{"id":35327,"date":"2024-05-06T11:19:48","date_gmt":"2024-05-06T01:19:48","guid":{"rendered":"https:\/\/www.railexpress.com.au\/?p=116145"},"modified":"2024-05-06T11:19:48","modified_gmt":"2024-05-06T01:19:48","slug":"inland-rail-work-steams-ahead","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=35327","title":{"rendered":"Inland Rail work steams ahead"},"content":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/05\/Wangaratta-Station-front-gate-1920x0-c-default.jpeg\" alt=\"\" style=\"float:right; margin:0 0 10px 10px;\"><figcaption>Image\/Inland Rail<\/figcaption><\/figure>\n<p><strong><a href=\"https:\/\/www.railexpress.com.au\/inland-rail-on-track-for-strong-progress-in-2024\/\">Inland Rail<\/a> works will steam ahead in May with a large scope of works in the Wangaratta railway station precinct and at Glenrowan.<\/strong><span id=\"more-116145\"><\/span><\/p>\n<div class=\"flex flex-wrap justify-between align-center\">\n<p>The upcoming construction work in Wangaratta will temporarily change the access to the railway station and progress the Green Street demolition and re-build.<\/p>\n<p>An 18-hour track possession on\u00a0<a href=\"https:\/\/inlandrail.com.au\/wangaratta-railway-station-and-green-st-bridge-works-extended-hours-may-2024\/\">Monday, 6 May<\/a>, will close the Albury line for essential work to demolish the Green Street west abutment and cut and remove the top of the east abutment.<\/p>\n<p>Station precinct works will include the installation of new drainage, preparatory work for the new pedestrian underpass pump station and continued backfilling and construction of the new western platform.<\/p>\n<p>New drainage will also be installed at Glenrowan.<\/p>\n<p>Ed Walker, Inland Rail Program Delivery Director Beveridge to Albury said work is progressing quickly in Wangaratta.<\/p>\n<p>\u201cOur contractor, McConnell Dowell, will be demolishing the remaining sections of the Green Street bridge, moving ahead with the construction of the second west platform and starting work at the entrance to the station,&#8221; he said.<\/p>\n<p>\u201cWe will not be scheduling work for 24 hours-a-day like we did earlier in the year, but there will be some disruption to travellers and motorists.<\/p>\n<p>\u201cWe thank the community for their understanding and apologise for the inconvenience.\u201d<\/p>\n<p>For details of the changes to the passenger train services visit\u00a0<a href=\"https:\/\/www.vline.com.au\/\"  rel=\"noopener\">vline.com.au<\/a><\/p>\n<p>From 10 to 24 May, trains will remain in service but travellers will experience changes to the access, parking and bus movements at Wangaratta station.<\/p>\n<p>The southern entrance off Norton Street will be closed and vehicles will be directed to enter and exit from the northern end only with traffic management in place.<\/p>\n<p>The pedestrian walkway to the station will be removed and a new adjacent temporary pedestrian pathway will be installed, and some Norton Street parking bays in front of the station will be closed to be used for a temporary bus stop.<\/p>\n<p>Additional V\/Line staff, traffic management and extra signage will be deployed to help travellers and motorists navigate the changes around the station precinct.<\/p>\n<\/div>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/inland-rail-work-steams-ahead\/\">Inland Rail work steams ahead<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Inland Rail works will steam ahead in May with a large scope of works in the Wangaratta railway station precinct \u2026 <\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/inland-rail-work-steams-ahead\/\">Inland Rail work steams ahead<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[165,326,2251,163,58,164],"tags":[8],"class_list":["post-35327","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-infrastructure","category-inland-rail","category-nsw","category-rail-industry-news-australia-new-zealand","category-track-construction","category-train-stations","tag-victoria"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Inland Rail works will steam ahead in May with a large scope of works in the Wangaratta railway station precinct \u2026 The post Inland Rail work steams ahead appeared first on Rail Express.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=35327\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Inland Rail work steams ahead - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Inland Rail works will steam ahead in May with a large scope of works in the Wangaratta railway station precinct \u2026 The post Inland Rail work steams ahead appeared first on Rail Express.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=35327\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-05-06T01:19:48+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-05-06T01:19:48+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Inland Rail work steams ahead - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Inland Rail works will steam ahead in May with a large scope of works in the Wangaratta railway station precinct \u2026 The post Inland Rail work steams ahead appeared first on Rail Express.