{"id":297839,"date":"2025-10-08T01:33:59","date_gmt":"2025-10-07T15:33:59","guid":{"rendered":"https:\/\/railuk.com\/?p=183463"},"modified":"2025-10-08T01:33:59","modified_gmt":"2025-10-07T15:33:59","slug":"gtr-and-siemens-mobility-update-entire-717-fleet-to-updated-version-of-etcs","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=297839","title":{"rendered":"GTR and Siemens Mobility update entire 717 fleet to updated version of ETCS"},"content":{"rendered":"<p><a href=\"https:\/\/railuk.com\/signalling-and-telecoms\/gtr-and-siemens-mobility-update-entire-717-fleet-to-updated-version-of-etcs\/\" title=\"GTR and Siemens Mobility update entire 717 fleet to updated version of ETCS\" rel=\"nofollow\"><img loading=\"lazy\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07162942\/Upgrading-Class-717-ETCS-software-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\" style=\"display: block; margin-bottom: 5px; clear:both;max-width: 100%;\" link_thumbnail=\"1\" decoding=\"async\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07162942\/Upgrading-Class-717-ETCS-software-485x360.jpg 485w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07162942\/Upgrading-Class-717-ETCS-software-80x60.jpg 80w\" sizes=\"auto, (max-width: 485px) 100vw, 485px\" \/><\/a><\/p>\n<p>Govia Thameslink Railway (GTR), with Siemens Mobility, has updated its entire fleet of 25 Class 717 Great Northern trains to run in passenger service using an updated specification of the in-cab digital signalling software, European Train Control System (ETCS).<\/p>\n<p>The trains now operate on the Northern City Line between Finsbury Park and Moorgate in London using ETCS Baseline 3, Release 2 (also referred to as version 3.6.0).<\/p>\n<p>This specification of ETCS allows more flexibility for services to operate in a high traffic area by connecting the train to the trackside via GPRS instead of GSM-R (see editor\u2019s notes). It will be used by all train operators on the East Coast Mainline, as part of the government-funded&nbsp;<a href=\"https:\/\/eastcoastdigitalprogramme.co.uk\/home\"  rel=\"noreferrer noopener\">East Coast Digital Programme<\/a>&nbsp;(ECDP), where it will be needed to accommodate the route\u2019s high service frequency.<\/p>\n<p><strong>Govia Thameslink Railway\u2019s Senior Programme Delivery Manager Aaron Meakin said<\/strong>: \u201cOnce again, innovations delivered on the Northern City Line are forging the way for the introduction of in-cab digital signalling on the wider UK network.<\/p>\n<p>\u201cBy upgrading all our trains to operate with this updated version of the European Train Control System, we\u2019ve proved the concept ready for its roll-out to other train fleets.<\/p>\n<p>\u201cDigital signalling along the main line, promises huge benefits to passengers, with a more reliable, more sustainable railway, lower emissions, and even better safety for passengers.\u201d<\/p>\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07162936\/Moorgate-station-All-trains-under-digital-control-2.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"614\" data-id=\"183465\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07162936\/Moorgate-station-All-trains-under-digital-control-2-1024x614.jpg\" alt=\"\" class=\"wp-image-183465\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07162936\/Moorgate-station-All-trains-under-digital-control-2-1024x614.jpg 1024w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07162936\/Moorgate-station-All-trains-under-digital-control-2-300x180.jpg 300w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07162936\/Moorgate-station-All-trains-under-digital-control-2-768x461.jpg 768w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07162936\/Moorgate-station-All-trains-under-digital-control-2-1536x921.jpg 1536w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07162936\/Moorgate-station-All-trains-under-digital-control-2-2048x1228.jpg 2048w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07162936\/Moorgate-station-All-trains-under-digital-control-2-700x420.jpg 700w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07162936\/Moorgate-station-All-trains-under-digital-control-2-696x417.jpg 696w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07162936\/Moorgate-station-All-trains-under-digital-control-2-1068x640.jpg 1068w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07162936\/Moorgate-station-All-trains-under-digital-control-2-1920x1151.