{"id":31475,"date":"2024-04-27T08:37:25","date_gmt":"2024-04-26T22:37:25","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=31475"},"modified":"2024-04-27T08:37:25","modified_gmt":"2024-04-26T22:37:25","slug":"melbournes-new-metro-tunnel-tests-high-capacity-signalling","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=31475","title":{"rendered":"Melbourne\u2019s new metro tunnel tests high-capacity signalling"},"content":{"rendered":"<p>METRO Trains Melbourne has successfully tested a High-Capacity Signalling system (HCS) in the new 9km Melbourne Metro Tunnel. The project is due to open in 2025, a year ahead of schedule.<\/p>\n<p>The CBTC system installed by the Rail Systems Alliance, a consortium of CPB Contractors, Alstom and Metro Trains Melbourne, will allow trains to run through the new tunnel at frequencies of up to every three minutes.<\/p>\n<p>Metro Trains ran 18 trains an hour between West Footscray and Hawksburn during tests, with some trains operating at intervals of two minutes. The HCS was successfully retrofitted on the existing Cranbourne and Pakenham suburban lines last autumn.<\/p>\n<p>New high-capacity metro trains (HCMT), built by the Evolution consortium of Downer, CRRC and Partners Group in Victoria, were used to test the signalling.<\/p>\n<p><em>For details of projects across the globe, subscribe to <a href=\"https:\/\/irjpro.com\/\" target=\"_blank\" rel=\"noopener\">IRJ Pro<\/a>.<\/em><\/p>\n<p>The post <a href=\"https:\/\/www.railjournal.com\/regions\/australia-nz\/melbournes-new-metro-tunnel-tests-high-capacity-signalling\/\">Melbourne\u2019s new metro tunnel tests high-capacity signalling<\/a> appeared first on <a href=\"https:\/\/www.railjournal.com\/\">International Railway Journal<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>METRO Trains Melbourne has successfully tested a High-Capacity Signalling system (HCS) in the new 9km Melbourne Metro Tunnel. The project is due to open in [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[47,5],"tags":[],"class_list":["post-31475","post","type-post","status-publish","format-standard","hentry","category-rail-news","category-transport"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"METRO Trains Melbourne has successfully tested a High-Capacity Signalling system (HCS) in the new 9km Melbourne Metro Tunnel. The project is due to open in 2025, a year ahead of schedule. The CBTC system installed by the Rail Systems Alliance, a consortium of CPB Contractors, Alstom and Metro Trains Melbourne, will allow trains to run\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=31475\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Melbourne\u2019s new metro tunnel tests high-capacity signalling - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"METRO Trains Melbourne has successfully tested a High-Capacity Signalling system (HCS) in the new 9km Melbourne Metro Tunnel. The project is due to open in 2025, a year ahead of schedule. The CBTC system installed by the Rail Systems Alliance, a consortium of CPB Contractors, Alstom and Metro Trains Melbourne, will allow trains to run\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=31475\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-04-26T22:37:25+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-04-26T22:37:25+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Melbourne\u2019s new metro tunnel tests high-capacity signalling - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"METRO Trains Melbourne has successfully tested a High-Capacity Signalling system (HCS) in the new 9km Melbourne Metro Tunnel. The project is due to open in 2025, a year ahead of schedule. The CBTC system installed by the Rail Systems Alliance, a consortium of CPB Contractors, Alstom and Metro Trains Melbourne, will allow trains to run\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=31475#blogposting\",\"name\":\"Melbourne\\u2019s new metro tunnel tests high-capacity signalling - VibeWire Magazine\",\"headline\":\"Melbourne\\u2019s new metro tunnel tests high-capacity signalling\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#articleImage\",\"width\":1028,\"height\":930},\"datePublished\":\"2024-04-27T08:37:25+10:00\",\"dateModified\":\"2024-04-27T08:37:25+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=31475#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=31475#webpage\"},\"articleSection\":\"Rail News, TRANSPORT\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=31475#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=5#listItem\",\"name\":\"TRANSPORT\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=5#listItem\",\"position\":2,\"name\":\"TRANSPORT\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=5\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=31475#listItem\",\"name\":\"Melbourne\\u2019s new metro tunnel tests high-capacity signalling\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=31475#listItem\",\"position\":3,\"name\":\"Melbourne\\u2019s new metro tunnel tests high-capacity signalling\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=5#listItem\",\"name\":\"TRANSPORT\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=31475\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=31475\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=31475#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=31475\",\"name\":\"Melbourne\\u2019s new metro tunnel tests high-capacity signalling - VibeWire Magazine\",\"description\":\"METRO Trains Melbourne has successfully tested a