{"id":332673,"date":"2025-12-19T03:01:07","date_gmt":"2025-12-18T17:01:07","guid":{"rendered":"https:\/\/www.nasa.gov\/?p=938776"},"modified":"2025-12-19T03:01:07","modified_gmt":"2025-12-18T17:01:07","slug":"a-look-back-at-nasa-stennis-in-2025","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=332673","title":{"rendered":"A Look Back at NASA Stennis in 2025"},"content":{"rendered":"<div id=\"\" class=\"padding-top-5 padding-bottom-3 width-full maxw-full hds-module hds-module-full alignfull wp-block-nasa-blocks-article-intro\">\n<div class=\"width-full maxw-full article-header\">\n<div class=\"margin-bottom-2 width-full maxw-full\">\n<p class=\"label carbon-60 margin-0 margin-bottom-3 padding-0\">5 min read<\/p>\n<h1 class=\"display-48 margin-bottom-2\">Preparations for Next Moonwalk Simulations Underway (and Underwater)<\/h1>\n<\/div>\n<\/div>\n<\/div>\n<p>In 2025, NASA\u2019s Stennis Space Center near Bay St. Louis, Mississippi, marked a year of progress by supporting NASA\u2019s Artemis campaign, celebrating historic milestones, and continuing its role as a trusted propulsion test partner at America\u2019s largest rocket propulsion test site.<\/p>\n<p>\u201cFor more than six decades, NASA Stennis has proudly represented the Gulf Coast region and America in advancing our nation\u2019s space exploration goals,\u201d said NASA Stennis Director John Bailey. \u201cThis year, we continued our progress forward as we near the launch of Artemis II, while honoring milestones that have brought our center to this point.\u201d<\/p>\n<h2 class=\"wp-block-heading\"><strong>Supporting Artemis<\/strong><\/h2>\n<p>As NASA prepares for the launch of <a href=\"https:\/\/www.nasa.gov\/mission\/artemis-ii\/\">Artemis II<\/a> in early 2026, with the first crewed mission to the Moon in over 50 years, NASA Stennis continues its frontline work.<\/p>\n<p>Every RS-25 engine used to help launch NASA\u2019s SLS (Space Launch System) rocket to the Moon is tested in south Mississippi.<\/p>\n<p>NASA Stennis teams provided data to lead engines contractor L3Harris Technologies by successfully testing two new production RS-25 flight engines.<\/p>\n<p>NASA tested RS-25 engine No. 20001 at the Fred Haise Test Stand in June, and RS-25 engine No. 20002 in November. Each engine fired for 500 seconds, reaching 111% of its rated power, while simulating launch conditions.<\/p>\n<div id=\"\" class=\"hds-image-carousel grid-container grid-container-block padding-top-4 padding-bottom-4 hds-module hds-module-full alignfull wp-block-nasa-blocks-image-carousel\">\n<div id=\"carousel-wrapper-carousel-694448af9ee5d\" class=\"hds-carousel-wrapper\">\n<div class=\"image-carousel-slider margin-0\" id=\"image-carousel-slider-carousel-694448af9ee5d\"\n\t\t\t\tdata-client-id=\"carousel-694448af9ee5d\"\n\t\t\t\tdata-variation=\"carousel\"\n\t\t\t\tdata-autoplay=\"\" \n\t\t\t\tdata-autoplay-speed=\"2000\" \n\t\t\t\tdata-play-pause=\"\" \n\t\t\t\tdata-transition-type=\"slide\"\n\t\t\t\tdata-progress=\"\"\n\t\t\t\tdata-progress-labels=\"\"\n\t\t\t\tdata-start-label=\"Start\"\n\t\t\t\tdata-end-label=\"End\"\n\t\t\t\tdata-labels-initialized=\"true\"><\/p>\n<div class=\"display-block width-full\" data-label=\"\">\n<figure class=\"margin-0\">\n<div class=\"hds-cover-wrapper hds-image-carousel-slide margin-bottom-2\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-cover \"><img decoding=\"async\" width=\"1024\" height=\"681\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3356.jpg?w=1024\" class=\"attachment-large size-large\" alt=\"crew installing the first new production RS-25 engine on the Fred Haise Test Stand\" style=\"transform: scale(1); transform-origin: 50% 50%; object-position: 50% 50%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3356.jpg 3610w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3356.jpg?resize=300,199 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3356.jpg?resize=768,511 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3356.jpg?resize=1024,681 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3356.jpg?resize=1536,1021 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3356.jpg?resize=2048,1362 2048w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3356.jpg?resize=400,266 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3356.jpg?resize=600,399 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3356.jpg?resize=900,598 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3356.jpg?resize=1200,798 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3356.jpg?resize=2000,1330 2000w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">Teams at NASA\u2019s Stennis Space Center deliver, lift, and install the first new production RS-25 engine on the Fred Haise Test Stand on Feb. 18, 2025.<\/div>\n<div class=\"hds-credits\">NASA\/Danny Nowlin<\/div>\n<\/figcaption><\/div>\n<\/p><\/div>\n<\/figure><\/div>\n<div class=\"display-block width-full\" data-label=\"\">\n<figure class=\"margin-0\">\n<div class=\"hds-cover-wrapper hds-image-carousel-slide margin-bottom-2\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-cover \"><img decoding=\"async\" width=\"683\" height=\"1024\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3412.jpg?w=683\" class=\"attachment-large size-large\" alt=\"crew installing the first new production RS-25 engine on the Fred Haise Test Stand\" style=\"transform: scale(1); transform-origin: 57% 76%; object-position: 57% 76%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3412.jpg 1600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3412.jpg?resize=200,300 200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3412.jpg?resize=768,1152 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3412.jpg?resize=683,1024 683w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3412.jpg?resize=1024,1536 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3412.jpg?resize=1365,2048 1365w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3412.jpg?resize=267,400 267w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3412.jpg?resize=400,600 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3412.jpg?resize=600,900 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3412.jpg?resize=800,1200 800w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3412.jpg?resize=1333,2000 1333w\" sizes=\"auto, (max-width: 683px) 100vw, 683px\" \/><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">Teams at NASA\u2019s Stennis Space Center deliver, lift, and install the first new production RS-25 engine on the Fred Haise Test Stand on Feb. 18, 2025.<\/div>\n<div class=\"hds-credits\">NASA\/Danny Nowlin<\/div>\n<\/figcaption><\/div>\n<\/p><\/div>\n<\/figure><\/div>\n<div class=\"display-block width-full\" data-label=\"\">\n<figure class=\"margin-0\">\n<div class=\"hds-cover-wrapper hds-image-carousel-slide margin-bottom-2\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-cover \"><img decoding=\"async\" width=\"681\" height=\"1024\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3423.jpg?w=681\" class=\"attachment-large size-large\" alt=\"crew installing the first new production RS-25 engine on the Fred Haise Test Stand\" style=\"transform: scale(1); transform-origin: 54% 84%; object-position: 54% 84%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3423.jpg 1596w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3423.jpg?resize=200,300 200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3423.jpg?resize=768,1155 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3423.jpg?resize=681,1024 681w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3423.jpg?resize=1021,1536 1021w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3423.jpg?resize=1362,2048 1362w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3423.jpg?resize=266,400 266w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3423.jpg?resize=399,600 399w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3423.jpg?resize=599,900 599w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3423.jpg?resize=798,1200 798w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3423.jpg?resize=1330,2000 1330w\" sizes=\"auto, (max-width: 681px) 100vw, 681px\" \/><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">Teams at NASA\u2019s Stennis Space Center deliver, lift, and install the first new production RS-25 engine on the Fred Haise Test Stand on Feb. 18, 2025.<\/div>\n<div class=\"hds-credits\">NASA\/Danny Nowlin<\/div>\n<\/figcaption><\/div>\n<\/p><\/div>\n<\/figure><\/div>\n<div class=\"display-block width-full\" data-label=\"\">\n<figure class=\"margin-0\">\n<div class=\"hds-cover-wrapper hds-image-carousel-slide margin-bottom-2\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-cover \"><img decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3481.jpg?w=1024\" class=\"attachment-large size-large\" alt=\"crew installing the first new production RS-25 engine on the Fred Haise Test Stand\" style=\"transform: scale(1); transform-origin: 50% 50%; object-position: 50% 50%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3481.jpg 3600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3481.jpg?resize=300,200 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3481.jpg?resize=768,512 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3481.jpg?resize=1024,683 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3481.jpg?resize=1536,1024 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3481.jpg?resize=2048,1365 2048w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3481.jpg?resize=400,267 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3481.jpg?resize=600,400 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3481.jpg?resize=900,600 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3481.jpg?resize=1200,800 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3481.jpg?resize=2000,1333 2000w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">Teams at NASA\u2019s Stennis Space Center deliver, lift, and install the first new production RS-25 engine on the Fred Haise Test Stand on Feb. 18, 2025.