{"id":32110,"date":"2024-04-30T05:31:56","date_gmt":"2024-04-29T19:31:56","guid":{"rendered":"https:\/\/www.rtands.com\/?p=54524"},"modified":"2024-04-30T05:31:56","modified_gmt":"2024-04-29T19:31:56","slug":"watch-rexy-one-of-two-tbms-for-the-eglinton-crosstown-west-extension-breaks-through-the-final-wall","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=32110","title":{"rendered":"WATCH: \u2018Rexy\u2019, One of Two TBMs for the Eglinton Crosstown West Extension, Breaks Through the Final Wall"},"content":{"rendered":"<p>TORONTO \u2013 One tunnel boring machine (TBM) excavating for the western underground segment of the Eglinton Crosstown West Extension has broken through the final wall.<\/p>\n<p>The post <a rel=\"nofollow\" href=\"https:\/\/www.rtands.com\/track-construction\/track-structure\/bridges-tunnels\/watch-rexy-one-of-two-tbms-for-the-eglinton-crosstown-west-extension-breaks-through-the-final-wall\/\">WATCH: \u2018Rexy\u2019, One of Two TBMs for the Eglinton Crosstown West Extension, Breaks Through the Final Wall<\/a> appeared first on <a rel=\"nofollow\" href=\"https:\/\/www.rtands.com\/\">Railway Track and Structures<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>TORONTO \u2013 One tunnel boring machine (TBM) excavating for the western underground segment of the Eglinton Crosstown West Extension has broken through the final wall.<br \/>\nThe post WATCH: \u2018Rexy\u2019, One of Two TBMs for the Eglinton Crosstown West Extension, Brea&#8230;<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[35,29,30,57,6921,523,49,51,58,33,4838],"tags":[],"class_list":["post-32110","post","type-post","status-publish","format-standard","hentry","category-breaking-news","category-bridge-retaining-walls-tunnels","category-bridges-tunnels","category-commuter-regional","category-eglinton-crosstown-west-extension","category-metrolinx","category-passenger","category-passenger-rail","category-track-construction","category-track-structure","category-tunnel-boring-machine-tbm"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/32110","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=32110"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/32110\/revisions"}],"predecessor-version":[{"id":32111,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/32110\/revisions\/32111"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=32110"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=32110"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=32110"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}