{"id":353623,"date":"2026-01-22T20:19:47","date_gmt":"2026-01-22T10:19:47","guid":{"rendered":"https:\/\/railuk.com\/?p=188169"},"modified":"2026-01-22T20:19:47","modified_gmt":"2026-01-22T10:19:47","slug":"hbc-to-deliver-net-zero-maintenance-delivery-unit-for-network-rail-in-sheffield","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=353623","title":{"rendered":"HBC to deliver net-zero Maintenance Delivery Unit for Network Rail in Sheffield"},"content":{"rendered":"<p><a href=\"https:\/\/railuk.com\/rail-news\/hbc-to-deliver-net-zero-maintenance-delivery-unit-for-network-rail-in-sheffield\/\" title=\"HBC to deliver net-zero Maintenance Delivery Unit for Network Rail in Sheffield\" rel=\"nofollow\"><img loading=\"lazy\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/01\/22101536\/Maintenance-Delivery-Unit-HBC-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\" style=\"display: block; margin-bottom: 5px; clear:both;max-width: 100%;\" link_thumbnail=\"1\" decoding=\"async\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/01\/22101536\/Maintenance-Delivery-Unit-HBC-485x360.jpg 485w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/01\/22101536\/Maintenance-Delivery-Unit-HBC-80x60.jpg 80w\" sizes=\"auto, (max-width: 485px) 100vw, 485px\" \/><\/a><\/p>\n<p>HBC Construction Limited (HBC), formerly known as Henry Boot Construction, has been appointed by Network Rail to deliver a new, fully sustainable Maintenance Delivery Unit (MDU) in Sheffield \u2013 it\u2019s second MDU project for the railway infrastructure organisation.<\/p>\n<p>The \u00a37.2 million design and build contract was procured through a two-stage tender, replicating and evolving the successful approach used on the ongoing Barnetby MDU project in North Lincolnshire.<\/p>\n<p>The new 15,000 sq ft facility at Network Rail\u2019s Blast Lane Depot will host a modern timber-frame main building. Designed to meet Network Rail\u2019s \u2018Greener Railway\u2019 strategy, the building will achieve net zero in operation and achieve a minimum 10% Biodiversity Net Gain.<\/p>\n<div class=\"wp-block-image\">\n<figure class=\"alignright size-large is-resized\"><a href=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/01\/22101635\/Lee-Powell-4.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/01\/22101635\/Lee-Powell-4-1024x683.jpg\" alt=\"\" class=\"wp-image-188174\" style=\"aspect-ratio:1.4993302176048582;width:430px;height:auto\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/01\/22101635\/Lee-Powell-4-1024x683.jpg 1024w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/01\/22101635\/Lee-Powell-4-300x200.jpg 300w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/01\/22101635\/Lee-Powell-4-768x512.jpg 768w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/01\/22101635\/Lee-Powell-4-1536x1024.jpg 1536w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/01\/22101635\/Lee-Powell-4-630x420.jpg 630w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/01\/22101635\/Lee-Powell-4-696x464.jpg 696w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/01\/22101635\/Lee-Powell-4-1068x712.jpg 1068w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/01\/22101635\/Lee-Powell-4-1920x1280.jpg 1920w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/01\/22101635\/Lee-Powell-4.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Lee Powell<\/figcaption><\/figure>\n<\/div>\n<p>Partially funded through Network Rail\u2019s Green Bank, the project will include a range of sustainability measures, including heat recovery ventilation, smart lighting and controls, an enlarged rooftop solar PV array, improved building fabric, and efficient water management systems.<\/p>\n<p>HBC\u2019s project team has worked closely with Network Rail to optimise the building layout and reduce the footprint by more than 25% \u2013 cutting materials, costs, and operational energy use while improving functionality.<\/p>\n<p>Standardising the structural grid and simplifying the building form allows for off-site construction and reduces waste, while internally, spaces have been reconfigured to enhance efficiency and support future flexibility.<\/p>\n<p>Externally, the project aims to achieve at least a 10% Biodiversity Net Gain through soft landscaping improvements, including pollinator-friendly planting. These enhancements are designed to create a welcoming and healthy environment for staff and visitors while further supporting the site\u2019s environmental resilience.<\/p>\n<p>During its first 20 years alone, the Sheffield MDU is projected to save around 850 tonnes of CO\u2082e, equivalent to 42.5 tonnes per year, compared with a traditional design.<\/p>\n<p>Lee Powell, managing director at HBC, said: \u201cWe\u2019re proud to be partnering with Network Rail once again on another forward-thinking MDU scheme, building on the strong progress of our Barnetby project.<\/p>\n<p>\u201cRepeat business of this nature reflects the trust and collaboration we\u2019ve built with Network Rail and showcases how our pre-construction function delivers real benefits for our clients. This new facility will set another benchmark for sustainable design and timber-frame delivery across Yorkshire and the wider region.\u201d<\/p>\n<p>Chris Round, senior portfolio manager at Network Rail Eastern Routes Capital Programmes, commented:<\/p>\n<p>\u201cWe are delighted to have appointed HBC to deliver this vital project within our MDU portfolio. The new MDU will provide much-needed, high-quality accommodation for our frontline staff, with the sustainability initiatives proposed as part of the scheme delivering long-term benefits for the North and East Route.