"\" class=\"wp-image-189000\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/09121009\/Botley-Road-Bridge-CGI-NR-1-1024x577.jpg 1024w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/09121009\/Botley-Road-Bridge-CGI-NR-1-300x169.jpg 300w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/09121009\/Botley-Road-Bridge-CGI-NR-1-768x433.jpg 768w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/09121009\/Botley-Road-Bridge-CGI-NR-1-1536x865.jpg 1536w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/09121009\/Botley-Road-Bridge-CGI-NR-1-2048x1154.jpg 2048w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/09121009\/Botley-Road-Bridge-CGI-NR-1-745x420.jpg 745w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/09121009\/Botley-Road-Bridge-CGI-NR-1-696x392.jpg 696w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/09121009\/Botley-Road-Bridge-CGI-NR-1-1068x602.jpg 1068w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/09121009\/Botley-Road-Bridge-CGI-NR-1-1920x1082.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n<\/figure>\n<ul class=\"wp-block-list\">\n<li>A bigger, better Oxford station<\/li>\n<li>More services with East West Rail<\/li>\n<li>Additional rail capacity, including future use of the Cowley Branch Line<\/li>\n<li>An improved and safer road layout for all users<\/li>\n<\/ul>\n<p>These upgrades will support long term growth in the region, improve reliability for passengers and create a more resilient transport network.<\/p>\n<p><strong>Giles Clark, Principal Programme Sponsor at Network Rail, said:<\/strong><\/p>\n<p><em>\u201cCompleting this phase of work on schedule is a significant milestone for the Oxfordshire Connect programme, and I\u2019m grateful to everyone who played a part in making it happen.<\/em><\/p>\n<p><em>&#8220;These improvements are essential to keeping passengers moving safely and reliably, and they lay the groundwork for the major upgrades still to come.<\/em><\/p>\n<p><em>&#8220;I\u2019d like to thank local residents, businesses and passengers for their patience while we carried out this complex work, and I\u2019m pleased that the walkway diversion and railway lines are now fully open again.<\/em><\/p>\n<p><em>&#8220;We remain firmly on track for our next major milestone, reopening Botley Road in August 2026.\u201d<\/em><\/p>\n<p>Further information can be found at\u00a0<a href=\"http:\/\/www.networkrail.co.uk\/OxfordshireConnect\"  rel=\"noreferrer noopener\">www.networkrail.co.uk\/OxfordshireConnect<\/a>. \u00a0\u00a0<\/p>\n<p>Image credit: Network Rail<\/p>\n","protected":false},"excerpt":{"rendered":"<p><a href=\"https:\/\/railuk.com\/infrastructure\/structures\/trains-through-oxford-running-as-normal-following-successful-bridge-replacement\/\" title=\"Trains through Oxford running as normal following successful bridge replacement\" rel=\"nofollow\"><img loading=\"lazy\" decoding=\"async\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/09120933\/DJI-20260209014538-0007-W_cropped-1-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\"><\/a>Trains are running through Oxford as normal this morning after Network Rail successfully completed the latest phase of the Oxfordshire Connect programme with the replacement of the Botley Road rail bridge. The eight-day closure enabled engineers to safely demolish the old structure, install new bridge spans and carry out essential preparatory works that keep the [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[16013,343,47,16148,16031,85],"tags":[],"class_list":["post-365253","post","type-post","status-publish","format-standard","hentry","category-general-interest","category-infrastructure","category-rail-news","category-rail-projects","category-structures","category-uk"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.9 - aioseo.com -->\n\t<meta name=\"description\" content=\"Trains are running through Oxford as normal this morning after Network Rail successfully completed the latest phase of the Oxfordshire Connect programme with the replacement of the Botley Road rail bridge. The eight-day closure enabled engineers to safely demolish the old structure, install new bridge spans and carry out essential preparatory works that keep the [\u2026]\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=365253\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.9\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Trains through Oxford running as normal following successful bridge replacement - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Trains are running through Oxford as normal this morning after Network Rail successfully completed the latest phase of the Oxfordshire Connect programme with the replacement of the Botley Road rail bridge. The eight-day closure enabled engineers to safely demolish the old structure, install new bridge spans and carry out essential preparatory works that keep the [\u2026]\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=365253\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-02-09T12:58:29+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-02-09T12:58:29+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Trains through Oxford running as normal following successful bridge replacement - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Trains are running through Oxford as normal this morning after Network Rail successfully completed the latest phase of the Oxfordshire Connect programme with the replacement of the Botley Road rail bridge. The eight-day closure enabled engineers to safely demolish the old structure, install new bridge spans and carry out essential preparatory works that keep the [\u2026]\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=365253#blogposting\",\"name\":\"Trains through Oxford running as normal following successful bridge replacement - VibeWire Magazine\",\"headline\":\"Trains through Oxford running as normal following successful bridge replacement\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/cdn.railuk.co\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/09120933\\\/DJI-20260209014538-0007-W_cropped-1-485x360.jpg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=365253\\\/#articleImage\"},\"datePublished\":\"2026-02-09T22:58:29+10:00\",\"dateModified\":\"2026-02-09T22:58:29+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=365253#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=365253#webpage\"},\"articleSection\":\"General Interest, Infrastructure, Rail News, Rail Projects, Structures, UK\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=365253#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=365253#listItem\",\"name\":\"Trains