{"id":313052,"date":"2025-11-07T21:39:47","date_gmt":"2025-11-07T11:39:47","guid":{"rendered":"https:\/\/railuk.com\/?p=185136"},"modified":"2025-11-07T21:39:47","modified_gmt":"2025-11-07T11:39:47","slug":"manchester-piccadilly-set-for-once-in-a-generation-upgrade","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=313052","title":{"rendered":"Manchester Piccadilly set for once-in-a-generation upgrade"},"content":{"rendered":"<p><a href=\"https:\/\/railuk.com\/rail-news\/manchester-piccadilly-set-for-once-in-a-generation-upgrade\/\" title=\"Manchester Piccadilly set for once-in-a-generation upgrade\" rel=\"nofollow\"><img loading=\"lazy\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/07112742\/Manchester-Piccadilly-June-2022-Network-Rail-1-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\" style=\"display: block; margin-bottom: 5px; clear:both;max-width: 100%;\" link_thumbnail=\"1\" decoding=\"async\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/07112742\/Manchester-Piccadilly-June-2022-Network-Rail-1-485x360.jpg 485w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/07112742\/Manchester-Piccadilly-June-2022-Network-Rail-1-80x60.jpg 80w\" sizes=\"auto, (max-width: 485px) 100vw, 485px\" \/><\/a><\/p>\n<p>Passengers using the North West\u2019s busiest railway station are being given advance notice of once-in-a-generation track and signalling upgrades taking place in February next year.<\/p>\n<p>Network Rail will invest \u00a37.9 million to improve tracks, points and signalling systems on the southern approach to Manchester Piccadilly station which date back to the 1980s.<\/p>\n<p>Teams will replace 11 sets of points, renew 9,000 metre of cabling, upgrade timber sleepers with modern concrete equivalents and bring lineside equipment bang up to date across six lines to improve future journeys for passengers and freight.<\/p>\n<p>Investment in this critical stretch of track has been long awaited, as any issues with the ageing infrastructure can disrupt all trains running in and out of Manchester.<\/p>\n<div class=\"wp-block-image\">\n<figure class=\"alignright size-large is-resized\"><a href=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/07112956\/Ardwick-corridor-drone-image_cropped-1-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"577\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/07112956\/Ardwick-corridor-drone-image_cropped-1-1024x577.jpg\" alt=\"\" class=\"wp-image-185144\" style=\"width:416px;height:auto\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/07112956\/Ardwick-corridor-drone-image_cropped-1-1024x577.jpg 1024w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/07112956\/Ardwick-corridor-drone-image_cropped-1-300x169.jpg 300w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/07112956\/Ardwick-corridor-drone-image_cropped-1-768x433.jpg 768w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/07112956\/Ardwick-corridor-drone-image_cropped-1-1536x865.jpg 1536w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/07112956\/Ardwick-corridor-drone-image_cropped-1-2048x1154.jpg 2048w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/07112956\/Ardwick-corridor-drone-image_cropped-1-745x420.jpg 745w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/07112956\/Ardwick-corridor-drone-image_cropped-1-696x392.jpg 696w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/07112956\/Ardwick-corridor-drone-image_cropped-1-1068x602.jpg 1068w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/07112956\/Ardwick-corridor-drone-image_cropped-1-1920x1082.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Ardwick Corridor drone image &#8211; Network Rail<\/figcaption><\/figure>\n<\/div>\n<p>Once the work is completed it will provide a huge boost to reliability for passengers.<\/p>\n<p>The vast scale of the work spanning all main lines means no trains from the south and east of the city will run into Manchester Piccadilly for nine days over February half term (Saturday 14 &#8211; Sunday 22).<\/p>\n<p>Some trains from across the north will also be impacted during the essential upgrades as well as direct connections to Manchester Airport station.<\/p>\n<p>Services normally running to and from Manchester Piccadilly will terminate at other stations, including Stockport.<\/p>\n<p>While the train shed (platforms 1-12) will close, Manchester Piccadilly\u2019s concourse will remain open to the public. There will be a limited service westbound from platforms 13 and 14. Staff will be on hand to coordinate bus and Metrolink Bee Network journeys.<\/p>\n<p>Julien Dehornoy, Network Rail\u2019s North West &amp; Central deputy regional managing director, said: \u201cWe\u2019re investing \u00a37.9 million in renewing the Piccadilly corridor, a stretch of track critical to the journeys of around 400,000\u202ftrains into Manchester every year.<\/p>\n<p>&#8220;This work is going to significantly reduce disruption for the many passengers who regularly use this route. Once the job is done, we will have a better, more reliable railway.<\/p>\n<p>\u201cThe major overhaul over six railway lines can only take place during a full railway closure and we are working closely with train operators, TfGM and Manchester City Council on alternative travel plans to keep people on the move, the full details on which will be published in mid-November.