<\/div>\n<div class=\"hds-credits\">NASA\/Danny Nowlin<\/div>\n<\/figcaption><\/div>\n<\/p><\/div>\n<\/figure><\/div>\n<div class=\"display-block width-full\" data-label=\"\">\n<figure class=\"margin-0\">\n<div class=\"hds-cover-wrapper hds-image-carousel-slide margin-bottom-2\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-cover \"><img decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3545.jpg?w=1024\" class=\"attachment-large size-large\" alt=\"crew installing the first new production RS-25 engine on the Fred Haise Test Stand\" style=\"transform: scale(1); transform-origin: 50% 50%; object-position: 50% 50%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3545.jpg 3600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3545.jpg?resize=300,200 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3545.jpg?resize=768,512 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3545.jpg?resize=1024,683 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3545.jpg?resize=1536,1024 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3545.jpg?resize=2048,1365 2048w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3545.jpg?resize=400,267 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3545.jpg?resize=600,400 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3545.jpg?resize=900,600 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3545.jpg?resize=1200,800 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3545.jpg?resize=2000,1333 2000w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">Teams at NASA\u2019s Stennis Space Center deliver, lift, and install the first new production RS-25 engine on the Fred Haise Test Stand on Feb. 18,  2025.<\/div>\n<div class=\"hds-credits\">NASA\/Danny Nowlin<\/div>\n<\/figcaption><\/div>\n<\/p><\/div>\n<\/figure><\/div>\n<div class=\"display-block width-full\" data-label=\"\">\n<figure class=\"margin-0\">\n<div class=\"hds-cover-wrapper hds-image-carousel-slide margin-bottom-2\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-cover \"><img decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3555.jpg?w=1024\" class=\"attachment-large size-large\" alt=\"crew installing the first new production RS-25 engine on the Fred Haise Test Stand\" style=\"transform: scale(1); transform-origin: 53% 87%; object-position: 53% 87%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3555.jpg 3600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3555.jpg?resize=300,200 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3555.jpg?resize=768,512 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3555.jpg?resize=1024,683 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3555.jpg?resize=1536,1024 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3555.jpg?resize=2048,1365 2048w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3555.jpg?resize=400,267 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3555.jpg?resize=600,400 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3555.jpg?resize=900,600 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3555.jpg?resize=1200,800 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/02\/s25-003-rs-25-install-3555.jpg?resize=2000,1333 2000w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">Teams at NASA\u2019s Stennis Space Center deliver, lift, and install the first new production RS-25 engine on the Fred Haise Test Stand on Feb. 18, 2025.<\/div>\n<div class=\"hds-credits\">NASA\/Danny Nowlin<\/div>\n<\/figcaption><\/div>\n<\/p><\/div>\n<\/figure><\/div>\n<div class=\"display-block width-full\" data-label=\"\">\n<figure class=\"margin-0\">\n<div class=\"hds-cover-wrapper hds-image-carousel-slide margin-bottom-2\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-cover \"><img decoding=\"async\" width=\"1024\" height=\"681\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/06\/s25-020-ssc-20250620-s00290.jpg?w=1024\" class=\"attachment-large size-large\" alt=\"A row of bushes frame the photo as vapor clouds seen in the distance erupt towards the sky during an engine test on the Fred Haise Test Stand at NASA Stennis\" style=\"transform: scale(1); transform-origin: 50% 50%; object-position: 50% 50%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/06\/s25-020-ssc-20250620-s00290.jpg 7350w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/06\/s25-020-ssc-20250620-s00290.jpg?resize=300,200 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/06\/s25-020-ssc-20250620-s00290.jpg?resize=768,511 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/06\/s25-020-ssc-20250620-s00290.jpg?resize=1024,681 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/06\/s25-020-ssc-20250620-s00290.jpg?resize=1536,1022 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/06\/s25-020-ssc-20250620-s00290.jpg?resize=2048,1363 2048w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/06\/s25-020-ssc-20250620-s00290.jpg?resize=400,266 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/06\/s25-020-ssc-20250620-s00290.jpg?resize=600,399 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/06\/s25-020-ssc-20250620-s00290.jpg?resize=900,599 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/06\/s25-020-ssc-20250620-s00290.jpg?resize=1200,798 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/06\/s25-020-ssc-20250620-s00290.jpg?resize=2000,1331 2000w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">NASA tests RS-25 engine No. 20001 on June 20, 2025, at the Fred Haise Test Stand at NASA\u2019s Stennis Space Center at Bay St. Louis, Mississippi.<\/div>\n<div class=\"hds-credits\">NASA\/Danny Nowlin<\/div>\n<\/figcaption><\/div>\n<\/p><\/div>\n<\/figure><\/div>\n<\/p><\/div>\n<div class=\"hds-carousel-nav display-flex margin-left-auto margin-right-0\" data-carousel-id=\"image-carousel-slider-carousel-694448af9ee5d\">\n\t\t\t\t<button class=\"hds-carousel-nav-arrow hds-carousel-arrow-prev\"><br \/>\n\t\t\t\t\t<svg version=\"1.1\" x=\"0px\" y=\"0px\" width=\"9px\" height=\"9px\" viewBox=\"0 0 9 9\"><path class=\"st0\" d=\"M3.5,4.5l3.7-3.6L6.3,0L1.8,4.5L6.3,9l0.9-0.9L3.5,4.5z\"><\/path><\/svg><br \/>\n\t\t\t\t<\/button><br \/>\n\t\t\t\t\t\t\t<button class=\"hds-carousel-nav-arrow hds-carousel-arrow-next margin-right-0\"><br \/>\n\t\t\t\t\t<svg version=\"1.1\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" x=\"0px\" y=\"0px\" width=\"9px\" height=\"9px\" viewBox=\"0 0 9 9\"><path class=\"st0\" d=\"M5.5,4.5L1.8,8.1L2.7,9l4.5-4.5L2.7,0L1.8,0.9L5.5,4.5z\"><\/path><\/svg><br \/>\n\t\t\t\t<\/button>\n\t\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<h2 class=\"wp-block-heading\"><strong>Supporting Commercial Propulsion<\/strong><\/h2>\n<p>The commercial aerospace industry is growing, and NASA Stennis is a secure location providing support for it. Companies that have conducted work at NASA Stennis include Blue Origin, Boeing, Evolution Space; Launcher, a Vast company; Relativity Space and Rolls-Royce.<\/p>\n<p>Three companies \u2013 Relativity Space, Rocket Lab, and Evolution Space \u2013 have established, or continue progress to establish, production and\/or test operations at NASA Stennis.<\/p>\n<p>Infrastructure upgrades and planning efforts across the test complex are laying the foundation for future propulsion test projects as well.<\/p>\n<p>\u201cAs the commercial space industry continues to accelerate their development, NASA Stennis is adapting to meet their propulsion testing needs,\u201d said Joe Schuyler, director of the NASA Stennis Engineering and Test Directorate. \u201cWe are proud that our proven experience makes us a trusted partner.\u201d<\/p>\n<h2 class=\"wp-block-heading\"><strong>Honoring the Past<\/strong><\/h2>\n<div id=\"\" class=\"hds-media hds-module wp-block-image\">\n<div class=\"margin-left-auto margin-right-auto nasa-block-align-inline\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-fit \"><a href=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-19750508-s00011.jpg\"><img decoding=\"async\" width=\"1200\" height=\"1500\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-19750508-s00011.jpg?w=1200\" class=\"attachment-2048x2048 size-2048x2048\" alt=\"The first space shuttle main engine is installed on test stand\" style=\"transform: scale(1); transform-origin: 50% 50%; object-position: 50% 50%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-19750508-s00011.jpg 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-19750508-s00011.jpg?resize=240,300 240w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-19750508-s00011.jpg?resize=768,960 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-19750508-s00011.jpg?resize=819,1024 819w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-19750508-s00011.jpg?resize=320,400 320w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-19750508-s00011.jpg?resize=480,600 480w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-19750508-s00011.jpg?resize=720,900 720w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-19750508-s00011.jpg?resize=960,1200 960w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/a><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">In 2025, NASA Stennis honored a defining era of space shuttle main engine testing. An image shows the first space shuttle main engine installed on May 8, 1975, at the Fred Haise Test Stand (formerly A-1).<\/div>\n<div class=\"hds-credits\">NASA<\/div>\n<\/figcaption><\/div>\n<\/div>\n<\/div>\n<p>While NASA Stennis operates as the nation\u2019s largest rocket propulsion test site, the NASA Stennis Federal City also is home to more than 50 federal, state, academic, and commercial tenants.<\/p>\n<p>This year marked the <a href=\"https:\/\/www.nasa.gov\/feature\/a-model-center\/\">birth<\/a> of the federal city concept 55 years ago. The unique operating approach serves as a model of government efficiency and a powerful economic engine for the Gulf Coast region.<\/p>\n<p>Meanwhile, the 50<sup>th<\/sup> <a href=\"https:\/\/www.nasa.gov\/centers-and-facilities\/stennis\/a-defining-era-ssme\/\">anniversary<\/a> of space shuttle main engine testing honored a defining era for NASA Stennis.