{"id":30161,"date":"2024-02-09T13:54:03","date_gmt":"2024-02-09T03:54:03","guid":{"rendered":"https:\/\/infrastructuremagazine.com.au\/?p=51121"},"modified":"2024-02-09T13:54:03","modified_gmt":"2024-02-09T03:54:03","slug":"new-report-to-accelerate-transport-infrastructure-projects","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=30161","title":{"rendered":"New report to accelerate transport infrastructure projects"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">A new report released by Austroads has outlined practical measures to accelerate the development of transport infrastructure projects and programs of up to $500 million.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The report emphasises the identification and mitigation of potential issues at each stage of the project delivery lifecycle.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Austroads Manager for the Transport Infrastructure program, Ross Guppy, said that many projects need expedited delivery because of external factors like environmental disasters or changes, financial stimulus and challenges, and government priorities.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cTo accelerate the delivery of these projects, road authorities may adopt more novel approaches to planning, project management, design, procurement or construction,\u201d Mr Guppy said.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The report is designed to help authorities manage these new approaches and is structured in two parts:<\/span><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Research Results and Best Practices<\/b><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">This section details the outcomes of the research into project and program acceleration, emphasising the significance of sharing best practices<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Practitioner Guidelines and Case Studies<\/b><span style=\"font-weight: 400;\"><br \/>\n<\/span><span style=\"font-weight: 400;\">Providing practical insights, this section follows the project\/program delivery lifecycle, addressing potential issues at each stage and emphasising the delicate balance between project timing, quality and costs<\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">\u201cThe project provides a robust foundation for accelerating projects, ensuring a balance between speed, quality and cost-effectiveness.\u201d <\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A new report released by Austroads has outlined practical measures to accelerate the development of transport infrastructure projects and programs [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[471,8214,163,8204,8203,5],"tags":[],"class_list":["post-30161","post","type-post","status-publish","format-standard","hentry","category-news","category-planning","category-rail-industry-news-australia-new-zealand","category-roads","category-spotlight","category-transport"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/30161","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=30161"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/30161\/revisions"}],"predecessor-version":[{"id":38002,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/30161\/revisions\/38002"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=30161"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=30161"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=30161"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}