{"id":30272,"date":"2024-04-23T05:37:30","date_gmt":"2024-04-22T19:37:30","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=30272"},"modified":"2024-04-23T05:37:30","modified_gmt":"2024-04-22T19:37:30","slug":"ghent-bruges-track-quadrupling-project-reaches-key-milestone","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=30272","title":{"rendered":"Ghent &#8211; Bruges track-quadrupling project reaches key milestone"},"content":{"rendered":"<p>BELGIAN infrastructure manager Infrabel has reached a key milestone in its \u20ac600m project to widen Line 50D between Ghent and Bruges from two to four tracks, with the completion of a third track on the 16km Bellem &#8211; Oostkamp section.<\/p>\n<p>The new track will enter regular service at the start of summer 2024 timetable in early June.<\/p>\n<p>Line 50D between Ghent and Bruges is the busiest on the Belgian national network, according to Infrabel, and is used by over 250 freight and passenger trains a day. It serves resorts on the Belgian coast, and carries freight to the ports of Ostend and Zeebrugge.<\/p>\n<p>Four tracks have been in service between Ghent and Landegem since 2019, and are due to completed over the 38km between Ghent and Bruges in December 2027. Renewal of the existing tracks will follow, enabling full four-track operation to be introduced in December 2029.<\/p>\n<p>The two new tracks for freight and local passenger services are being laid outside the existing double track, which will be used by Belgian National Railways (SNCB) inter-city (IC) passenger services. Other elements of the project include modification of the overhead electrification equipment and resignalling with ETCS.<\/p>\n<p>Infrabel says that all seven stations between Ghent and Bruges line have been modernised, including rebuilding platforms to provide a higher boarding height and facilitate level access.<\/p>\n<p>All 12 level crossings have already been replaced by three new overbridges, four tunnels beneath the railway for cyclists and pedestrians and one new road tunnel. Existing bridges have been modified to accommodate the two additional tracks.<\/p>\n<p>The project is funded by the Belgian federal government and the European Union (EU)<\/p>\n<p>\u201cThe construction of the third and fourth track is the largest railway construction project in Flanders and it is an important catalyst for mobility, modal shift and the economy,\u201d says Infrabel CEO, Mr. Beno\u00eet Gilson.<\/p>\n<p><em>For detailed data on European rail infrastructure projects, subscribe to <a href=\"https:\/\/irjpro.com\/\">IRJ Pro<\/a>.<\/em><\/p>\n<p>The post <a href=\"https:\/\/www.railjournal.com\/infrastructure\/ghent-bruges-track-quadrupling-project-reaches-key-milestone\/\">Ghent &#8211; Bruges track-quadrupling project reaches key milestone<\/a> appeared first on <a href=\"https:\/\/www.railjournal.com\/\">International Railway Journal<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>BELGIAN infrastructure manager Infrabel has reached a key milestone in its \u20ac600m project to widen Line 50D between Ghent and Bruges from two to four [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[47,5],"tags":[],"class_list":["post-30272","post","type-post","status-publish","format-standard","hentry","category-rail-news","category-transport"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"BELGIAN infrastructure manager Infrabel has reached a key milestone in its \u20ac600m project to widen Line 50D between Ghent and Bruges from two to four tracks, with the completion of a third track on the 16km Bellem - Oostkamp section. The new track will enter regular service at the start of summer 2024 timetable in\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=30272\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Ghent \u2013 Bruges track-quadrupling project reaches key milestone - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"BELGIAN infrastructure manager Infrabel has reached a key milestone in its \u20ac600m project to widen Line 50D between Ghent and Bruges from two to four tracks, with the completion of a third track on the 16km Bellem - Oostkamp section. The new track will enter regular service at the start of summer 2024 timetable in\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=30272\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-04-22T19:37:30+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-04-22T19:37:30+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Ghent \u2013 Bruges track-quadrupling project reaches key milestone - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"BELGIAN infrastructure manager Infrabel has reached a key milestone in its \u20ac600m project to widen Line 50D between Ghent and Bruges from two to four tracks, with the completion of a third track on the 16km Bellem - Oostkamp section. The new track will enter regular service at the start of summer 2024 timetable in\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=30272#blogposting\",\"name\":\"Ghent \\u2013 Bruges track-quadrupling project reaches key milestone - VibeWire Magazine\",\"headline\":\"Ghent &#8211; Bruges track-quadrupling project reaches key milestone\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#articleImage\",\"width\":1028,\"height\":930},\"datePublished\":\"2024-04-23T05:37:30+10:00\",\"dateModified\":\"2024-04-23T05:37:30+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=30272#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=30272#webpage\"},\"articleSection\":\"Rail News, TRANSPORT\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=30272#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=5#listItem\",\"name\":\"TRANSPORT\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=5#listItem\",\"position\":2,\"name\":\"TRANSPORT\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=5\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=30272#listItem\",\"name\":\"Ghent &#8211; Bruges track-quadrupling project reaches key milestone\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=30272#listItem\",\"position\":3,\"name\":\"Ghent &#8211; Bruges track-quadrupling project reaches key milestone\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=5#listItem\",\"name\":\"TRANSPORT\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=30272\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=30272\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=30272#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=30272\",\"name\":\"Ghent \\u2013 Bruges track-quadrupling project reaches key milestone - VibeWire Magazine\",\"description\":\"BELGIAN infrastructure manager Infrabel has reached a key milestone in its \\u20ac600m project to widen Line 50D between Ghent and Bruges from two to four tracks, with the completion of a third track on the 16km Bellem - Oostkamp section. The new track will enter regular service at the start of summer 2024 timetable in\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=30272#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"datePublished\":\"2024-04-23T05:37:30+10:00\",\"dateModified\":\"2024-04-23T05:37:30+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Ghent \u2013 Bruges track-quadrupling project reaches key milestone - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Ghent \u2013 Bruges track-quadrupling project reaches key milestone - VibeWire Magazine","description":"BELGIAN infrastructure manager Infrabel has reached a key milestone in its \u20ac600m project to widen Line 50D between Ghent and Bruges from two to four tracks, with the completion of a third track on the 16km Bellem - Oostkamp section. The new track will enter regular service at the start of summer 2024 timetable in","canonical_url":"https:\/\/www.vibewire.com.au\/?p=30272","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=30272#blogposting","name":"Ghent \u2013 Bruges track-quadrupling project reaches key milestone - VibeWire Magazine","headline":"Ghent &#8211; Bruges track-quadrupling project reaches key milestone","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/#articleImage","width":1028,"height":930},"datePublished":"2024-04-23T05:37:30+10:00","dateModified":"2024-04-23T05:37:30+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=30272#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=30272#webpage"},"articleSection":"Rail News, TRANSPORT"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=30272#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=5#listItem","name":"TRANSPORT"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=5#listItem","position":2,"name":"TRANSPORT","item":"https:\/\/www.vibewire.com.au\/?cat=5","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=30272#listItem","name":"Ghent &#8211; Bruges track-quadrupling project reaches key milestone"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=30272#listItem","position":3,"name":"Ghent &#8211; Bruges track-quadrupling project reaches key milestone","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=5#listItem","name":"TRANSPORT"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=30272\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=30272\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=30272#webpage","url":"https:\/\/www.vibewire.com.au\/?p=30272","name":"Ghent \u2013 Bruges track-quadrupling project reaches key milestone - VibeWire Magazine","description":"BELGIAN infrastructure manager Infrabel has reached a key milestone in its \u20ac600m project to widen Line 50D between Ghent and Bruges from two to four tracks, with the completion of a third track on the 16km Bellem - Oostkamp section. The new track will enter regular service at the start of summer 2024 timetable in","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=30272#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"datePublished":"2024-04-23T05:37:30+10:00","dateModified":"2024-04-23T05:37:30+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Ghent \u2013 Bruges track-quadrupling project reaches key milestone - VibeWire Magazine","og:description":"BELGIAN infrastructure manager Infrabel has reached a key milestone in its \u20ac600m project to widen Line 50D between Ghent and Bruges from two to four tracks, with the completion of a third track on the 16km Bellem - Oostkamp section. The new track will enter regular service at the start of summer 2024 timetable in","og:url":"https:\/\/www.vibewire.com.au\/?p=30272","article:published_time":"2024-04-22T19:37:30+00:00","article:modified_time":"2024-04-22T19:37:30+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Ghent \u2013 Bruges track-quadrupling project reaches key milestone - VibeWire Magazine","twitter:description":"BELGIAN infrastructure manager Infrabel has reached a key milestone in its \u20ac600m project to widen Line 50D between Ghent and Bruges from two to four tracks, with the completion of a third track on the 16km Bellem - Oostkamp section. The new track will enter regular service at the start of summer 2024 timetable in","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"30272","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-05-31 23:05:17","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-04-23 05:43:38","updated":"2026-05-31 23:05:17"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=5\" title=\"TRANSPORT\">TRANSPORT<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tGhent \u2013 Bruges track-quadrupling project reaches key milestone\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"TRANSPORT","link":"https:\/\/www.vibewire.com.au\/?cat=5"},{"label":"Ghent &#8211; Bruges track-quadrupling project reaches key milestone","link":"https:\/\/www.vibewire.com.au\/?p=30272"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/30272","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=30272"}],"version-history":[{"count":0,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/30272\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=30272"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=30272"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=30272"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}