{"id":302622,"date":"2025-10-16T23:11:00","date_gmt":"2025-10-16T13:11:00","guid":{"rendered":"https:\/\/railuk.com\/?p=184021"},"modified":"2025-10-16T23:11:00","modified_gmt":"2025-10-16T13:11:00","slug":"boost-for-long-term-reliability-on-london-norwich-line-and-harwich-branch","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=302622","title":{"rendered":"Boost for long-term reliability on London \u2013 Norwich line and Harwich branch"},"content":{"rendered":"<p>Network Rail has completed vital bridge works near Manningtree and replaced key overhead line infrastructure to help keep trains running safely and reliably for decades to come.<\/p>\n<p>Over four weekends in September, engineers replaced a total of 66 old wheel timbers on the River Stour and Cattawade Creek bridges which carry the main line just outside Manningtree station. Wheel timbers are used to hold the rails in place across certain types of bridge and they gradually deteriorate over time. When wheel timbers are in a poor condition, there is a higher risk of track faults that could cause delays to passengers.<\/p>\n<p>At the same time, engineers swapped out old overhead line parts for the latest and most reliable versions between Colchester and Manningtree. Trains on the busy Great Eastern main line rely on overhead lines for their power, so it\u2019s essential that the equipment is kept in the best possible condition.<\/p>\n<p>The same type of overhead line work took place on the Harwich branch line, along with the replacement of 17 overhead line support masts, which were decades-old and starting to lean to one side.<\/p>\n<p>On Sunday 28 September, Network Rail also replaced a faulty section of track near Gidea Park station, which would otherwise have led to a disruptive speed restriction or even an unplanned and prolonged line closure.<\/p>\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/16164141\/Left-one-of-the-old-masts-that-was-starting-to-lean.-Right-one-of-the-new-masts-in-place.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/16164141\/Left-one-of-the-old-masts-that-was-starting-to-lean.-Right-one-of-the-new-masts-in-place-1024x576.jpg\" alt=\"\" class=\"wp-image-184028\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/16164141\/Left-one-of-the-old-masts-that-was-starting-to-lean.-Right-one-of-the-new-masts-in-place-1024x576.jpg 1024w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/16164141\/Left-one-of-the-old-masts-that-was-starting-to-lean.-Right-one-of-the-new-masts-in-place-300x169.jpg 300w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/16164141\/Left-one-of-the-old-masts-that-was-starting-to-lean.-Right-one-of-the-new-masts-in-place-768x432.jpg 768w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/16164141\/Left-one-of-the-old-masts-that-was-starting-to-lean.-Right-one-of-the-new-masts-in-place-1536x864.jpg 1536w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/16164141\/Left-one-of-the-old-masts-that-was-starting-to-lean.-Right-one-of-the-new-masts-in-place-747x420.jpg 747w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/16164141\/Left-one-of-the-old-masts-that-was-starting-to-lean.-Right-one-of-the-new-masts-in-place-696x392.jpg 696w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/16164141\/Left-one-of-the-old-masts-that-was-starting-to-lean.-Right-one-of-the-new-masts-in-place-1068x601.jpg 1068w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/16164141\/Left-one-of-the-old-masts-that-was-starting-to-lean.-Right-one-of-the-new-masts-in-place.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n<p><strong>Simon Milburn, infrastructure director for Network Rail Anglia, said:<\/strong>&nbsp;\u201cThese four September weekends gave us the time to complete a series of vital jobs that we simply couldn\u2019t have got done if trains were running. Thank you to passengers for bearing with us while we made the very most of our track access to boost reliability, including on 28 September when we had to carry out additional works near Gidea Park at short notice.\u201d<\/p>\n<p><strong>Martin Beable, managing director for Greater Anglia, said:<\/strong>&nbsp;\u201cThese works were essential to keep the railway running and make it fit for the future. We would like to thank customers for their patience and understanding while Network Rail completed the work.\u201d<\/p>\n<p>Image credit: Network Rail<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Network Rail has completed vital bridge works near Manningtree and replaced key overhead line infrastructure to help keep trains running safely and reliably for decades to come. Over four weekends in September, engineers replaced a total of 66 old wheel timbers on the River Stour and Cattawade Creek bridges which carry the main line just [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[16013,343,16015,47,85],"tags":[],"class_list":["post-302622","post","type-post","status-publish","format-standard","hentry","category-general-interest","category-infrastructure","category-permanent-way","category-rail-news","category-uk"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.10 - aioseo.com -->\n\t<meta name=\"description\" content=\"Network Rail has completed vital bridge works near Manningtree and replaced key overhead line infrastructure to help keep trains running safely and reliably for decades to come. Over four weekends in September, engineers replaced a total of 66 old wheel timbers on the River Stour and Cattawade Creek bridges which carry the main line just [\u2026]\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=302622\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.10\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Boost for long-term reliability on London \u2013 Norwich line and Harwich branch - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Network Rail has completed vital bridge works near Manningtree and replaced key overhead line infrastructure to help keep trains running safely and reliably for decades to come. Over four weekends in September, engineers replaced a total of 66 old wheel timbers on the River Stour and Cattawade Creek bridges which carry the main line just [\u2026]\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=302622\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2025-10-16T13:11:00+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2025-10-16T13:11:00+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Boost for long-term reliability on London \u2013 Norwich line and Harwich branch - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Network Rail has completed vital bridge works near Manningtree and replaced key overhead line infrastructure to help keep trains running safely and reliably for decades to come. Over four weekends in September, engineers replaced a total of 66 old wheel timbers on the River Stour and Cattawade Creek bridges which carry the main line just [\u2026]\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=302622#blogposting\",\"name\":\"Boost for long-term reliability on London \\u2013 Norwich line and Harwich branch - VibeWire Magazine\",\"headline\":\"Boost for long-term reliability on London \\u2013 Norwich line and Harwich branch\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/cdn.railuk.co\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/16164141\\\/Left-one-of-the-old-masts-that-was-starting-to-lean.