<\/p>\n<p>From May 1975 to July 2009, NASA Stennis tested space shuttle main engines that enabled 135 shuttle missions and notable space milestones, like deployment of the Hubble Space Telescope and construction of the International Space Station.<\/p>\n<p>Both the federal city model and the decades of propulsion excellence continue to inform work at NASA Stennis.<\/p>\n<h2 class=\"wp-block-heading\"><strong>Engineering the Future<\/strong><\/h2>\n<p>Innovation extended beyond the test stands. The versatile testing environment at NASA Stennis is uniquely positioned to support unmanned systems testing across air, land, and water. With restricted airspace, a closed canal system, and vast protected terrain, the site offers a safe, flexible environment for <a href=\"https:\/\/www.nasa.gov\/centers-and-facilities\/stennis\/an-ideal-setting-for-range-operations\/\">range operations<\/a>.<\/p>\n<p>In addition to physical infrastructure, NASA Stennis progressed in digital innovation with the release of its first open-source software <a href=\"https:\/\/www.nasa.gov\/centers-and-facilities\/stennis\/stennis-first-open-source-software\/\">tool<\/a> to streamline propulsion test data collection and collaboration across NASA and industry. The peer review tool is designed to facilitate more efficient and collaborative creation of systems applications, such as those used in frontline government and propulsion test work.<\/p>\n<div id=\"\" class=\"hds-media hds-module wp-block-image\">\n<div class=\"margin-left-auto margin-right-auto nasa-block-align-inline\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-cover \"><a href=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2016\/06\/dsc-0992-range-airspace-operations-drone.jpg\"><img decoding=\"async\" width=\"2048\" height=\"1362\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2016\/06\/dsc-0992-range-airspace-operations-drone.jpg?w=2048\" class=\"attachment-2048x2048 size-2048x2048\" alt=\"a drone flying low over a body of water\" style=\"transform: scale(1.2); transform-origin: 50% 50%; object-position: 50% 50%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2016\/06\/dsc-0992-range-airspace-operations-drone.jpg 5550w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2016\/06\/dsc-0992-range-airspace-operations-drone.jpg?resize=300,199 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2016\/06\/dsc-0992-range-airspace-operations-drone.jpg?resize=768,511 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2016\/06\/dsc-0992-range-airspace-operations-drone.jpg?resize=1024,681 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2016\/06\/dsc-0992-range-airspace-operations-drone.jpg?resize=1536,1021 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2016\/06\/dsc-0992-range-airspace-operations-drone.jpg?resize=2048,1362 2048w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2016\/06\/dsc-0992-range-airspace-operations-drone.jpg?resize=400,266 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2016\/06\/dsc-0992-range-airspace-operations-drone.jpg?resize=600,399 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2016\/06\/dsc-0992-range-airspace-operations-drone.jpg?resize=900,598 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2016\/06\/dsc-0992-range-airspace-operations-drone.jpg?resize=1200,798 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2016\/06\/dsc-0992-range-airspace-operations-drone.jpg?resize=2000,1330 2000w\" sizes=\"auto, (max-width: 2048px) 100vw, 2048px\" \/><\/a><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">U.S. Naval Research Laboratory personnel conduct a field experiment involving an unmanned aerial system at NASA Stennis in March 2024.<\/div>\n<div class=\"hds-credits\">NASA\/Danny Nowlin<\/div>\n<\/figcaption><\/div>\n<\/div>\n<\/div>\n<div id=\"\" class=\"hds-media hds-module wp-block-image\">\n<div class=\"margin-left-auto margin-right-auto nasa-block-align-inline\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-cover \"><a href=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/08\/s25-024-ssc-20241219-s01301.jpg\"><img decoding=\"async\" width=\"2048\" height=\"1362\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/08\/s25-024-ssc-20241219-s01301.jpg?w=2048\" class=\"attachment-2048x2048 size-2048x2048\" alt=\"unmanned aerial system\" style=\"transform: scale(1.2); transform-origin: 50% 50%; object-position: 50% 50%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/08\/s25-024-ssc-20241219-s01301.jpg 5550w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/08\/s25-024-ssc-20241219-s01301.jpg?resize=300,199 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/08\/s25-024-ssc-20241219-s01301.jpg?resize=768,511 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/08\/s25-024-ssc-20241219-s01301.jpg?resize=1024,681 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/08\/s25-024-ssc-20241219-s01301.jpg?resize=1536,1021 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/08\/s25-024-ssc-20241219-s01301.jpg?resize=2048,1362 2048w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/08\/s25-024-ssc-20241219-s01301.jpg?resize=400,266 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/08\/s25-024-ssc-20241219-s01301.jpg?resize=600,399 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/08\/s25-024-ssc-20241219-s01301.jpg?resize=900,598 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/08\/s25-024-ssc-20241219-s01301.jpg?resize=1200,798 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/08\/s25-024-ssc-20241219-s01301.jpg?resize=2000,1330 2000w\" sizes=\"auto, (max-width: 2048px) 100vw, 2048px\" \/><\/a><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">U.S. Naval Research laboratory personnel conduct tests on The Blue Boat made by Blue Robotics, an unmanned surface vessel, at NOAA\u2019s National Data Buoy Center basin at NASA Stennis on Dec. 19, 2024. <\/div>\n<div class=\"hds-credits\">NASA\/Danny Nowlin<\/div>\n<\/figcaption><\/div>\n<\/div>\n<\/div>\n<div id=\"\" class=\"hds-media hds-module wp-block-image\">\n<div class=\"margin-left-auto margin-right-auto nasa-block-align-inline\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-fit \"><a href=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-20250305-s00243.jpg\"><img decoding=\"async\" width=\"2048\" height=\"1362\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-20250305-s00243.jpg?w=2048\" class=\"attachment-2048x2048 size-2048x2048\" alt=\"NASA software engineer Brandon Carver is seated at a desk\" style=\"transform: scale(1); transform-origin: 50% 50%; object-position: 50% 50%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-20250305-s00243.jpg 3610w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-20250305-s00243.jpg?resize=300,199 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-20250305-s00243.jpg?resize=768,511 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-20250305-s00243.jpg?resize=1024,681 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-20250305-s00243.jpg?resize=1536,1021 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-20250305-s00243.jpg?resize=2048,1362 2048w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-20250305-s00243.jpg?resize=400,266 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-20250305-s00243.jpg?resize=600,399 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-20250305-s00243.jpg?resize=900,598 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-20250305-s00243.jpg?resize=1200,798 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-20250305-s00243.jpg?resize=2000,1330 2000w\" sizes=\"auto, (max-width: 2048px) 100vw, 2048px\" \/><\/a><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">NASA software engineer Brandon Carver updates how the main data acquisition software processes information on March 5, 2025, at NASA\u2019s Stennis Space Center, where he has contributed to the creation of the center\u2019s first-ever open-source software.<\/div>\n<div class=\"hds-credits\">NASA\/Danny Nowlin<\/div>\n<\/figcaption><\/div>\n<\/div>\n<\/div>\n<div id=\"\" class=\"hds-media hds-module wp-block-image\">\n<div class=\"margin-left-auto margin-right-auto nasa-block-align-inline\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-cover \"><a href=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-20250305-s00246.jpg\"><img decoding=\"async\" width=\"2048\" height=\"1365\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-20250305-s00246.jpg?w=2048\" class=\"attachment-2048x2048 size-2048x2048\" alt=\"Syncom Space Services software engineer Shane Cravens stands at a workstation\" style=\"transform: scale(1); transform-origin: 50% 50%; object-position: 50% 50%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-20250305-s00246.jpg 3600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-20250305-s00246.jpg?resize=300,200 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-20250305-s00246.jpg?resize=768,512 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-20250305-s00246.jpg?resize=1024,683 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-20250305-s00246.jpg?resize=1536,1024 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-20250305-s00246.jpg?resize=2048,1365 2048w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-20250305-s00246.jpg?resize=400,267 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-20250305-s00246.jpg?resize=600,400 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-20250305-s00246.jpg?resize=900,600 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-20250305-s00246.jpg?resize=1200,800 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/05\/ssc-20250305-s00246.jpg?resize=2000,1333 2000w\" sizes=\"auto, (max-width: 2048px) 100vw, 2048px\" \/><\/a><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">Syncom Space Services software engineer Shane Cravens, the chief architect behind the first-ever open-source software at NASA\u2019s Stennis Space Center, verifies operation of the site\u2019s data acquisition hardware.