\u201d<\/p>\n<p>Works on site will begin next month, with completion scheduled for 2027.<\/p>\n<p>Image credit: HBC<\/p>\n","protected":false},"excerpt":{"rendered":"<p><a href=\"https:\/\/railuk.com\/rail-news\/hbc-to-deliver-net-zero-maintenance-delivery-unit-for-network-rail-in-sheffield\/\" title=\"HBC to deliver net-zero Maintenance Delivery Unit for Network Rail in Sheffield\" rel=\"nofollow\"><img loading=\"lazy\" decoding=\"async\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/01\/22101536\/Maintenance-Delivery-Unit-HBC-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\"><\/a>HBC Construction Limited (HBC), formerly known as Henry Boot Construction, has been appointed by Network Rail to deliver a new, fully sustainable Maintenance Delivery Unit (MDU) in Sheffield \u2013 it\u2019s second MDU project for the railway infrastructure organisation. The \u00a37.2 million design and build contract was procured through a two-stage tender, replicating and evolving the [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[8202,16204,2305,47,85],"tags":[],"class_list":["post-353623","post","type-post","status-publish","format-standard","hentry","category-company-news","category-contract-news","category-environment","category-rail-news","category-uk"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.10 - aioseo.com -->\n\t<meta name=\"description\" content=\"HBC Construction Limited (HBC), formerly known as Henry Boot Construction, has been appointed by Network Rail to deliver a new, fully sustainable Maintenance Delivery Unit (MDU) in Sheffield \u2013 it\u2019s second MDU project for the railway infrastructure organisation. The \u00a37.2 million design and build contract was procured through a two-stage tender, replicating and evolving the [\u2026]\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=353623\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.10\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"HBC to deliver net-zero Maintenance Delivery Unit for Network Rail in Sheffield - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"HBC Construction Limited (HBC), formerly known as Henry Boot Construction, has been appointed by Network Rail to deliver a new, fully sustainable Maintenance Delivery Unit (MDU) in Sheffield \u2013 it\u2019s second MDU project for the railway infrastructure organisation. The \u00a37.2 million design and build contract was procured through a two-stage tender, replicating and evolving the [\u2026]\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=353623\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-01-22T10:19:47+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-01-22T10:19:47+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"HBC to deliver net-zero Maintenance Delivery Unit for Network Rail in Sheffield - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"HBC Construction Limited (HBC), formerly known as Henry Boot Construction, has been appointed by Network Rail to deliver a new, fully sustainable Maintenance Delivery Unit (MDU) in Sheffield \u2013 it\u2019s second MDU project for the railway infrastructure organisation. The \u00a37.2 million design and build contract was procured through a two-stage tender, replicating and evolving the [\u2026]\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=353623#blogposting\",\"name\":\"HBC to deliver net-zero Maintenance Delivery Unit for Network Rail in Sheffield - VibeWire Magazine\",\"headline\":\"HBC to deliver net-zero Maintenance Delivery Unit for Network Rail in Sheffield\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/cdn.railuk.co\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/22101536\\\/Maintenance-Delivery-Unit-HBC-485x360.jpg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=353623\\\/#articleImage\"},\"datePublished\":\"2026-01-22T20:19:47+10:00\",\"dateModified\":\"2026-01-22T20:19:47+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=353623#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=353623#webpage\"},\"articleSection\":\"Company news, Contract News, Environment, Rail News, UK\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=353623#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=353623#listItem\",\"name\":\"HBC to deliver net-zero Maintenance Delivery Unit for Network Rail in Sheffield\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=353623#listItem\",\"position\":3,\"name\":\"HBC to deliver net-zero Maintenance Delivery Unit for Network Rail in Sheffield\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=353623\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=353623\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=353623#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=353623#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=353623\",\"name\":\"HBC to deliver net-zero Maintenance Delivery Unit for Network Rail in Sheffield - VibeWire Magazine\",\"description\":\"HBC Construction Limited (HBC), formerly known as Henry Boot Construction, has been appointed by Network Rail to deliver a new, fully sustainable Maintenance Delivery Unit (MDU) in Sheffield \\u2013 it\\u2019s second MDU project for the railway infrastructure organisation. The \\u00a37.2 million design and build contract was procured through a two-stage tender, replicating and evolving the [\\u2026]\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=353623#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"datePublished\":\"2026-01-22T20:19:47+10:00\",\"dateModified\":\"2026-01-22T20:19:47+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>HBC to deliver net-zero Maintenance Delivery Unit for Network Rail in Sheffield - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"HBC to deliver net-zero Maintenance Delivery Unit for Network Rail in Sheffield - VibeWire Magazine","description":"HBC Construction Limited (HBC), formerly known as Henry Boot Construction, has been appointed by Network Rail to deliver a new, fully sustainable Maintenance Delivery Unit (MDU) in Sheffield \u2013 it\u2019s second MDU project for the railway infrastructure organisation. The \u00a37.2 million design and build contract was procured through a two-stage tender, replicating and evolving the [\u2026]","canonical_url":"https:\/\/www.vibewire.com.au\/?p=353623","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=353623#blogposting","name":"HBC to deliver net-zero Maintenance Delivery Unit for Network Rail in Sheffield - VibeWire Magazine","headline":"HBC to deliver net-zero Maintenance Delivery Unit for Network Rail in Sheffield","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2026\/01\/22101536\/Maintenance-Delivery-Unit-HBC-485x360.jpg","@id":"https:\/\/www.vibewire.com.au\/?p=353623\/#articleImage"},"datePublished":"2026-01-22T20:19:47+10:00","dateModified":"2026-01-22T20:19:47+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=353623#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=353623#webpage"},"articleSection":"Company news, Contract News, Environment, Rail News, UK"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=353623#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=353623#listItem","name":"HBC to deliver net-zero Maintenance Delivery Unit for Network Rail in Sheffield"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=353623#listItem","position":3,"name":"HBC to deliver net-zero Maintenance Delivery Unit for Network Rail in Sheffield","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=353623\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=353623\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=353623#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=353623#webpage","url":"https:\/\/www.vibewire.com.au\/?p=353623","name":"HBC to deliver net-zero Maintenance Delivery Unit for Network Rail in Sheffield - VibeWire Magazine","description":"HBC Construction Limited (HBC), formerly known as Henry Boot Construction, has been appointed by Network Rail to deliver a new, fully sustainable Maintenance Delivery Unit (MDU) in Sheffield \u2013 it\u2019s second MDU project for the railway infrastructure organisation. The \u00a37.2 million design and build contract was procured through a two-stage tender, replicating and evolving the [\u2026]","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=353623#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"datePublished":"2026-01-22T20:19:47+10:00","dateModified":"2026-01-22T20:19:47+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"HBC to deliver net-zero Maintenance Delivery Unit for Network Rail in Sheffield - VibeWire Magazine","og:description":"HBC Construction Limited (HBC), formerly known as Henry Boot Construction, has been appointed by Network Rail to deliver a new, fully sustainable Maintenance Delivery Unit (MDU) in Sheffield \u2013 it\u2019s second MDU project for the railway infrastructure organisation. The \u00a37.2 million design and build contract was procured through a two-stage tender, replicating and evolving the [\u2026]","og:url":"https:\/\/www.vibewire.com.au\/?p=353623","article:published_time":"2026-01-22T10:19:47+00:00","article:modified_time":"2026-01-22T10:19:47+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"HBC to deliver net-zero Maintenance Delivery Unit for Network Rail in Sheffield - VibeWire Magazine","twitter:description":"HBC Construction Limited (HBC), formerly known as Henry Boot Construction, has been appointed by Network Rail to deliver a new, fully sustainable Maintenance Delivery Unit (MDU) in Sheffield \u2013 it\u2019s second MDU project for the railway infrastructure organisation. The \u00a37.2 million design and build contract was procured through a two-stage tender, replicating and evolving the [\u2026]","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"353623","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-01-22 10:49:49","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2026-01-22 10:49:26","updated":"2026-01-22 10:49:49"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tHBC to deliver net-zero Maintenance Delivery Unit for Network Rail in Sheffield\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"HBC to deliver net-zero Maintenance Delivery Unit for Network Rail in Sheffield","link":"https:\/\/www.vibewire.com.au\/?p=353623"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/353623","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=353623"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/353623\/revisions"}],"predecessor-version":[{"id":353682,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/353623\/revisions\/353682"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=353623"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=353623"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=353623"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}