High-Capacity Signalling system (HCS) in the new 9km Melbourne Metro Tunnel. The project is due to open in 2025, a year ahead of schedule. The CBTC system installed by the Rail Systems Alliance, a consortium of CPB Contractors, Alstom and Metro Trains Melbourne, will allow trains to run\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=31475#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"datePublished\":\"2024-04-27T08:37:25+10:00\",\"dateModified\":\"2024-04-27T08:37:25+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Melbourne\u2019s new metro tunnel tests high-capacity signalling - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Melbourne\u2019s new metro tunnel tests high-capacity signalling - VibeWire Magazine","description":"METRO Trains Melbourne has successfully tested a High-Capacity Signalling system (HCS) in the new 9km Melbourne Metro Tunnel. The project is due to open in 2025, a year ahead of schedule. The CBTC system installed by the Rail Systems Alliance, a consortium of CPB Contractors, Alstom and Metro Trains Melbourne, will allow trains to run","canonical_url":"https:\/\/www.vibewire.com.au\/?p=31475","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=31475#blogposting","name":"Melbourne\u2019s new metro tunnel tests high-capacity signalling - VibeWire Magazine","headline":"Melbourne\u2019s new metro tunnel tests high-capacity signalling","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/#articleImage","width":1028,"height":930},"datePublished":"2024-04-27T08:37:25+10:00","dateModified":"2024-04-27T08:37:25+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=31475#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=31475#webpage"},"articleSection":"Rail News, TRANSPORT"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=31475#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=5#listItem","name":"TRANSPORT"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=5#listItem","position":2,"name":"TRANSPORT","item":"https:\/\/www.vibewire.com.au\/?cat=5","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=31475#listItem","name":"Melbourne\u2019s new metro tunnel tests high-capacity signalling"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=31475#listItem","position":3,"name":"Melbourne\u2019s new metro tunnel tests high-capacity signalling","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=5#listItem","name":"TRANSPORT"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=31475\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=31475\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=31475#webpage","url":"https:\/\/www.vibewire.com.au\/?p=31475","name":"Melbourne\u2019s new metro tunnel tests high-capacity signalling - VibeWire Magazine","description":"METRO Trains Melbourne has successfully tested a High-Capacity Signalling system (HCS) in the new 9km Melbourne Metro Tunnel. The project is due to open in 2025, a year ahead of schedule. The CBTC system installed by the Rail Systems Alliance, a consortium of CPB Contractors, Alstom and Metro Trains Melbourne, will allow trains to run","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=31475#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"datePublished":"2024-04-27T08:37:25+10:00","dateModified":"2024-04-27T08:37:25+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Melbourne\u2019s new metro tunnel tests high-capacity signalling - VibeWire Magazine","og:description":"METRO Trains Melbourne has successfully tested a High-Capacity Signalling system (HCS) in the new 9km Melbourne Metro Tunnel. The project is due to open in 2025, a year ahead of schedule. The CBTC system installed by the Rail Systems Alliance, a consortium of CPB Contractors, Alstom and Metro Trains Melbourne, will allow trains to run","og:url":"https:\/\/www.vibewire.com.au\/?p=31475","article:published_time":"2024-04-26T22:37:25+00:00","article:modified_time":"2024-04-26T22:37:25+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Melbourne\u2019s new metro tunnel tests high-capacity signalling - VibeWire Magazine","twitter:description":"METRO Trains Melbourne has successfully tested a High-Capacity Signalling system (HCS) in the new 9km Melbourne Metro Tunnel. The project is due to open in 2025, a year ahead of schedule. The CBTC system installed by the Rail Systems Alliance, a consortium of CPB Contractors, Alstom and Metro Trains Melbourne, will allow trains to run","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"31475","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-06-02 17:55:53","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-04-27 08:39:28","updated":"2026-06-02 17:55:53"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=5\" title=\"TRANSPORT\">TRANSPORT<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tMelbourne\u2019s new metro tunnel tests high-capacity signalling\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"TRANSPORT","link":"https:\/\/www.vibewire.com.au\/?cat=5"},{"label":"Melbourne\u2019s new metro tunnel tests high-capacity signalling","link":"https:\/\/www.vibewire.com.au\/?p=31475"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/31475","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=31475"}],"version-history":[{"count":0,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/31475\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=31475"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=31475"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=31475"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}