<\/div>\n<div class=\"hds-credits\">NASA\/Danny Nowlin<\/div>\n<\/figcaption><\/div>\n<\/div>\n<\/div>\n<h2 class=\"wp-block-heading\"><strong>Community and Inspiration<\/strong><\/h2>\n<p>NASA Stennis connected with communities in creative ways in 2025.<\/p>\n<p>During Super Bowl week, NASA Stennis representatives inspired future explorers by bringing Artemis mission displays and hands-on activities to families at the Audubon Aquarium in New Orleans.<\/p>\n<p>In March, NASA Stennis supported the third annual FIRST Robotics Magnolia Regional as a lead sponsor with employees and interns volunteering at the event. The competition in Laurel, Mississippi, brought together 37 teams from eight U.S. states (Alabama, California, Florida, Louisiana, Minnesota, Mississippi, Missouri, and Tennessee) and Mexico. The FIRST (For the Inspiration and Recognition of Science and Technology) Robotics event joined NASA\u2019s Robotics Alliance Project to combine the excitement of sport with the rigors of science, technology, engineering, and mathematics (STEM) in field games using industrial-sized robots.<\/p>\n<p>That same spirit of hands-on learning continues at INFINITY Science Center, the official visitor center of NASA Stennis. A new interactive <a href=\"https:\/\/www.nasa.gov\/news-release\/exhibit-puts-visitors-in-test-conductor-seat\/\">exhibit<\/a> has provided visitors a chance to become a test conductor and simulate RS-25 engine tests for the engines that will help power NASA\u2019s Artemis missions.<\/p>\n<div id=\"\" class=\"hds-image-carousel grid-container grid-container-block padding-top-4 padding-bottom-4 hds-module hds-module-full alignfull wp-block-nasa-blocks-image-carousel\">\n<div id=\"carousel-wrapper-carousel-694448afa250a\" class=\"hds-carousel-wrapper\">\n<div class=\"image-carousel-slider margin-0\" id=\"image-carousel-slider-carousel-694448afa250a\"\n\t\t\t\tdata-client-id=\"carousel-694448afa250a\"\n\t\t\t\tdata-variation=\"carousel\"\n\t\t\t\tdata-autoplay=\"\" \n\t\t\t\tdata-autoplay-speed=\"2000\" \n\t\t\t\tdata-play-pause=\"\" \n\t\t\t\tdata-transition-type=\"slide\"\n\t\t\t\tdata-progress=\"\"\n\t\t\t\tdata-progress-labels=\"\"\n\t\t\t\tdata-start-label=\"Start\"\n\t\t\t\tdata-end-label=\"End\"\n\t\t\t\tdata-labels-initialized=\"true\"><\/p>\n<div class=\"display-block width-full\" data-label=\"\">\n<figure class=\"margin-0\">\n<div class=\"hds-cover-wrapper hds-image-carousel-slide margin-bottom-2\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-cover \"><img decoding=\"async\" width=\"1024\" height=\"577\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2024\/12\/s24-061-engine-test-simulator-2-e1735839370272.jpg?w=1024\" class=\"attachment-large size-large\" alt=\"A pair of young visitors to INFINITY Science Center\" style=\"transform: scale(1); transform-origin: 50% 50%; object-position: 50% 50%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" \/><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">A pair of young visitors to INFINITY Science Center carry out the steps of a simulated RS-25 engine hot fire on Dec. 19, 2024. The engine test simulator exhibit provided by NASA\u2019s Stennis Space Center takes users through the hot fire process just as real engineers do at NASA Stennis.<\/div>\n<div class=\"hds-credits\">NASA\/Danny Nowlin<\/div>\n<\/figcaption><\/div>\n<\/p><\/div>\n<\/figure><\/div>\n<div class=\"display-block width-full\" data-label=\"\">\n<figure class=\"margin-0\">\n<div class=\"hds-cover-wrapper hds-image-carousel-slide margin-bottom-2\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-cover \"><img decoding=\"async\" width=\"1024\" height=\"577\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/03\/ssc-20250207-s00082-nasa-in-nola-for-super-bowl-e1741096611134.jpg?w=1024\" class=\"attachment-large size-large\" alt=\"young event-goers participate in activity provided by NASA Stennis at the Audubon Aquarium\" style=\"transform: scale(1); transform-origin: 50% 50%; object-position: 50% 50%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" \/><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">NASA Stennis representatives inspire the Artemis Generation at the Audubon Aquarium in New Orleans on Feb. 7-8, 2025, with activities and displays highlighting space exploration, including NASA\u2019s Artemis missions to the Moon.<\/div>\n<div class=\"hds-credits\">NASA\/Danny Nowlin<\/div>\n<\/figcaption><\/div>\n<\/p><\/div>\n<\/figure><\/div>\n<div class=\"display-block width-full\" data-label=\"\">\n<figure class=\"margin-0\">\n<div class=\"hds-cover-wrapper hds-image-carousel-slide margin-bottom-2\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-cover \"><img decoding=\"async\" width=\"1024\" height=\"577\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/03\/ssc-20250207-s00093-nasa-in-nola-for-super-bowl-e1741096176331.jpg?w=1024\" class=\"attachment-large size-large\" alt=\"small crowd gathers to watch experiment by NASA Stennis representatives\" style=\"transform: scale(1); transform-origin: 50% 50%; object-position: 50% 50%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" \/><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">NASA Stennis representatives inspire the Artemis Generation at the Audubon Aquarium in New Orleans on Feb. 7-8, 2025, with activities and displays highlighting space exploration, including NASA\u2019s Artemis missions to the Moon.<\/div>\n<div class=\"hds-credits\">NASA\/Danny Nowlin<\/div>\n<\/figcaption><\/div>\n<\/p><\/div>\n<\/figure><\/div>\n<div class=\"display-block width-full\" data-label=\"\">\n<figure class=\"margin-0\">\n<div class=\"hds-cover-wrapper hds-image-carousel-slide margin-bottom-2\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-cover \"><img decoding=\"async\" width=\"683\" height=\"1024\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/03\/dsc-4451.jpg?w=683\" class=\"attachment-large size-large\" alt=\"NASA serves as a lead sponsor, along with NASA Stennis employees and interns volunteering, for the third annual FIRST Robotics Magnolia Regional Competition on March 14.\" style=\"transform: scale(1); transform-origin: 53% 26%; object-position: 53% 26%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/03\/dsc-4451.jpg 1600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/03\/dsc-4451.jpg?resize=200,300 200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/03\/dsc-4451.jpg?resize=768,1152 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/03\/dsc-4451.jpg?resize=683,1024 683w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/03\/dsc-4451.jpg?resize=1024,1536 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/03\/dsc-4451.jpg?resize=1365,2048 1365w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/03\/dsc-4451.jpg?resize=267,400 267w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/03\/dsc-4451.jpg?resize=400,600 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/03\/dsc-4451.jpg?resize=600,900 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/03\/dsc-4451.jpg?resize=800,1200 800w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/03\/dsc-4451.jpg?resize=1333,2000 1333w\" sizes=\"auto, (max-width: 683px) 100vw, 683px\" \/><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">NASA serves as a lead sponsor, along with NASA Stennis employees and interns volunteering, for the third annual FIRST Robotics Magnolia Regional Competition on March 14, 2025. The event in Laurel, Mississippi, welcomed 37 teams from eight states (Alabama, California, Florida, Louisiana, Minnesota, Missouri, Mississippi, and Tennessee) and one team from Mexico. The FIRST (For the Inspiration and Recognition of Science and Technology) Robotics event joined NASA\u2019s Robotics Alliance Project to combine the excitement of sport with the rigors of science, technology, engineering, and mathematics (STEM) in field games using industrial-sized robots.<\/div>\n<div class=\"hds-credits\">NASA\/Danny Nowlin<\/div>\n<\/figcaption><\/div>\n<\/p><\/div>\n<\/figure><\/div>\n<div class=\"display-block width-full\" data-label=\"\">\n<figure class=\"margin-0\">\n<div class=\"hds-cover-wrapper hds-image-carousel-slide margin-bottom-2\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-cover \"><img decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/12\/ssc-20250314-s00188h.jpg?w=1024\" class=\"attachment-large size-large\" alt=\"a team of FIRST Robotics competitors with Michele Beisler\" style=\"transform: scale(1); transform-origin: 50% 50%; object-position: 50% 50%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/12\/ssc-20250314-s00188h.jpg 5568w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/12\/ssc-20250314-s00188h.jpg?resize=300,200 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/12\/ssc-20250314-s00188h.jpg?resize=768,512 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/12\/ssc-20250314-s00188h.jpg?resize=1024,683 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/12\/ssc-20250314-s00188h.jpg?resize=1536,1024 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/12\/ssc-20250314-s00188h.jpg?resize=2048,1365 2048w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/12\/ssc-20250314-s00188h.jpg?resize=400,267 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/12\/ssc-20250314-s00188h.jpg?resize=600,400 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/12\/ssc-20250314-s00188h.jpg?resize=900,600 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/12\/ssc-20250314-s00188h.jpg?resize=1200,800 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/12\/ssc-20250314-s00188h.jpg?resize=2000,1333 2000w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">NASA serves as a lead sponsor, along with NASA Stennis employees and interns volunteering, for the third annual FIRST Robotics Magnolia Regional Competition on March 14, 2025. The event in Laurel, Mississippi, welcomed 37 teams from eight states (Alabama, California, Florida, Louisiana, Minnesota, Missouri, Mississippi, and Tennessee) and one team from Mexico. The FIRST (For the Inspiration and Recognition of Science and Technology) Robotics event joined NASA\u2019s Robotics Alliance Project to combine the excitement of sport with the rigors of science, technology, engineering, and mathematics (STEM) in field games using industrial-sized robots.