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=35327#blogposting\",\"name\":\"Inland Rail work steams ahead - VibeWire Magazine\",\"headline\":\"Inland Rail work steams ahead\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1},\"datePublished\":\"2024-05-06T11:19:48+10:00\",\"dateModified\":\"2024-05-06T11:19:48+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=35327#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=35327#webpage\"},\"articleSection\":\"Industry Infrastructure, Inland Rail, NSW, Rail industry news (Australia, New Zealand), Track Construction, Train Stations, victoria\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=35327#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=58#listItem\",\"name\":\"Track Construction\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=58#listItem\",\"position\":2,\"name\":\"Track Construction\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=58\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=35327#listItem\",\"name\":\"Inland Rail work steams ahead\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=35327#listItem\",\"position\":3,\"name\":\"Inland Rail work steams ahead\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=58#listItem\",\"name\":\"Track Construction\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=35327\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=35327\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=35327#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=35327#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=35327\",\"name\":\"Inland Rail work steams ahead - VibeWire Magazine\",\"description\":\"Inland Rail works will steam ahead in May with a large scope of works in the Wangaratta railway station precinct \\u2026 The post Inland Rail work steams ahead appeared first on Rail Express.\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=35327#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1,\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=35327\\\/#mainImage\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=35327#mainImage\"},\"datePublished\":\"2024-05-06T11:19:48+10:00\",\"dateModified\":\"2024-05-06T11:19:48+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Inland Rail work steams ahead - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Inland Rail work steams ahead - VibeWire Magazine","description":"Inland Rail works will steam ahead in May with a large scope of works in the Wangaratta railway station precinct \u2026 The post Inland Rail work steams ahead appeared first on Rail Express.","canonical_url":"https:\/\/www.vibewire.com.au\/?p=35327","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=35327#blogposting","name":"Inland Rail work steams ahead - VibeWire Magazine","headline":"Inland Rail work steams ahead","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":1},"datePublished":"2024-05-06T11:19:48+10:00","dateModified":"2024-05-06T11:19:48+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=35327#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=35327#webpage"},"articleSection":"Industry Infrastructure, Inland Rail, NSW, Rail industry news (Australia, New Zealand), Track Construction, Train Stations, victoria"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=35327#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=58#listItem","name":"Track Construction"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=58#listItem","position":2,"name":"Track Construction","item":"https:\/\/www.vibewire.com.au\/?cat=58","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=35327#listItem","name":"Inland Rail work steams ahead"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=35327#listItem","position":3,"name":"Inland Rail work steams ahead","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=58#listItem","name":"Track Construction"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=35327\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=35327\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=35327#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=35327#webpage","url":"https:\/\/www.vibewire.com.au\/?p=35327","name":"Inland Rail work steams ahead - VibeWire Magazine","description":"Inland Rail works will steam ahead in May with a large scope of works in the Wangaratta railway station precinct \u2026 The post Inland Rail work steams ahead appeared first on Rail Express.","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=35327#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"image":{"@type":"ImageObject","url":1,"@id":"https:\/\/www.vibewire.com.au\/?p=35327\/#mainImage"},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=35327#mainImage"},"datePublished":"2024-05-06T11:19:48+10:00","dateModified":"2024-05-06T11:19:48+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Inland Rail work steams ahead - VibeWire Magazine","og:description":"Inland Rail works will steam ahead in May with a large scope of works in the Wangaratta railway station precinct \u2026 The post Inland Rail work steams ahead appeared first on Rail Express.","og:url":"https:\/\/www.vibewire.com.au\/?p=35327","article:published_time":"2024-05-06T01:19:48+00:00","article:modified_time":"2024-05-06T01:19:48+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Inland Rail work steams ahead - VibeWire Magazine","twitter:description":"Inland Rail works will steam ahead in May with a large scope of works in the Wangaratta railway station precinct \u2026 The post Inland Rail work steams ahead appeared first on Rail Express.","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"35327","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-06-14 15:48:56","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-05-06 01:45:40","updated":"2026-06-14 15:48:56"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=58\" title=\"Track Construction\">Track Construction<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tInland Rail work steams ahead\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Track Construction","link":"https:\/\/www.vibewire.com.au\/?cat=58"},{"label":"Inland Rail work steams ahead","link":"https:\/\/www.vibewire.com.au\/?p=35327"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/35327","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=35327"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/35327\/revisions"}],"predecessor-version":[{"id":36314,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/35327\/revisions\/36314"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=35327"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=35327"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=35327"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}