{"id":31127,"date":"2024-04-26T09:44:24","date_gmt":"2024-04-25T23:44:24","guid":{"rendered":"https:\/\/www.railexpress.com.au\/?p=116056"},"modified":"2024-04-26T09:44:24","modified_gmt":"2024-04-25T23:44:24","slug":"76th-level-crossing-removed-one-year-ahead-of-schedule","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=31127","title":{"rendered":"76th Level Crossing Removed One Year Ahead Of Schedule"},"content":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/04\/breakout83_xl.jpeg\" alt=\"\" style=\"float:right; margin:0 0 10px 10px;\"><figcaption>Image\/Victoria&#8217;s Big Build<\/figcaption><\/figure>\n<p class=\"text-align-justify\"><strong><span lang=\"EN-US\">The <a href=\"https:\/\/www.vic.gov.au\/\">Victorian Government<\/a> has removed a dangerous level crossing at Brunt Road in Beaconsfield \u2013 making it the 76th level crossing removed in Melbourne since 2015.<\/span><\/strong><span id=\"more-116056\"><\/span><\/p>\n<p class=\"text-align-justify\"><span lang=\"EN-US\">Minister for Transport Infrastructure Danny Pearson announced work to connect Brunt Road with a new road bridge has been completed \u2013 giving drivers, cyclists and pedestrians a safer crossing over the Pakenham Line.\u00a0<\/span><\/p>\n<p><span lang=\"EN-US\">\u201cRemoving the Brunt Road, Beaconsfield level crossing a year ahead of schedule is a win for all commuters \u2013 safety will be improved, and drivers will no longer get stuck at the boom gates,&#8221; he said.<\/span><\/p>\n<p class=\"text-align-justify\"><span lang=\"EN-US\">The new road bridge will drastically improve the journeys of the 8,400 drivers passing through each day and give locals a new cycling and walking connection to schools, shops and services on either side of the rail line.\u00a0<\/span><\/p>\n<p class=\"text-align-justify\"><span lang=\"EN-US\">Following a construction blitz, crews laid more than 2,400 tonnes of asphalt along the 570-metre bridge, measuring more than 10 metres high \u2013 and approximately 100 trees and 50,000 plants, shrubs and grasses are set to be planted along the new road bridge over the coming months.\u00a0<\/span><\/p>\n<p class=\"text-align-justify\"><span lang=\"EN-US\">With traffic now flowing over the new Brunt Road bridge, works will begin to remove the congested level crossing at Station Street, Officer on Saturday 18 May \u2013 making the Pakenham Line one step closer to becoming level crossing-free by 2025.<\/span><\/p>\n<p class=\"text-align-justify\"><span lang=\"EN-US\">Construction is also progressing on the nearby <a href=\"https:\/\/www.railexpress.com.au\/designs-at-beaconsfield-level-crossing-removal-revealed\/\">Station Street<\/a>, Beaconsfield level crossing removal, which will be gone for good next year.\u00a0<\/span><\/p>\n<p class=\"text-align-justify\"><span lang=\"EN-US\">Removing 76 level crossings has saved close to 50 hours of boom gate down time during the morning peak every day and allowed for additional train services across Melbourne.<\/span><\/p>\n<p class=\"text-align-justify\"><span lang=\"EN-US\">Works are continuing at pace across Melbourne to remove another 10 level crossings before the end of the year, with 110 to go by 2030. \u00a0<\/span><\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/76th-level-crossing-removed-one-year-ahead-of-schedule\/\">76th Level Crossing Removed One Year Ahead Of Schedule<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Victorian Government has removed a dangerous level crossing at Brunt Road in Beaconsfield \u2013 making it the 76th level \u2026 <\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/76th-level-crossing-removed-one-year-ahead-of-schedule\/\">76th Level Crossing Removed One Year Ahead Of Schedule<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[165,879,163,906],"tags":[8],"class_list":["post-31127","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-infrastructure","category-level-crossing-removal","category-rail-industry-news-australia-new-zealand","category-state","tag-victoria"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/31127","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=31127"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/31127\/revisions"}],"predecessor-version":[{"id":31130,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/31127\/revisions\/31130"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=31127"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=31127"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=31127"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}