<\/div>\n<div class=\"hds-credits\">NASA\/Danny Nowlin<\/div>\n<\/figcaption><\/div>\n<\/p><\/div>\n<\/figure><\/div>\n<\/p><\/div>\n<div class=\"hds-carousel-nav display-flex margin-left-auto margin-right-0\" data-carousel-id=\"image-carousel-slider-carousel-694448afa250a\">\n\t\t\t\t<button class=\"hds-carousel-nav-arrow hds-carousel-arrow-prev\"><br \/>\n\t\t\t\t\t<svg version=\"1.1\" x=\"0px\" y=\"0px\" width=\"9px\" height=\"9px\" viewBox=\"0 0 9 9\"><path class=\"st0\" d=\"M3.5,4.5l3.7-3.6L6.3,0L1.8,4.5L6.3,9l0.9-0.9L3.5,4.5z\"><\/path><\/svg><br \/>\n\t\t\t\t<\/button><br \/>\n\t\t\t\t\t\t\t<button class=\"hds-carousel-nav-arrow hds-carousel-arrow-next margin-right-0\"><br \/>\n\t\t\t\t\t<svg version=\"1.1\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" x=\"0px\" y=\"0px\" width=\"9px\" height=\"9px\" viewBox=\"0 0 9 9\"><path class=\"st0\" d=\"M5.5,4.5L1.8,8.1L2.7,9l4.5-4.5L2.7,0L1.8,0.9L5.5,4.5z\"><\/path><\/svg><br \/>\n\t\t\t\t<\/button>\n\t\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<h2 class=\"wp-block-heading\"><strong>A Winter Wonderland<\/strong><\/h2>\n<p>Hancock County, where NASA Stennis is located, received five to seven inches of snow on Jan. 21, 2025, according to the National Weather Service. It marked the most snow Hancock County, Mississippi, has received in 61 years. The Dec. 31, 1963, snowfall holds the record at 10 inches of snow for Bay St. Louis, Mississippi.<\/p>\n<div id=\"\" class=\"hds-image-carousel grid-container grid-container-block padding-top-4 padding-bottom-4 hds-module hds-module-full alignfull wp-block-nasa-blocks-image-carousel\">\n<div id=\"carousel-wrapper-carousel-694448afa391b\" class=\"hds-carousel-wrapper\">\n<div class=\"image-carousel-slider margin-0\" id=\"image-carousel-slider-carousel-694448afa391b\"\n\t\t\t\tdata-client-id=\"carousel-694448afa391b\"\n\t\t\t\tdata-variation=\"carousel\"\n\t\t\t\tdata-autoplay=\"\" \n\t\t\t\tdata-autoplay-speed=\"2000\" \n\t\t\t\tdata-play-pause=\"\" \n\t\t\t\tdata-transition-type=\"slide\"\n\t\t\t\tdata-progress=\"\"\n\t\t\t\tdata-progress-labels=\"\"\n\t\t\t\tdata-start-label=\"Start\"\n\t\t\t\tdata-end-label=\"End\"\n\t\t\t\tdata-labels-initialized=\"true\"><\/p>\n<div class=\"display-block width-full\" data-label=\"\">\n<figure class=\"margin-0\">\n<div class=\"hds-cover-wrapper hds-image-carousel-slide margin-bottom-2\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-cover \"><img decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-1-e1738342536453.jpg?w=1024\" class=\"attachment-large size-large\" alt=\"view of security gate at Stennis Space Center as snow covered the area\" style=\"transform: scale(1); transform-origin: 77% 43%; object-position: 77% 43%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-1-e1738342536453.jpg 1851w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-1-e1738342536453.jpg?resize=300,169 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-1-e1738342536453.jpg?resize=768,432 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-1-e1738342536453.jpg?resize=1024,576 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-1-e1738342536453.jpg?resize=1536,865 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-1-e1738342536453.jpg?resize=400,225 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-1-e1738342536453.jpg?resize=600,338 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-1-e1738342536453.jpg?resize=900,507 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-1-e1738342536453.jpg?resize=1200,676 1200w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">A series of cell phone and stationary camera images record snowfall at NASA\u2019s Stennis Space Center on Jan. 21, 2025.<\/div>\n<div class=\"hds-credits\">NASA\/Stennis<\/div>\n<\/figcaption><\/div>\n<\/p><\/div>\n<\/figure><\/div>\n<div class=\"display-block width-full\" data-label=\"\">\n<figure class=\"margin-0\">\n<div class=\"hds-cover-wrapper hds-image-carousel-slide margin-bottom-2\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-cover \"><img decoding=\"async\" width=\"1024\" height=\"577\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-3-e1738342378184.jpg?w=1024\" class=\"attachment-large size-large\" alt=\"Building 1100 at Stennis Space Center is shown covered in snow\" style=\"transform: scale(1.1); transform-origin: 42% 54%; object-position: 42% 54%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-3-e1738342378184.jpg 2016w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-3-e1738342378184.jpg?resize=300,169 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-3-e1738342378184.jpg?resize=768,432 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-3-e1738342378184.jpg?resize=1024,577 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-3-e1738342378184.jpg?resize=1536,865 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-3-e1738342378184.jpg?resize=400,225 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-3-e1738342378184.jpg?resize=600,338 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-3-e1738342378184.jpg?resize=900,507 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-3-e1738342378184.jpg?resize=1200,676 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-3-e1738342378184.jpg?resize=2000,1126 2000w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">A series of cell phone and stationary camera images record snowfall at NASA\u2019s Stennis Space Center on Jan. 21, 2025.<\/div>\n<div class=\"hds-credits\">NASA\/Stennis<\/div>\n<\/figcaption><\/div>\n<\/p><\/div>\n<\/figure><\/div>\n<div class=\"display-block width-full\" data-label=\"\">\n<figure class=\"margin-0\">\n<div class=\"hds-cover-wrapper hds-image-carousel-slide margin-bottom-2\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-cover \"><img decoding=\"async\" width=\"1024\" height=\"577\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-5-e1738342269428.jpg?w=1024\" class=\"attachment-large size-large\" alt=\"cars covered in snow at Stennis Space Center\" style=\"transform: scale(1); transform-origin: 52% 53%; object-position: 52% 53%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-5-e1738342269428.jpg 1912w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-5-e1738342269428.jpg?resize=300,169 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-5-e1738342269428.jpg?resize=768,433 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-5-e1738342269428.jpg?resize=1024,577 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-5-e1738342269428.jpg?resize=1536,865 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-5-e1738342269428.jpg?resize=400,225 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-5-e1738342269428.jpg?resize=600,338 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-5-e1738342269428.jpg?resize=900,507 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-5-e1738342269428.jpg?resize=1200,676 1200w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">A series of cell phone and stationary camera images record snowfall at NASA\u2019s Stennis Space Center on Jan. 21, 2025.<\/div>\n<div class=\"hds-credits\">NASA\/Stennis<\/div>\n<\/figcaption><\/div>\n<\/p><\/div>\n<\/figure><\/div>\n<div class=\"display-block width-full\" data-label=\"\">\n<figure class=\"margin-0\">\n<div class=\"hds-cover-wrapper hds-image-carousel-slide margin-bottom-2\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-cover \"><img decoding=\"async\" width=\"1024\" height=\"577\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-6-e1738342162218.jpg?w=1024\" class=\"attachment-large size-large\" alt=\"The Little Red Schoolhouse is covered in snow at Stennis Space Center\" style=\"transform: scale(1.2); transform-origin: 50% 53%; object-position: 50% 53%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-6-e1738342162218.jpg 2016w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-6-e1738342162218.jpg?resize=300,169 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-6-e1738342162218.jpg?resize=768,432 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-6-e1738342162218.jpg?resize=1024,577 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-6-e1738342162218.jpg?resize=1536,865 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-6-e1738342162218.jpg?resize=400,225 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-6-e1738342162218.jpg?resize=600,338 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-6-e1738342162218.jpg?resize=900,507 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-6-e1738342162218.jpg?resize=1200,676 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-6-e1738342162218.jpg?resize=2000,1126 2000w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">A series of cell phone and stationary camera images record snowfall at NASA\u2019s Stennis Space Center on Jan. 21, 2025.<\/div>\n<div class=\"hds-credits\">NASA\/Stennis<\/div>\n<\/figcaption><\/div>\n<\/p><\/div>\n<\/figure><\/div>\n<div class=\"display-block width-full\" data-label=\"\">\n<figure class=\"margin-0\">\n<div class=\"hds-cover-wrapper hds-image-carousel-slide margin-bottom-2\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-cover \"><img decoding=\"async\" width=\"1024\" height=\"577\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-7-e1738342240901.jpg?w=1024\" class=\"attachment-large size-large\" alt=\"a tug boat is seen in the distance covered in snow at Stennis Space Center\" style=\"transform: scale(1.2); transform-origin: 36% 5%; object-position: 36% 5%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-7-e1738342240901.jpg 2016w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-7-e1738342240901.jpg?resize=300,169 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-7-e1738342240901.jpg?resize=768,432 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-7-e1738342240901.jpg?resize=1024,577 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-7-e1738342240901.jpg?resize=1536,865 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-7-e1738342240901.jpg?resize=400,225 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-7-e1738342240901.jpg?resize=600,338 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-7-e1738342240901.jpg?resize=900,507 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-7-e1738342240901.jpg?resize=1200,676 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-7-e1738342240901.jpg?resize=2000,1126 2000w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">A series of cell phone and stationary camera images record snowfall at NASA\u2019s Stennis Space Center on Jan. 21, 2025.