-Right-one-of-the-new-masts-in-place-1024x576.jpg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=302622\\\/#articleImage\"},\"datePublished\":\"2025-10-16T23:11:00+10:00\",\"dateModified\":\"2025-10-16T23:11:00+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=302622#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=302622#webpage\"},\"articleSection\":\"General Interest, Infrastructure, Permanent Way, Rail News, UK\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=302622#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=302622#listItem\",\"name\":\"Boost for long-term reliability on London \\u2013 Norwich line and Harwich branch\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=302622#listItem\",\"position\":3,\"name\":\"Boost for long-term reliability on London \\u2013 Norwich line and Harwich branch\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=302622\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=302622\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=302622#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=302622#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=302622\",\"name\":\"Boost for long-term reliability on London \\u2013 Norwich line and Harwich branch - VibeWire Magazine\",\"description\":\"Network Rail has completed vital bridge works near Manningtree and replaced key overhead line infrastructure to help keep trains running safely and reliably for decades to come. Over four weekends in September, engineers replaced a total of 66 old wheel timbers on the River Stour and Cattawade Creek bridges which carry the main line just [\\u2026]\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=302622#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"datePublished\":\"2025-10-16T23:11:00+10:00\",\"dateModified\":\"2025-10-16T23:11:00+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Boost for long-term reliability on London \u2013 Norwich line and Harwich branch - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Boost for long-term reliability on London \u2013 Norwich line and Harwich branch - VibeWire Magazine","description":"Network Rail has completed vital bridge works near Manningtree and replaced key overhead line infrastructure to help keep trains running safely and reliably for decades to come. Over four weekends in September, engineers replaced a total of 66 old wheel timbers on the River Stour and Cattawade Creek bridges which carry the main line just [\u2026]","canonical_url":"https:\/\/www.vibewire.com.au\/?p=302622","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=302622#blogposting","name":"Boost for long-term reliability on London \u2013 Norwich line and Harwich branch - VibeWire Magazine","headline":"Boost for long-term reliability on London \u2013 Norwich line and Harwich branch","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/16164141\/Left-one-of-the-old-masts-that-was-starting-to-lean.-Right-one-of-the-new-masts-in-place-1024x576.jpg","@id":"https:\/\/www.vibewire.com.au\/?p=302622\/#articleImage"},"datePublished":"2025-10-16T23:11:00+10:00","dateModified":"2025-10-16T23:11:00+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=302622#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=302622#webpage"},"articleSection":"General Interest, Infrastructure, Permanent Way, Rail News, UK"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=302622#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=302622#listItem","name":"Boost for long-term reliability on London \u2013 Norwich line and Harwich branch"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=302622#listItem","position":3,"name":"Boost for long-term reliability on London \u2013 Norwich line and Harwich branch","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=302622\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=302622\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=302622#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=302622#webpage","url":"https:\/\/www.vibewire.com.au\/?p=302622","name":"Boost for long-term reliability on London \u2013 Norwich line and Harwich branch - VibeWire Magazine","description":"Network Rail has completed vital bridge works near Manningtree and replaced key overhead line infrastructure to help keep trains running safely and reliably for decades to come. Over four weekends in September, engineers replaced a total of 66 old wheel timbers on the River Stour and Cattawade Creek bridges which carry the main line just [\u2026]","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=302622#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"datePublished":"2025-10-16T23:11:00+10:00","dateModified":"2025-10-16T23:11:00+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Boost for long-term reliability on London \u2013 Norwich line and Harwich branch - VibeWire Magazine","og:description":"Network Rail has completed vital bridge works near Manningtree and replaced key overhead line infrastructure to help keep trains running safely and reliably for decades to come. Over four weekends in September, engineers replaced a total of 66 old wheel timbers on the River Stour and Cattawade Creek bridges which carry the main line just [\u2026]","og:url":"https:\/\/www.vibewire.com.au\/?p=302622","article:published_time":"2025-10-16T13:11:00+00:00","article:modified_time":"2025-10-16T13:11:00+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Boost for long-term reliability on London \u2013 Norwich line and Harwich branch - VibeWire Magazine","twitter:description":"Network Rail has completed vital bridge works near Manningtree and replaced key overhead line infrastructure to help keep trains running safely and reliably for decades to come. Over four weekends in September, engineers replaced a total of 66 old wheel timbers on the River Stour and Cattawade Creek bridges which carry the main line just [\u2026]","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"302622","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2025-10-16 16:17:36","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2025-10-16 16:17:06","updated":"2025-10-16 16:17:36"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tBoost for long-term reliability on London \u2013 Norwich line and Harwich branch\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"Boost for long-term reliability on London \u2013 Norwich line and Harwich branch","link":"https:\/\/www.vibewire.com.au\/?p=302622"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/302622","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=302622"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/302622\/revisions"}],"predecessor-version":[{"id":302623,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/302622\/revisions\/302623"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=302622"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=302622"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=302622"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}