{"id":318315,"date":"2025-11-18T00:17:35","date_gmt":"2025-11-17T14:17:35","guid":{"rendered":"http:\/\/www.vibewire.com.au\/?guid=64de82745ef5cd0ba0e173e795b248e1"},"modified":"2025-11-18T00:17:35","modified_gmt":"2025-11-17T14:17:35","slug":"orr-authorises-new-platform-at-ynyswen-station","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=318315","title":{"rendered":"ORR authorises new platform at Ynyswen Station"},"content":{"rendered":"<p><span class=\"field field--name-title field--type-string field--label-hidden\">ORR authorises new platform at Ynyswen Station<\/span><br \/>\n<span class=\"field field--name-created field--type-created field--label-hidden\"><time datetime=\"2025-11-17T14:17:35+00:00\" title=\"Monday, 17 November, 2025 - 14:17\" class=\"datetime\">Mon, 17\/11\/2025 &#8211; 14:17<\/time><br \/>\n<\/span><br \/>\n<span class=\"orr-published-date\">17 November 2025<\/span><\/p>\n<div class=\"field field--name-field-standfirst field--type-string-long field--label-hidden field__item\">The Office of Rail and Road (ORR) has authorised significant upgrades to Ynyswen railway station in South Wales, which form part of the Core Valley Lines (CVL) transformation project. They will improve service capacity, accessibility, and deliver a more sustainable and efficient transport network for local communities.<\/div>\n<div class=\"field field--name-field-cover-image field--type-entity-reference field--label-visually_hidden\">\n<div class=\"field__label visually-hidden\">Cover Image<\/div>\n<div class=\"field__item\">\n<article class=\"media media--type-image media--view-mode-demo-cover\">\n<div class=\"field field--name-field-media-image field--type-image field--label-visually_hidden\">\n<div class=\"field__label visually-hidden\">Image<\/div>\n<div class=\"field__item\">  <img decoding=\"async\" loading=\"lazy\" src=\"https:\/\/www.orr.gov.uk\/sites\/default\/files\/styles\/demo_cover\/public\/2025-11\/TfW.jpg?h=0374b3b2&amp;itok=zLJq4NVy\" width=\"1082\" height=\"609\" alt=\"Transport for Wales train\" class=\"image-style-demo-cover\"><\/p>\n<\/div><\/div>\n<\/article>\n<\/div><\/div>\n<div class=\"clearfix text-formatted field field--name-body field--type-text-with-summary field--label-visually_hidden\">\n<div class=\"field__label visually-hidden\">Body<\/div>\n<div class=\"field__item\"><\/div>\n<\/p><\/div>\n<div class=\"field field--name-field-components field--type-entity-reference-revisions field--label-visually_hidden\">\n<div class=\"field__label visually-hidden\">Components<\/div>\n<div class=\"field__items\">\n<div class=\"field__item\">\n<div class=\"paragraph paragraph--type--text paragraph--view-mode--default\">\n<div class=\"clearfix text-formatted field field--name-field-text field--type-text-long field--label-hidden field__item\">\n<p>The upgrades include a new second platform which will support more train services.&nbsp; Also featured are a new waiting shelter, an emergency fire refuge, and further upgrades&nbsp; which will support extension of the existing platform in future.<\/p>\n<p>A new, accessible footbridge connects the existing and new platforms with steps and lift access, and the existing platform has been upgraded to provide modern platform edge tactile paving along its full length.<\/p>\n<p>ORR\u2019s authorisation is a key milestone in getting new, upgraded, or renewed infrastructure, such as at Ynyswen railway station, ready to open. It&nbsp;also&nbsp;confirms that standards on areas like health and safety, accessibility, environmental protection, reliability and availability have been met.&nbsp;<\/p>\n<p>ORR has worked&nbsp;closely&nbsp;with&nbsp;Transport for Wales and its contractors, and the wider project team&nbsp;through the authorisation process, ensuring that important checks and surveys were carried out.&nbsp;&nbsp;<\/p>\n<p><strong>Steve Fletcher, Deputy Director, Engineering and Asset Management at ORR, said:&nbsp;<\/strong><\/p>\n<\/div><\/div>\n<\/div>\n<div class=\"field__item\">\n<div class=\"styling-options--alignment--left pull-quote-size--big paragraph paragraph--type--pull-quote paragraph--view-mode--default\">\n<div class=\"pull-quote-container\">\n<div class=\"pull-quote-text\">\n<div class=\"clearfix text-formatted field field--name-field-text field--type-text-long field--label-hidden field__item\">\n<p>\u201cThis is an important step for improving rail connectivity in and around Ynyswen, and we look forward to seeing the upgrades open for passengers soon.&nbsp;<br \/>\u201cWe\u2019re pleased to have played our part in getting Ynyswen station ready to open. Our team worked closely with Transport for Wales to support them through the authorisation process, just as we do for new trains and infrastructure across the country.\u201d<\/p>\n<\/div><\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<div class=\"field__item\">\n<div class=\"paragraph paragraph--type--text paragraph--view-mode--default\">\n<div class=\"clearfix text-formatted field field--name-field-text field--type-text-long field--label-hidden field__item\">\n<p><strong>Notes to editor<\/strong><\/p>\n<ol>\n<li><a href=\"https:\/\/www.orr.gov.uk\/guidance-compliance\/rail\/health-safety\/laws\/interoperability\/authorisations\" >ORR authorises new and upgraded infrastructure<\/a>\u202fas part of its responsibility to authorise infrastructure and rolling stock that are new or have had a major upgrade or renewal.<em> <\/em><\/li>\n<li><a href=\"https:\/\/www.orr.gov.uk\/sites\/default\/files\/2025-11\/amey-rail-transport-for-wales-ynyswen-station-orr-authorisation-letter-2025-11-12.pdf\">Letter of authorisation<\/a><\/li>\n<\/ol>\n<\/div><\/div>\n<\/div><\/div>\n<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>ORR authorises new platform at Ynyswen Station<br \/>\nMon, 17\/11\/2025 &#8211; 14:17<\/p>\n<p>17 November 2025<\/p>\n<p>            The Office of Rail and Road (ORR) has authorised significant upgrades to Ynyswen railway station in South Wales, which form part of the Core Valley Li&#8230;<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[],"tags":[],"class_list":["post-318315","post","type-post","status-publish","format-standard","hentry"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/318315","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=318315"}],"version-history":[{"count":4,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/318315\/revisions"}],"predecessor-version":[{"id":318395,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/318315\/revisions\/318395"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=318315"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=318315"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=318315"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}