<\/div>\n<div class=\"hds-credits\">NASA\/Stennis<\/div>\n<\/figcaption><\/div>\n<\/p><\/div>\n<\/figure><\/div>\n<div class=\"display-block width-full\" data-label=\"\">\n<figure class=\"margin-0\">\n<div class=\"hds-cover-wrapper hds-image-carousel-slide margin-bottom-2\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-cover \"><img decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-8.jpg?w=1024\" class=\"attachment-large size-large\" alt=\"the top of Fred Haise Test Stand covered in snow\" style=\"transform: scale(1); transform-origin: 51% 51%; object-position: 51% 51%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-8.jpg 2880w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-8.jpg?resize=300,169 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-8.jpg?resize=768,432 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-8.jpg?resize=1024,576 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-8.jpg?resize=1536,864 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-8.jpg?resize=2048,1152 2048w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-8.jpg?resize=400,225 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-8.jpg?resize=600,338 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-8.jpg?resize=900,506 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-8.jpg?resize=1200,675 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-8.jpg?resize=2000,1125 2000w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">A series of cell phone and stationary camera images record snowfall at NASA\u2019s Stennis Space Center on Jan. 21, 2025.<\/div>\n<div class=\"hds-credits\">NASA\/Stennis<\/div>\n<\/figcaption><\/div>\n<\/p><\/div>\n<\/figure><\/div>\n<div class=\"display-block width-full\" data-label=\"\">\n<figure class=\"margin-0\">\n<div class=\"hds-cover-wrapper hds-image-carousel-slide margin-bottom-2\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-cover \"><img decoding=\"async\" width=\"768\" height=\"1024\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-9.jpeg?w=768\" class=\"attachment-large size-large\" alt=\"a test stand is shown in the background across a field of fresh snow\" style=\"transform: scale(1.2); transform-origin: 52% 39%; object-position: 52% 39%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-9.jpeg 3024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-9.jpeg?resize=225,300 225w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-9.jpeg?resize=768,1024 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-9.jpeg?resize=1152,1536 1152w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-9.jpeg?resize=1536,2048 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-9.jpeg?resize=300,400 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-9.jpeg?resize=450,600 450w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-9.jpeg?resize=675,900 675w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-9.jpeg?resize=900,1200 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-9.jpeg?resize=1500,2000 1500w\" sizes=\"auto, (max-width: 768px) 100vw, 768px\" \/><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">A series of cell phone and stationary camera images record snowfall at NASA\u2019s Stennis Space Center on Jan. 21, 2025.<\/div>\n<div class=\"hds-credits\">NASA\/Stennis<\/div>\n<\/figcaption><\/div>\n<\/p><\/div>\n<\/figure><\/div>\n<div class=\"display-block width-full\" data-label=\"\">\n<figure class=\"margin-0\">\n<div class=\"hds-cover-wrapper hds-image-carousel-slide margin-bottom-2\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-cover \"><img decoding=\"async\" width=\"1024\" height=\"577\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-10-e1738342215366.jpg?w=1024\" class=\"attachment-large size-large\" alt=\"view of gate entrance to Stennis Space Center with freshly fallen snow\" style=\"transform: scale(1.2); transform-origin: 89% 49%; object-position: 89% 49%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" \/><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">A series of cell phone and stationary camera images record snowfall at NASA\u2019s Stennis Space Center on Jan. 21, 2025.<\/div>\n<div class=\"hds-credits\">NASA\/Stennis<\/div>\n<\/figcaption><\/div>\n<\/p><\/div>\n<\/figure><\/div>\n<div class=\"display-block width-full\" data-label=\"\">\n<figure class=\"margin-0\">\n<div class=\"hds-cover-wrapper hds-image-carousel-slide margin-bottom-2\">\n<div class=\"hds-media-wrapper margin-left-auto margin-right-auto\">\n<figure class=\"hds-media-inner hds-cover-wrapper hds-media-ratio-cover \"><img decoding=\"async\" width=\"1024\" height=\"577\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/01\/stennis-winter-11-e1738342186686.jpg?w=1024\" class=\"attachment-large size-large\" alt=\"a test stand at Stennis Space Center lightly covered in snow\" style=\"transform: scale(1.2); transform-origin: 54% 3%; object-position: 54% 3%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" \/><\/figure><figcaption class=\"hds-caption padding-y-2\">\n<div class=\"hds-caption-text p-sm margin-0\">A series of cell phone and stationary camera images record snowfall at NASA\u2019s Stennis Space Center on Jan. 21, 2025.<\/div>\n<div class=\"hds-credits\">NASA\/Stennis<\/div>\n<\/figcaption><\/div>\n<\/p><\/div>\n<\/figure><\/div>\n<\/p><\/div>\n<div class=\"hds-carousel-nav display-flex margin-left-auto margin-right-0\" data-carousel-id=\"image-carousel-slider-carousel-694448afa391b\">\n\t\t\t\t<button class=\"hds-carousel-nav-arrow hds-carousel-arrow-prev\"><br \/>\n\t\t\t\t\t<svg version=\"1.1\" x=\"0px\" y=\"0px\" width=\"9px\" height=\"9px\" viewBox=\"0 0 9 9\"><path class=\"st0\" d=\"M3.5,4.5l3.7-3.6L6.3,0L1.8,4.5L6.3,9l0.9-0.9L3.5,4.5z\"><\/path><\/svg><br \/>\n\t\t\t\t<\/button><br \/>\n\t\t\t\t\t\t\t<button class=\"hds-carousel-nav-arrow hds-carousel-arrow-next margin-right-0\"><br \/>\n\t\t\t\t\t<svg version=\"1.1\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" x=\"0px\" y=\"0px\" width=\"9px\" height=\"9px\" viewBox=\"0 0 9 9\"><path class=\"st0\" d=\"M5.5,4.5L1.8,8.1L2.7,9l4.5-4.5L2.7,0L1.8,0.9L5.5,4.5z\"><\/path><\/svg><br \/>\n\t\t\t\t<\/button>\n\t\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n<h2 class=\"wp-block-heading\"><strong>Looking Ahead<\/strong><\/h2>\n<p>All in all, the year closes with members of the NASA Stennis team focused on what is to come.<\/p>\n<p>\u201cAs we close out 2025, NASA Stennis looks forward to the next chapter of our center as NASA sends astronauts to the Moon to prepare for future human exploration of Mars through the agency\u2019s Artemis campaign,\u201d said NASA Stennis Deputy Director Christine Powell. \u201cWe are ready for what\u2019s next.\u201d<\/p>\n<div id=\"\" class=\"nasa-gb-align-full width-full maxw-full padding-x-3 padding-y-0 hds-module hds-module-full alignfull wp-block-nasa-blocks-related-articles\">\n<section class=\"hds-related-articles padding-x-0 padding-y-3 desktop:padding-top-7 desktop:padding-bottom-9\">\n<div class=\"w-100 grid-row grid-container maxw-widescreen padding-0 text-align-left\">\n<div class=\"margin-bottom-4\">\n<h2 style=\"max-width: 100%;\" class=\"width-full w-full maxw-full\">Explore More<\/h2>\n<\/div><\/div>\n<div class=\"grid-row grid-container maxw-widescreen padding-0\">\n<div class=\"grid-col-12 desktop:grid-col-4 margin-bottom-4 desktop:margin-bottom-0 desktop:padding-right-3\">\n\t\t\t\t\t\t<a href=\"https:\/\/www.nasa.gov\/centers-and-facilities\/hq\/nasa-makes-webby-30s-list-of-most-iconic-influential-on-internet\/\" class=\"color-carbon-black\"><\/p>\n<div class=\"margin-bottom-2\">\n<div class=\"hds-cover-wrapper cover-hover-zoom bg-carbon-black minh-mobile\">\n<figure class=\"hds-media-background  \"><img decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/09\/nasa-webby-image-2-sept-2025.jpg?w=300\" class=\"attachment-medium size-medium\" alt=\"\" style=\"transform: scale(1); transform-origin: 50% 50%; object-position: 50% 50%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/09\/nasa-webby-image-2-sept-2025.jpg 8256w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/09\/nasa-webby-image-2-sept-2025.jpg?resize=300,200 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/09\/nasa-webby-image-2-sept-2025.jpg?resize=768,512 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/09\/nasa-webby-image-2-sept-2025.jpg?resize=1024,683 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/09\/nasa-webby-image-2-sept-2025.jpg?resize=1536,1024 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/09\/nasa-webby-image-2-sept-2025.jpg?resize=2048,1365 2048w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/09\/nasa-webby-image-2-sept-2025.jpg?resize=400,267 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/09\/nasa-webby-image-2-sept-2025.jpg?resize=600,400 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/09\/nasa-webby-image-2-sept-2025.jpg?resize=900,600 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/09\/nasa-webby-image-2-sept-2025.jpg?resize=1200,800 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/09\/nasa-webby-image-2-sept-2025.jpg?resize=2000,1333 2000w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/figure>\n<\/p><\/div>\n<\/p><\/div>\n<div class=\"padding-right-0 desktop:padding-right-10\">\n<div