&#8221;<\/p>\n<p>Network Rail \u2013 along with train operators, Transport for Greater Manchester (TfGM) and Manchester City Council \u2013 have developed detailed alternative travel plans to keep people on the move over the nine-day closure.<\/p>\n<p>These will be released in the coming months so anyone planning to travel over February half-term will know exactly what they can expect from their journey.<\/p>\n<div class=\"wp-block-image\">\n<figure class=\"alignleft size-large is-resized\"><a href=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/07112933\/Main-concourse-Manchester-Piccadilly-June-2022-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/07112933\/Main-concourse-Manchester-Piccadilly-June-2022-1024x576.jpg\" alt=\"\" class=\"wp-image-185143\" style=\"width:382px;height:auto\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/07112933\/Main-concourse-Manchester-Piccadilly-June-2022-1024x576.jpg 1024w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/07112933\/Main-concourse-Manchester-Piccadilly-June-2022-300x169.jpg 300w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/07112933\/Main-concourse-Manchester-Piccadilly-June-2022-768x432.jpg 768w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/07112933\/Main-concourse-Manchester-Piccadilly-June-2022-1536x864.jpg 1536w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/07112933\/Main-concourse-Manchester-Piccadilly-June-2022-2048x1152.jpg 2048w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/07112933\/Main-concourse-Manchester-Piccadilly-June-2022-747x420.jpg 747w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/07112933\/Main-concourse-Manchester-Piccadilly-June-2022-696x391.jpg 696w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/07112933\/Main-concourse-Manchester-Piccadilly-June-2022-1068x601.jpg 1068w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/07112933\/Main-concourse-Manchester-Piccadilly-June-2022-1920x1080.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Main concourse Manchester Piccadilly &#8211; Network Rail<\/figcaption><\/figure>\n<\/div>\n<p>In Greater Manchester, the Bee Network will once again be used to keep passengers on the move, as seen during the recent successful Greek Street blockade, as Network Rail works with partners like TfGM to continue to support an integrated public transport system in the region.<\/p>\n<p>Simon Elliott, network director Rail at TfGM, said: \u201cThis investment in Manchester Piccadilly\u2019s rail infrastructure is a crucial step forward in delivering a reliable and resilient railway for passengers, freight and supporting the city-region\u2019s continued economic growth.<\/p>\n<p>\u201cWhile unfortunately there will be some short-term disruption due to the nature of the works, through the Bee Network we\u2019re committed to working with rail industry colleagues to ensure people can still move easily across Greater Manchester while these essential upgrades take place.\u201d<\/p>\n<p>A spokesperson for train operators said: \u201cThis work will improve the reliability of trains running into the region\u2019s busiest station.<\/p>\n<p>\u201cIn the coming months, passengers can expect more detailed information about their specific journeys and any potential disruption.<\/p>\n<p>\u201cWe would urge people to check with their operator or with National Rail Enquiries to plan their travel in advance.\u201d<\/p>\n<p>For updates about the project, visit the webpage: <a href=\"https:\/\/www.networkrail.co.uk\/our-work\/our-routes\/north-west\/piccadilly-corridor-renewal\/\">Piccadilly corridor renewal &#8211; Network Rail<\/a>.<\/p>\n<p>Image credit: Network Rail<\/p>\n","protected":false},"excerpt":{"rendered":"<p><a href=\"https:\/\/railuk.com\/rail-news\/manchester-piccadilly-set-for-once-in-a-generation-upgrade\/\" title=\"Manchester Piccadilly set for once-in-a-generation upgrade\" rel=\"nofollow\"><img loading=\"lazy\" decoding=\"async\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/07112742\/Manchester-Piccadilly-June-2022-Network-Rail-1-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\"><\/a>Passengers using the North West\u2019s busiest railway station are being given advance notice of once-in-a-generation track and signalling upgrades taking place in February next year. Network Rail will invest \u00a37.9 million to improve tracks, points and signalling systems on the southern approach to Manchester Piccadilly station which date back to the 1980s. Teams will replace [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[343,16015,47,16092,16016,85],"tags":[],"class_list":["post-313052","post","type-post","status-publish","format-standard","hentry","category-infrastructure","category-permanent-way","category-rail-news","category-stations","category-train-operating-companies","category-uk"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/313052","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=313052"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/313052\/revisions"}],"predecessor-version":[{"id":314517,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/313052\/revisions\/314517"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=313052"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=313052"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=313052"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}