{"id":312621,"date":"2025-11-06T21:28:04","date_gmt":"2025-11-06T11:28:04","guid":{"rendered":"https:\/\/railuk.com\/?p=185062"},"modified":"2025-11-06T21:28:04","modified_gmt":"2025-11-06T11:28:04","slug":"alstom-invests-millions-upgrading-crewe-works-overhaul-facilities","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=312621","title":{"rendered":"Alstom invests millions upgrading Crewe Works overhaul facilities"},"content":{"rendered":"<p><a href=\"https:\/\/railuk.com\/company-news\/alstom-invests-millions-upgrading-crewe-works-overhaul-facilities\/\" title=\"Alstom invests millions upgrading Crewe Works overhaul facilities\" rel=\"nofollow\"><img loading=\"lazy\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/06111841\/Crewe-Works-Aerial-Alstom-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\" style=\"display: block; margin-bottom: 5px; clear:both;max-width: 100%;\" link_thumbnail=\"1\" decoding=\"async\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/06111841\/Crewe-Works-Aerial-Alstom-485x360.jpg 485w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/06111841\/Crewe-Works-Aerial-Alstom-80x60.jpg 80w\" sizes=\"auto, (max-width: 485px) 100vw, 485px\" \/><\/a><\/p>\n<p>Alstom is celebrating after opening a new train component overhaul and repair facility inside its Crewe Works.<\/p>\n<p>Alongside a state-of-the-art area for refurbishing heating, ventilation and air conditioning (HVAC) units, Alstom has also developed a suite of new offices as part of a multi-million pound investment for the future of the Cheshire town&#8217;s historic site.<\/p>\n<p>An HVAC unit controls a train\u2019s air temperature, humidity and quality. These systems work by drawing in air, heating or cooling it, and then circulating it back into a carriage, while also managing ventilation and filtration. Alstom\u2019s newly-installed equipment in Crewe enables trains\u2019 HVAC units to be expertly inspected before they are regassed and brazed.<\/p>\n<div class=\"wp-block-image\">\n<figure class=\"alignright size-large is-resized\"><a href=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/06112540\/HVAC-Area-1-Credit-Richard-Gennis.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/06112540\/HVAC-Area-1-Credit-Richard-Gennis-1024x683.jpg\" alt=\"\" class=\"wp-image-185068\" style=\"width:399px;height:auto\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/06112540\/HVAC-Area-1-Credit-Richard-Gennis-1024x683.jpg 1024w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/06112540\/HVAC-Area-1-Credit-Richard-Gennis-300x200.jpg 300w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/06112540\/HVAC-Area-1-Credit-Richard-Gennis-768x512.jpg 768w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/06112540\/HVAC-Area-1-Credit-Richard-Gennis-1536x1024.jpg 1536w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/06112540\/HVAC-Area-1-Credit-Richard-Gennis-2048x1365.jpg 2048w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/06112540\/HVAC-Area-1-Credit-Richard-Gennis-630x420.jpg 630w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/06112540\/HVAC-Area-1-Credit-Richard-Gennis-696x464.jpg 696w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/06112540\/HVAC-Area-1-Credit-Richard-Gennis-1068x712.jpg 1068w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/06112540\/HVAC-Area-1-Credit-Richard-Gennis-1920x1280.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n<\/div>\n<p>As part of a full overhaul and repair, operatives change out refrigerant, and worn parts are replaced to restore systems to optimal performance and extend their lifespan. Additionally, Crewe\u2019s bespoke test cells enable climatic chamber examinations, as they replicate various onboard conditions the systems experience in passenger service.&nbsp;<\/p>\n<p>Prior to the new facility opening, Crewe Works was able to process around 16 HVAC units per week. This has now doubled to 35 and will reach around 50 by January when the HVAC Area is expanded further to help meet demand. Seventy new skilled roles have already been created to operate the facility, which will rise to around 110 in the New Year.<\/p>\n<p>Operatives are currently overhauling HVAC units on Class 334, Class 375, Class 377, Class 387 and Class 390 trains, with work on Class 222 and Class 378 trains following in 2026.<\/p>\n<p>\u201cAs the UK\u2019s leading supplier of train services, we\u2019re proud to have invested more than \u00a32 million in new technology and offices at Crewe Works. This expansion not only futureproofs our operations but also enables us to better serve customers across the country with enhanced capacity and capability,\u201d said Steve Harvey, services director UK and Ireland at Alstom.<\/p>\n<p>He added: \u201cCrewe has played a pivotal role in Britain\u2019s rail history and this latest development will ensure it remains at the heart of train maintenance in the UK. We\u2019re excited about the opportunities this creates \u2013 it\u2019s a landmark investment in both technology and talent.\u201d<\/p>\n<p>Originally opened by the Grand Junction Railway in 1843 to manufacture steam locomotives, Crewe Works was instrumental in the development of the town, with its population growing from 500 in 1841 to more than 40,000 by 1900.