{"id":30205,"date":"2024-01-24T13:14:54","date_gmt":"2024-01-24T03:14:54","guid":{"rendered":"https:\/\/infrastructuremagazine.com.au\/?p=50973"},"modified":"2024-01-24T13:14:54","modified_gmt":"2024-01-24T03:14:54","slug":"river-torrens-to-darlington-project-advances","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=30205","title":{"rendered":"River Torrens to Darlington project advances"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">The River Torrens to Darlington project has hit an important milestone with the completion of its first construction project.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The Selgar Avenue link road has been completed, connecting motorists to southern Adelaide\u2019s Tonsley Innovation District and southbound lanes of South Road.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The new road allows vehicles to make a right turn onto South Road from Selgar Avenue via MAB Circuit and Tonsley Boulevard.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">It also provides another entry point into the Tonsley area from South Road, in addition to the existing Tonsley Boulevard intersection. The new link road is essential for improving local area access and connectivity with the Torrens to Darlington motorway and South Road corridor in the Clovelly Park area.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Federal Minister for Boothby, Louise Miller-Frost, said, \u201cCompleting this new link road will connect local businesses and motorists to the Tonsley Innovation District and the southbound lanes of South Road.\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The $2.8 million main construction of the Selgar Avenue link road was delivered by local civil engineering company Bardavcol.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">South Australian Minister for Infrastructure and Transport, Tom Koutsantonis, said he was very excited to announce the <\/span><span style=\"font-weight: 400;\">first intersection and road upgrade as part of the $850 million broader network upgrades package is now complete.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cThis package is delivering additional network and amenity upgrades along and around the 10.5km Torrens to Darlington Project to ensure the proper functioning of the motorway and wider road network both during and after construction.\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Other early works across the Torrens to Darlington Project are progressing well, including the completion of nearby Tonsley East Substation, which will supply electricity to the tunnel-boring machines (TBMs) and then to the two parallel four-kilometre-long southern tunnels once they are completed in 2030.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The facility, which was built by South Australia Power Networks and its subsidiary Enerven, is located on the site of the former Mitsubishi building fronting South Road and will constitute part of the project\u2019s Southern Laydown Area.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The Australian and South Australian governments are delivering the $15.4 billion Torrens to Darlington Project on a 50:50 basis, which will complete the non-stop, 78km north-south corridor between Gawler and Old Noarlunga.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cThe Australian Government is pleased to be partnering with the South Australian Government to enhance Adelaide\u2019s southern access links to the Torrens to Darlington motorway project,\u201d Ms Miller-Frost said.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The 10.5km Torrens to Darlington Project will provide motorists with a nine-minute journey from West Hindmarsh to Darlington.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cThis is the first taste of the improved road network connectivity being delivered as part of the biggest infrastructure project in South Australian history,\u201d Mr Koutsantonis said.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The River Torrens to Darlington project has hit an important milestone with the completion of its first construction project. The [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[471,1291,163,8204,8224,8203],"tags":[],"class_list":["post-30205","post","type-post","status-publish","format-standard","hentry","category-news","category-projects","category-rail-industry-news-australia-new-zealand","category-roads","category-sa","category-spotlight"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.9 - aioseo.com -->\n\t<meta name=\"description\" content=\"The River Torrens to Darlington project has hit an important milestone with the completion of its first construction project. The [\u2026]\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=30205\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.9\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"River Torrens to Darlington project advances - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"The River Torrens to Darlington project has hit an important milestone with the completion of its first construction project. The [\u2026]\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=30205\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-01-24T03:14:54+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-01-24T03:14:54+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"River Torrens to Darlington project advances - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The River Torrens to Darlington project has hit an important milestone with the completion of its first construction project. The [\u2026]\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=30205#blogposting\",\"name\":\"River Torrens to Darlington project advances - VibeWire Magazine\",\"headline\":\"River Torrens to Darlington project advances\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#articleImage\",\"width\":1028,\"height\":930},\"datePublished\":\"2024-01-24T13:14:54+10:00\",\"dateModified\":\"2024-01-24T13:14:54+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=30205#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=30205#webpage\"},\"articleSection\":\"News, Projects, Rail