class=\"subheading margin-bottom-1\">2 min read<\/div>\n<div class=\"margin-bottom-1\">\n<h3 class=\"related-article-title\">NASA Makes Webby 30s List of Most Iconic, Influential on Internet<\/h3>\n<\/div>\n<div class=\"display-flex flex-align-center label related-article-label margin-bottom-1 color-carbon-60\">\n\t\t\t\t\t\t\t\t\t<span class=\"display-flex flex-align-center margin-right-2\"><br \/>\n\t\t\t\t\t\t\t\t\t\t<svg version=\"1.1\" class=\"square-2 margin-right-1\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" xmlns:xlink=\"http:\/\/www.w3.org\/1999\/xlink\" x=\"0px\" y=\"0px\" width=\"16px\" height=\"16px\" viewBox=\"0 0 16 16\" style=\"enable-background:new 0 0 16 16;\" xml:space=\"preserve\"><g><g><path d=\"M8,0C3.5,0-0.1,3.7,0,8.2C0.1,12.5,3.6,16,8,16c4.4,0,8-3.6,8-8C16,3.5,12.4,0,8,0z M8,15.2 C4,15.2,0.8,12,0.8,8C0.8,4,4,0.8,8,0.8c3.9,0,7.2,3.2,7.2,7.1C15.2,11.9,12,15.2,8,15.2z\"\/><path d=\"M5.6,12c0.8-0.8,1.6-1.6,2.4-2.4c0.8,0.8,1.6,1.6,2.4,2.4c0-2.7,0-5.3,0-8C8.8,4,7.2,4,5.6,4 C5.6,6.7,5.6,9.3,5.6,12z\"\/><\/g><\/g><\/svg><br \/>\n\t\t\t\t\t\t\t\t\t\t<span>Article<\/span><br \/>\n\t\t\t\t\t\t\t\t\t<\/span><br \/>\n\t\t\t\t\t\t\t\t\t<span class=\"\"><br \/>\n\t\t\t\t\t\t\t\t\t\t3 months ago\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t<\/div>\n<\/p><\/div>\n<p>\t\t\t\t\t\t<\/a>\n\t\t\t\t\t<\/div>\n<div class=\"grid-col-12 desktop:grid-col-4 margin-bottom-4 desktop:margin-bottom-0 desktop:padding-right-3\">\n\t\t\t\t\t\t<a href=\"https:\/\/www.nasa.gov\/centers-and-facilities\/stennis\/model-federal-city\/\" class=\"color-carbon-black\"><\/p>\n<div class=\"margin-bottom-2\">\n<div class=\"hds-cover-wrapper cover-hover-zoom bg-carbon-black minh-mobile\">\n<figure class=\"hds-media-background  \"><img decoding=\"async\" width=\"300\" height=\"189\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2017\/08\/bufferzone.png?w=300\" class=\"attachment-medium size-medium\" alt=\"\" style=\"transform: scale(1); transform-origin: 50% 50%; object-position: 50% 50%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2017\/08\/bufferzone.png 1499w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2017\/08\/bufferzone.png?resize=300,189 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2017\/08\/bufferzone.png?resize=768,483 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2017\/08\/bufferzone.png?resize=1024,644 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2017\/08\/bufferzone.png?resize=400,252 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2017\/08\/bufferzone.png?resize=600,377 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2017\/08\/bufferzone.png?resize=900,566 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2017\/08\/bufferzone.png?resize=1200,755 1200w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/figure>\n<\/p><\/div>\n<\/p><\/div>\n<div class=\"padding-right-0 desktop:padding-right-10\">\n<div class=\"subheading margin-bottom-1\">5 min read<\/div>\n<div class=\"margin-bottom-1\">\n<h3 class=\"related-article-title\">Crossroads to the Future \u2013 NASA Stennis Grows into a Model Federal City<\/h3>\n<\/div>\n<div class=\"display-flex flex-align-center label related-article-label margin-bottom-1 color-carbon-60\">\n\t\t\t\t\t\t\t\t\t<span class=\"display-flex flex-align-center margin-right-2\"><br \/>\n\t\t\t\t\t\t\t\t\t\t<svg version=\"1.1\" class=\"square-2 margin-right-1\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" xmlns:xlink=\"http:\/\/www.w3.org\/1999\/xlink\" x=\"0px\" y=\"0px\" width=\"16px\" height=\"16px\" viewBox=\"0 0 16 16\" style=\"enable-background:new 0 0 16 16;\" xml:space=\"preserve\"><g><g><path d=\"M8,0C3.5,0-0.1,3.7,0,8.2C0.1,12.5,3.6,16,8,16c4.4,0,8-3.6,8-8C16,3.5,12.4,0,8,0z M8,15.2 C4,15.2,0.8,12,0.8,8C0.8,4,4,0.8,8,0.8c3.9,0,7.2,3.2,7.2,7.1C15.2,11.9,12,15.2,8,15.2z\"\/><path d=\"M5.6,12c0.8-0.8,1.6-1.6,2.4-2.4c0.8,0.8,1.6,1.6,2.4,2.4c0-2.7,0-5.3,0-8C8.8,4,7.2,4,5.6,4 C5.6,6.7,5.6,9.3,5.6,12z\"\/><\/g><\/g><\/svg><br \/>\n\t\t\t\t\t\t\t\t\t\t<span>Article<\/span><br \/>\n\t\t\t\t\t\t\t\t\t<\/span><br \/>\n\t\t\t\t\t\t\t\t\t<span class=\"\"><br \/>\n\t\t\t\t\t\t\t\t\t\t3 months ago\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t<\/div>\n<\/p><\/div>\n<p>\t\t\t\t\t\t<\/a>\n\t\t\t\t\t<\/div>\n<div class=\"grid-col-12 desktop:grid-col-4 margin-bottom-4 desktop:margin-bottom-0 desktop:padding-right-3\">\n\t\t\t\t\t\t<a href=\"https:\/\/www.nasa.gov\/centers-and-facilities\/stennis\/ideal-location-for-range-of-site-tenants\/\" class=\"color-carbon-black\"><\/p>\n<div class=\"margin-bottom-2\">\n<div class=\"hds-cover-wrapper cover-hover-zoom bg-carbon-black minh-mobile\">\n<figure class=\"hds-media-background  \"><img decoding=\"async\" width=\"300\" height=\"200\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/09\/federal-city-ssc-2013-00650h.jpg?w=300\" class=\"attachment-medium size-medium\" alt=\"\" style=\"transform: scale(1); transform-origin: 50% 50%; object-position: 50% 50%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/09\/federal-city-ssc-2013-00650h.jpg 4248w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/09\/federal-city-ssc-2013-00650h.jpg?resize=300,200 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/09\/federal-city-ssc-2013-00650h.jpg?resize=768,512 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/09\/federal-city-ssc-2013-00650h.jpg?resize=1024,683 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/09\/federal-city-ssc-2013-00650h.jpg?resize=1536,1024 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/09\/federal-city-ssc-2013-00650h.jpg?resize=2048,1365 2048w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/09\/federal-city-ssc-2013-00650h.jpg?resize=400,267 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/09\/federal-city-ssc-2013-00650h.jpg?resize=600,400 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/09\/federal-city-ssc-2013-00650h.jpg?resize=900,600 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/09\/federal-city-ssc-2013-00650h.jpg?resize=1200,800 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2025\/09\/federal-city-ssc-2013-00650h.jpg?resize=2000,1333 2000w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/figure>\n<\/p><\/div>\n<\/p><\/div>\n<div class=\"padding-right-0 desktop:padding-right-10\">\n<div class=\"subheading margin-bottom-1\">4 min read<\/div>\n<div class=\"margin-bottom-1\">\n<h3 class=\"related-article-title\">NASA Stennis Provides Ideal Location for Range of Site Tenants<\/h3>\n<\/div>\n<div class=\"display-flex flex-align-center label related-article-label margin-bottom-1 color-carbon-60\">\n\t\t\t\t\t\t\t\t\t<span class=\"display-flex flex-align-center margin-right-2\"><br \/>\n\t\t\t\t\t\t\t\t\t\t<svg version=\"1.1\" class=\"square-2 margin-right-1\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" xmlns:xlink=\"http:\/\/www.w3.org\/1999\/xlink\" x=\"0px\" y=\"0px\" width=\"16px\" height=\"16px\" viewBox=\"0 0 16 16\" style=\"enable-background:new 0 0 16 16;\" xml:space=\"preserve\"><g><g><path d=\"M8,0C3.5,0-0.1,3.7,0,8.2C0.1,12.5,3.6,16,8,16c4.4,0,8-3.6,8-8C16,3.5,12.4,0,8,0z M8,15.2 C4,15.2,0.8,12,0.8,8C0.8,4,4,0.8,8,0.8c3.9,0,7.2,3.2,7.2,7.1C15.2,11.9,12,15.2,8,15.2z\"\/><path d=\"M5.6,12c0.8-0.8,1.6-1.6,2.4-2.4c0.8,0.8,1.6,1.6,2.4,2.4c0-2.7,0-5.3,0-8C8.8,4,7.2,4,5.6,4 C5.6,6.7,5.6,9.3,5.6,12z\"\/><\/g><\/g><\/svg><br \/>\n\t\t\t\t\t\t\t\t\t\t<span>Article<\/span><br \/>\n\t\t\t\t\t\t\t\t\t<\/span><br \/>\n\t\t\t\t\t\t\t\t\t<span class=\"\"><br \/>\n\t\t\t\t\t\t\t\t\t\t3 months ago\t\t\t\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t<\/div>\n<\/p><\/div>\n<p>\t\t\t\t\t\t<\/a>\n\t\t\t\t\t<\/div>\n<\/p><\/div>\n<\/section><\/div>\n<div id=\"\" class=\"hds-topic-cards nasa-gb-align-full maxw-full width-full padding-y-6 padding-x-3 color-mode-dark hds-module hds-module-full alignfull wp-block-nasa-blocks-topic-cards\">\n<div class=\"grid-container grid-container-block-lg padding-x-0\">\n<div class=\"grid-row flex-align-center margin-bottom-3\">\n<div class=\"desktop:grid-col-8 margin-bottom-2 desktop:margin-bottom-0\">\n<div class=\"label color-carbon-60 margin-bottom-2\">Keep Exploring<\/div>\n<h2 class=\"heading-36 line-height-sm\">Discover More Topics from NASA Stennis<\/h2>\n<\/p><\/div>\n<\/p><\/div>\n<div class=\"grid-row grid-gap-2 hds-topic-cards-wrapper\">\n\t\t\t\t\t<a href=\"https:\/\/www.nasa.gov\/stennis\/about-stennis\/stennis-space-center-history\/\" class=\"mobile:grid-col-12 tablet:grid-col-6 desktop:grid-col-3 topic-card margin-bottom-4 desktop:margin-bottom-0\"><\/p>\n<div class=\"hds-topic-card hds-cover-wrapper cover-hover-zoom bg-carbon-black\">\n<div class=\"skrim-overlay skrim-overlay-dark skrim-left mobile-skrim-top padding-3 display-flex flex-align-end flex-justify-start z-200\">\n<div>\n<p class=\"hds-topic-card-heading heading-29 color-spacesuit-white line-height-sm margin-top-0 margin-bottom-1\">\n\t\t\t\t\t\t\t\t<span>NASA&#8217;s Stennis Space Center History<\/span><br \/>\n\t\t\t\t\t\t\t\t<svg viewBox=\"0 0 32 32\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><circle class=\"color-nasa-red\" cx=\"16\" cy=\"16\" r=\"16\"><\/circle><path d=\"M8 16.956h12.604l-3.844 4.106 1.252 1.338L24 16l-5.988-6.4-1.252 1.338 3.844 4.106H8v1.912z\" class=\"color-spacesuit-white\"><\/path><\/svg>\n\t\t\t\t\t\t\t<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<figure class=\"hds-media-background  \"><img decoding=\"async\" width=\"1229\" height=\"1536\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2022\/01\/66-1443c.jpg?w=1229\" class=\"attachment-1536x1536 size-1536x1536\" alt=\"\" style=\"transform: scale(1); transform-origin: 50% 50%; object-position: 50% 50%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2022\/01\/66-1443c.jpg 2048w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2022\/01\/66-1443c.jpg?resize=240,300 240w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2022\/01\/66-1443c.jpg?resize=768,960 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2022\/01\/66-1443c.jpg?resize=819,1024 