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07162938\/First-717-in-pass-service-in-3.6.0-Finsbury-Park-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"777\" data-id=\"183464\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07162938\/First-717-in-pass-service-in-3.6.0-Finsbury-Park-1024x777.jpg\" alt=\"\" class=\"wp-image-183464\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07162938\/First-717-in-pass-service-in-3.6.0-Finsbury-Park-1024x777.jpg 1024w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07162938\/First-717-in-pass-service-in-3.6.0-Finsbury-Park-300x228.jpg 300w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07162938\/First-717-in-pass-service-in-3.6.0-Finsbury-Park-768x583.jpg 768w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07162938\/First-717-in-pass-service-in-3.6.0-Finsbury-Park-1536x1166.jpg 1536w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07162938\/First-717-in-pass-service-in-3.6.0-Finsbury-Park-2048x1554.jpg 2048w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07162938\/First-717-in-pass-service-in-3.6.0-Finsbury-Park-553x420.jpg 553w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07162938\/First-717-in-pass-service-in-3.6.0-Finsbury-Park-80x60.jpg 80w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07162938\/First-717-in-pass-service-in-3.6.0-Finsbury-Park-696x528.jpg 696w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07162938\/First-717-in-pass-service-in-3.6.0-Finsbury-Park-1068x811.jpg 1068w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07162938\/First-717-in-pass-service-in-3.6.0-Finsbury-Park-1920x1457.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n<\/figure>\n<p><strong>Richard Cooper, Infrastructure Lead and ECDP Project Director, Siemens Mobility said:<\/strong>&nbsp;\u201cThe successful upgrade of the Siemens-built Class 717 fleet on the Northern City Line to the new ETCS specification marks a major milestone in our mission to transform rail travel through innovative technology.<\/p>\n<p>\u201cWorking closely with GTR and Network Rail, we are proud to be delivering a more reliable, connected, and higher-capacity railway for passengers travelling between Moorgate and Finsbury Park.<\/p>\n<p>\u201cThis achievement proves that an ETCS no-signals commuter railway unlocks a multitude of benefits on one of the UK\u2019s most demanding urban corridors, and we plan to apply these lessons and improvements to the wider East Coast Main Line.\u201d<\/p>\n<p><strong>Jonathan Daniels, Network Rail\u2019s ECDP Integration Lead, said:&nbsp;<\/strong>\u201cIn less than three months the entire fleet of GTR Class 717s has been upgraded to the new baseline level of ETCS that will be used for digitally signalled services on the East Coast Main Line. The excellent collaboration we had on the Northern City Line has continued into this project, and more fleets will now be upgraded ready for ETCS 3.6.0 operation.\u201d<\/p>\n<p>Image credit: GTR<\/p>\n","protected":false},"excerpt":{"rendered":"<p><a href=\"https:\/\/railuk.com\/signalling-and-telecoms\/gtr-and-siemens-mobility-update-entire-717-fleet-to-updated-version-of-etcs\/\" title=\"GTR and Siemens Mobility update entire 717 fleet to updated version of ETCS\" rel=\"nofollow\"><img loading=\"lazy\" decoding=\"async\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07162942\/Upgrading-Class-717-ETCS-software-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\"><\/a>Govia Thameslink Railway (GTR), with Siemens Mobility, has updated its entire fleet of 25 Class 717 Great Northern trains to run in passenger service using an updated specification of the in-cab digital signalling software, European Train Control System (ETCS). The trains now operate on the Northern City Line between Finsbury Park and Moorgate in London [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[11323,16013,47,180,16115,48,85],"tags":[],"class_list":["post-297839","post","type-post","status-publish","format-standard","hentry","category-electrification","category-general-interest","category-rail-news","category-rolling-stock","category-signalling-and-telecoms","category-technology","category-uk"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/297839","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=297839"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/297839\/revisions"}],"predecessor-version":[{"id":298250,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/297839\/revisions\/298250"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=297839"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=297839"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=297839"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}