industry news (Australia, New Zealand), Roads, SA, Spotlight\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=30205#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"name\":\"Rail industry news (Australia, New Zealand)\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"position\":2,\"name\":\"Rail industry news (Australia, New Zealand)\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=30205#listItem\",\"name\":\"River Torrens to Darlington project advances\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=30205#listItem\",\"position\":3,\"name\":\"River Torrens to Darlington project advances\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"name\":\"Rail industry news (Australia, New Zealand)\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=30205\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=30205\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=30205#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=30205#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=30205\",\"name\":\"River Torrens to Darlington project advances - VibeWire Magazine\",\"description\":\"The River Torrens to Darlington project has hit an important milestone with the completion of its first construction project. The [\\u2026]\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=30205#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"datePublished\":\"2024-01-24T13:14:54+10:00\",\"dateModified\":\"2024-01-24T13:14:54+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>River Torrens to Darlington project advances - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"River Torrens to Darlington project advances - VibeWire Magazine","description":"The River Torrens to Darlington project has hit an important milestone with the completion of its first construction project. The [\u2026]","canonical_url":"https:\/\/www.vibewire.com.au\/?p=30205","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=30205#blogposting","name":"River Torrens to Darlington project advances - VibeWire Magazine","headline":"River Torrens to Darlington project advances","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/#articleImage","width":1028,"height":930},"datePublished":"2024-01-24T13:14:54+10:00","dateModified":"2024-01-24T13:14:54+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=30205#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=30205#webpage"},"articleSection":"News, Projects, Rail industry news (Australia, New Zealand), Roads, SA, Spotlight"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=30205#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","name":"Rail industry news (Australia, New Zealand)"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","position":2,"name":"Rail industry news (Australia, New Zealand)","item":"https:\/\/www.vibewire.com.au\/?cat=163","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=30205#listItem","name":"River Torrens to Darlington project advances"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=30205#listItem","position":3,"name":"River Torrens to Darlington project advances","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","name":"Rail industry news (Australia, New Zealand)"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=30205\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=30205\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=30205#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=30205#webpage","url":"https:\/\/www.vibewire.com.au\/?p=30205","name":"River Torrens to Darlington project advances - VibeWire Magazine","description":"The River Torrens to Darlington project has hit an important milestone with the completion of its first construction project. The [\u2026]","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=30205#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"datePublished":"2024-01-24T13:14:54+10:00","dateModified":"2024-01-24T13:14:54+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"River Torrens to Darlington project advances - VibeWire Magazine","og:description":"The River Torrens to Darlington project has hit an important milestone with the completion of its first construction project. The [\u2026]","og:url":"https:\/\/www.vibewire.com.au\/?p=30205","article:published_time":"2024-01-24T03:14:54+00:00","article:modified_time":"2024-01-24T03:14:54+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"River Torrens to Darlington project advances - VibeWire Magazine","twitter:description":"The River Torrens to Darlington project has hit an important milestone with the completion of its first construction project. The [\u2026]","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"30205","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-05-17 08:57:11","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-04-23 02:40:36","updated":"2026-05-17 08:57:11"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=163\" title=\"Rail industry news (Australia, New Zealand)\">Rail industry news (Australia, New Zealand)<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tRiver Torrens to Darlington project advances\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail industry news (Australia, New Zealand)","link":"https:\/\/www.vibewire.com.au\/?cat=163"},{"label":"River Torrens to Darlington project advances","link":"https:\/\/www.vibewire.com.au\/?p=30205"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/30205","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=30205"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/30205\/revisions"}],"predecessor-version":[{"id":30206,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/30205\/revisions\/30206"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=30205"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=30205"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=30205"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}