819w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2022\/01\/66-1443c.jpg?resize=1229,1536 1229w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2022\/01\/66-1443c.jpg?resize=1638,2048 1638w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2022\/01\/66-1443c.jpg?resize=320,400 320w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2022\/01\/66-1443c.jpg?resize=480,600 480w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2022\/01\/66-1443c.jpg?resize=720,900 720w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2022\/01\/66-1443c.jpg?resize=960,1200 960w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2022\/01\/66-1443c.jpg?resize=1600,2000 1600w\" sizes=\"auto, (max-width: 1229px) 100vw, 1229px\" \/><\/figure>\n<\/p><\/div>\n<p>\t\t\t<\/a><br \/>\n\t\t\t\t\t<a href=\"https:\/\/www.nasa.gov\/stennis\/about-stennis\/employers-and-careers\/\" class=\"mobile:grid-col-12 tablet:grid-col-6 desktop:grid-col-3 topic-card margin-bottom-4 desktop:margin-bottom-0\"><\/p>\n<div class=\"hds-topic-card hds-cover-wrapper cover-hover-zoom bg-carbon-black\">\n<div class=\"skrim-overlay skrim-overlay-dark skrim-left mobile-skrim-top padding-3 display-flex flex-align-end flex-justify-start z-200\">\n<div>\n<p class=\"hds-topic-card-heading heading-29 color-spacesuit-white line-height-sm margin-top-0 margin-bottom-1\">\n\t\t\t\t\t\t\t\t<span>Employers and Careers at NASA Stennis<\/span><br \/>\n\t\t\t\t\t\t\t\t<svg viewBox=\"0 0 32 32\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><circle class=\"color-nasa-red\" cx=\"16\" cy=\"16\" r=\"16\"><\/circle><path d=\"M8 16.956h12.604l-3.844 4.106 1.252 1.338L24 16l-5.988-6.4-1.252 1.338 3.844 4.106H8v1.912z\" class=\"color-spacesuit-white\"><\/path><\/svg>\n\t\t\t\t\t\t\t<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<figure class=\"hds-media-background  \"><img decoding=\"async\" width=\"1536\" height=\"1028\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/06\/nasa-stennis-test-complexes-on-display.jpg?w=1536\" class=\"attachment-1536x1536 size-1536x1536\" alt=\"\" style=\"transform: scale(1); transform-origin: 50% 50%; object-position: 50% 50%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/06\/nasa-stennis-test-complexes-on-display.jpg 3000w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/06\/nasa-stennis-test-complexes-on-display.jpg?resize=300,201 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/06\/nasa-stennis-test-complexes-on-display.jpg?resize=768,514 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/06\/nasa-stennis-test-complexes-on-display.jpg?resize=1024,685 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/06\/nasa-stennis-test-complexes-on-display.jpg?resize=1536,1028 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/06\/nasa-stennis-test-complexes-on-display.jpg?resize=2048,1371 2048w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/06\/nasa-stennis-test-complexes-on-display.jpg?resize=400,268 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/06\/nasa-stennis-test-complexes-on-display.jpg?resize=600,402 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/06\/nasa-stennis-test-complexes-on-display.jpg?resize=900,602 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/06\/nasa-stennis-test-complexes-on-display.jpg?resize=1200,803 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2023\/06\/nasa-stennis-test-complexes-on-display.jpg?resize=2000,1339 2000w\" sizes=\"auto, (max-width: 1536px) 100vw, 1536px\" \/><\/figure>\n<\/p><\/div>\n<p>\t\t\t<\/a><br \/>\n\t\t\t\t\t<a href=\"https:\/\/www.nasa.gov\/stennis\/media-resources\/stennis-fact-sheets\/\" class=\"mobile:grid-col-12 tablet:grid-col-6 desktop:grid-col-3 topic-card margin-bottom-4 desktop:margin-bottom-0\"><\/p>\n<div class=\"hds-topic-card hds-cover-wrapper cover-hover-zoom bg-carbon-black\">\n<div class=\"skrim-overlay skrim-overlay-dark skrim-left mobile-skrim-top padding-3 display-flex flex-align-end flex-justify-start z-200\">\n<div>\n<p class=\"hds-topic-card-heading heading-29 color-spacesuit-white line-height-sm margin-top-0 margin-bottom-1\">\n\t\t\t\t\t\t\t\t<span>NASA Stennis Fact Sheets<\/span><br \/>\n\t\t\t\t\t\t\t\t<svg viewBox=\"0 0 32 32\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><circle class=\"color-nasa-red\" cx=\"16\" cy=\"16\" r=\"16\"><\/circle><path d=\"M8 16.956h12.604l-3.844 4.106 1.252 1.338L24 16l-5.988-6.4-1.252 1.338 3.844 4.106H8v1.912z\" class=\"color-spacesuit-white\"><\/path><\/svg>\n\t\t\t\t\t\t\t<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<figure class=\"hds-media-background  \"><img decoding=\"async\" width=\"1536\" height=\"1024\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2018\/12\/ssc-2004-04908h_-_general.jpg?w=1536\" class=\"attachment-1536x1536 size-1536x1536\" alt=\"\" style=\"transform: scale(1); transform-origin: 50% 50%; object-position: 50% 50%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2018\/12\/ssc-2004-04908h_-_general.jpg 2700w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2018\/12\/ssc-2004-04908h_-_general.jpg?resize=300,200 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2018\/12\/ssc-2004-04908h_-_general.jpg?resize=768,512 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2018\/12\/ssc-2004-04908h_-_general.jpg?resize=1024,683 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2018\/12\/ssc-2004-04908h_-_general.jpg?resize=1536,1024 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2018\/12\/ssc-2004-04908h_-_general.jpg?resize=2048,1365 2048w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2018\/12\/ssc-2004-04908h_-_general.jpg?resize=400,267 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2018\/12\/ssc-2004-04908h_-_general.jpg?resize=600,400 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2018\/12\/ssc-2004-04908h_-_general.jpg?resize=900,600 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2018\/12\/ssc-2004-04908h_-_general.jpg?resize=1200,800 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2018\/12\/ssc-2004-04908h_-_general.jpg?resize=2000,1333 2000w\" sizes=\"auto, (max-width: 1536px) 100vw, 1536px\" \/><\/figure>\n<\/p><\/div>\n<p>\t\t\t<\/a><br \/>\n\t\t\t\t\t<a href=\"https:\/\/www.nasa.gov\/stennis\/doing-business-with-stennis\/\" class=\"mobile:grid-col-12 tablet:grid-col-6 desktop:grid-col-3 topic-card margin-bottom-4 desktop:margin-bottom-0\"><\/p>\n<div class=\"hds-topic-card hds-cover-wrapper cover-hover-zoom bg-carbon-black\">\n<div class=\"skrim-overlay skrim-overlay-dark skrim-left mobile-skrim-top padding-3 display-flex flex-align-end flex-justify-start z-200\">\n<div>\n<p class=\"hds-topic-card-heading heading-29 color-spacesuit-white line-height-sm margin-top-0 margin-bottom-1\">\n\t\t\t\t\t\t\t\t<span>Doing Business with NASA Stennis<\/span><br \/>\n\t\t\t\t\t\t\t\t<svg viewBox=\"0 0 32 32\" fill=\"none\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><circle class=\"color-nasa-red\" cx=\"16\" cy=\"16\" r=\"16\"><\/circle><path d=\"M8 16.956h12.604l-3.844 4.106 1.252 1.338L24 16l-5.988-6.4-1.252 1.338 3.844 4.106H8v1.912z\" class=\"color-spacesuit-white\"><\/path><\/svg>\n\t\t\t\t\t\t\t<\/p>\n<\/p><\/div>\n<\/p><\/div>\n<figure class=\"hds-media-background  \"><img decoding=\"async\" width=\"1536\" height=\"1022\" src=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2015\/04\/ssc-2012-01000-full.jpg?w=1536\" class=\"attachment-1536x1536 size-1536x1536\" alt=\"\" style=\"transform: scale(1); transform-origin: 50% 50%; object-position: 50% 50%; object-fit: cover;\" block_context=\"nasa-block\" loading=\"lazy\" srcset=\"https:\/\/www.nasa.gov\/wp-content\/uploads\/2015\/04\/ssc-2012-01000-full.jpg 4256w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2015\/04\/ssc-2012-01000-full.jpg?resize=300,200 300w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2015\/04\/ssc-2012-01000-full.jpg?resize=768,511 768w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2015\/04\/ssc-2012-01000-full.jpg?resize=1024,681 1024w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2015\/04\/ssc-2012-01000-full.jpg?resize=1536,1022 1536w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2015\/04\/ssc-2012-01000-full.jpg?resize=2048,1363 2048w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2015\/04\/ssc-2012-01000-full.jpg?resize=400,266 400w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2015\/04\/ssc-2012-01000-full.jpg?resize=600,399 600w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2015\/04\/ssc-2012-01000-full.jpg?resize=900,599 900w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2015\/04\/ssc-2012-01000-full.jpg?resize=1200,798 1200w, https:\/\/www.nasa.gov\/wp-content\/uploads\/2015\/04\/ssc-2012-01000-full.jpg?resize=2000,1331 2000w\" sizes=\"auto, (max-width: 1536px) 100vw, 1536px\" \/><\/figure>\n<\/p><\/div>\n<p>\t\t\t<\/a>\n\t\t\t\t<\/div>\n<\/p><\/div>\n<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>In 2025, NASA\u2019s Stennis Space Center near Bay St. Louis, Mississippi, marked a year of progress by supporting NASA\u2019s Artemis campaign, celebrating historic milestones, and continuing its role as a trusted propulsion test partner at America\u2019s largest rocket propulsion test site. \u201cFor more than six decades, NASA Stennis has proudly represented the Gulf Coast region [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[15679],"tags":[],"class_list":["post-332673","post","type-post","status-publish","format-standard","hentry","category-stennis-space-center"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/332673","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=332673"}],"version-history":[{"count":9,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/332673\/revisions"}],"predecessor-version":[{"id":333117,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/332673\/revisions\/333117"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=332673"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=332673"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=332673"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}