through Oxford running as normal following successful bridge replacement\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=365253#listItem\",\"position\":3,\"name\":\"Trains through Oxford running as normal following successful bridge replacement\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=365253\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=365253\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=365253#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=365253#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=365253\",\"name\":\"Trains through Oxford running as normal following successful bridge replacement - VibeWire Magazine\",\"description\":\"Trains are running through Oxford as normal this morning after Network Rail successfully completed the latest phase of the Oxfordshire Connect programme with the replacement of the Botley Road rail bridge. The eight-day closure enabled engineers to safely demolish the old structure, install new bridge spans and carry out essential preparatory works that keep the [\\u2026]\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=365253#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"datePublished\":\"2026-02-09T22:58:29+10:00\",\"dateModified\":\"2026-02-09T22:58:29+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Trains through Oxford running as normal following successful bridge replacement - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Trains through Oxford running as normal following successful bridge replacement - VibeWire Magazine","description":"Trains are running through Oxford as normal this morning after Network Rail successfully completed the latest phase of the Oxfordshire Connect programme with the replacement of the Botley Road rail bridge. The eight-day closure enabled engineers to safely demolish the old structure, install new bridge spans and carry out essential preparatory works that keep the [\u2026]","canonical_url":"https:\/\/www.vibewire.com.au\/?p=365253","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=365253#blogposting","name":"Trains through Oxford running as normal following successful bridge replacement - VibeWire Magazine","headline":"Trains through Oxford running as normal following successful bridge replacement","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/02\/09120933\/DJI-20260209014538-0007-W_cropped-1-485x360.jpg","@id":"https:\/\/www.vibewire.com.au\/?p=365253\/#articleImage"},"datePublished":"2026-02-09T22:58:29+10:00","dateModified":"2026-02-09T22:58:29+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=365253#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=365253#webpage"},"articleSection":"General Interest, Infrastructure, Rail News, Rail Projects, Structures, UK"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=365253#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=365253#listItem","name":"Trains through Oxford running as normal following successful bridge replacement"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=365253#listItem","position":3,"name":"Trains through Oxford running as normal following successful bridge replacement","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=365253\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=365253\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=365253#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=365253#webpage","url":"https:\/\/www.vibewire.com.au\/?p=365253","name":"Trains through Oxford running as normal following successful bridge replacement - VibeWire Magazine","description":"Trains are running through Oxford as normal this morning after Network Rail successfully completed the latest phase of the Oxfordshire Connect programme with the replacement of the Botley Road rail bridge. The eight-day closure enabled engineers to safely demolish the old structure, install new bridge spans and carry out essential preparatory works that keep the [\u2026]","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=365253#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"datePublished":"2026-02-09T22:58:29+10:00","dateModified":"2026-02-09T22:58:29+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Trains through Oxford running as normal following successful bridge replacement - VibeWire Magazine","og:description":"Trains are running through Oxford as normal this morning after Network Rail successfully completed the latest phase of the Oxfordshire Connect programme with the replacement of the Botley Road rail bridge. The eight-day closure enabled engineers to safely demolish the old structure, install new bridge spans and carry out essential preparatory works that keep the [\u2026]","og:url":"https:\/\/www.vibewire.com.au\/?p=365253","article:published_time":"2026-02-09T12:58:29+00:00","article:modified_time":"2026-02-09T12:58:29+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Trains through Oxford running as normal following successful bridge replacement - VibeWire Magazine","twitter:description":"Trains are running through Oxford as normal this morning after Network Rail successfully completed the latest phase of the Oxfordshire Connect programme with the replacement of the Botley Road rail bridge. The eight-day closure enabled engineers to safely demolish the old structure, install new bridge spans and carry out essential preparatory works that keep the [\u2026]","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"365253","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-02-09 13:12:19","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2026-02-09 13:04:50","updated":"2026-02-09 13:12:19"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tTrains through Oxford running as normal following successful bridge replacement\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"Trains through Oxford running as normal following successful bridge replacement","link":"https:\/\/www.vibewire.com.au\/?p=365253"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/365253","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=365253"}],"version-history":[{"count":3,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/365253\/revisions"}],"predecessor-version":[{"id":365349,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/365253\/revisions\/365349"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=365253"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=365253"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=365253"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}