<\/p>\n<p>Along with the new HVAC Area, Crewe Works is today home to Alstom\u2019s UK Centre of Excellence for Bogie, Wheel and Traction Motor Overhaul, overhauling over 20,000 bogies during the past ten years for the UK rail market. Looking ahead, the bogies \u2013 which house a train\u2019s wheel sets \u2013 for the High Speed Two (HS2) rolling stock will be made by Alstom at their Crewe facility. This marks the first time in almost two decades that these have been manufactured in the UK.<\/p>\n<div class=\"wp-block-image\">\n<figure class=\"alignleft size-large is-resized\"><a href=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/06112605\/General-Office-Credit-Richard-Gennis.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/06112605\/General-Office-Credit-Richard-Gennis-1024x683.jpg\" alt=\"\" class=\"wp-image-185069\" style=\"width:404px;height:auto\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/06112605\/General-Office-Credit-Richard-Gennis-1024x683.jpg 1024w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/06112605\/General-Office-Credit-Richard-Gennis-300x200.jpg 300w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/06112605\/General-Office-Credit-Richard-Gennis-768x512.jpg 768w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/06112605\/General-Office-Credit-Richard-Gennis-1536x1024.jpg 1536w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/06112605\/General-Office-Credit-Richard-Gennis-2048x1365.jpg 2048w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/06112605\/General-Office-Credit-Richard-Gennis-630x420.jpg 630w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/06112605\/General-Office-Credit-Richard-Gennis-696x464.jpg 696w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/06112605\/General-Office-Credit-Richard-Gennis-1068x712.jpg 1068w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/06112605\/General-Office-Credit-Richard-Gennis-1920x1280.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Crewe Works, Cheshire, UK (28 October 2025)<\/figcaption><\/figure>\n<\/div>\n<p>Meanwhile, Alstom has partnered with Woodhouse to deliver a transformative refurbishment of their General Office space within the Crewe Works site. Woodhouse developed a progressive design for the 20,000 sq ft space that has enabled the office area to adapt and support Alstom\u2019s growth plans for the site.<\/p>\n<p>The design credits the building\u2019s industrial heritage, stripping it back to its former steam locomotive manufacturing and repair facility by exposing the striking steel structure. A new mezzanine level has been installed, housing a suite of modern meeting rooms, while the ground floor features a spacious open-plan office, additional meeting spaces and a welcoming reception area designed to enhance the visitor experience. The refurbishment also includes a vibrant breakout and teapoint area, encouraging collaboration and connection amongst staff.<\/p>\n<p>\u201cIt has been an absolute pleasure to work alongside the team at Alstom to delivery this inspiring, future-ready workspace that reflects the company\u2019s values and vision,\u201d said Ralph Dummer, project director at Woodhouse.<\/p>\n<p>Delivered through close collaboration with Alstom\u2019s team, the project successfully unites displaced teams (as a result of the HVAC Area expansion), integrates sustainable design principles and enhances the digital experience for the more than 300 employees based at Crewe Works.<\/p>\n<p>Crewe Works will remain in the limelight as the facility is set to star in an episode of Channel 5\u2019s popular documentary series, &#8216;Britain&#8217;s Most Scenic Counties: Cheshire&#8217;. Joining Mark Derbyshire for a shift, viewers will get to see the work involved to successfully carry out a bogie overhaul and return it to passenger service within the space of a week. The episode featuring Crewe Works will be broadcast in the UK at 21:00 on Friday 7 November before being available on-demand.<\/p>\n<p>Image credit: Richard Gennis<\/p>\n","protected":false},"excerpt":{"rendered":"<p><a href=\"https:\/\/railuk.com\/company-news\/alstom-invests-millions-upgrading-crewe-works-overhaul-facilities\/\" title=\"Alstom invests millions upgrading Crewe Works overhaul facilities\" rel=\"nofollow\"><img loading=\"lazy\" decoding=\"async\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/11\/06111841\/Crewe-Works-Aerial-Alstom-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\"><\/a>Alstom is celebrating after opening a new train component overhaul and repair facility inside its Crewe Works. Alongside a state-of-the-art area for refurbishing heating, ventilation and air conditioning (HVAC) units, Alstom has also developed a suite of new offices as part of a multi-million pound investment for the future of the Cheshire town\u2019s historic site. [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[8202,16017,47,16317,85],"tags":[],"class_list":["post-312621","post","type-post","status-publish","format-standard","hentry","category-company-news","category-industry-news","category-rail-news","category-rolling-stock-and-components","category-uk"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/312621","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=312621"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/312621\/revisions"}],"predecessor-version":[{"id":312622,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/312621\/revisions\/312622"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=312621"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=312621"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=312621"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}