{"id":297824,"date":"2025-10-08T01:14:00","date_gmt":"2025-10-07T15:14:00","guid":{"rendered":"https:\/\/railuk.com\/?p=183430"},"modified":"2025-10-08T01:14:00","modified_gmt":"2025-10-07T15:14:00","slug":"knorr-bremse-keeps-c2c-electrostar-fleet-running-smoothly-with-major-door-overhaul","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=297824","title":{"rendered":"Knorr-Bremse keeps c2c Electrostar fleet running smoothly with major door overhaul"},"content":{"rendered":"<p><a href=\"https:\/\/railuk.com\/rolling-stock\/knorr-bremse-keeps-c2c-electrostar-fleet-running-smoothly-with-major-door-overhaul\/\" title=\"Knorr-Bremse keeps c2c Electrostar fleet running smoothly with major door overhaul\" rel=\"nofollow\"><img loading=\"lazy\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07160852\/Image-1-Class-357-1-485x360.jpeg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\" style=\"display: block; margin-bottom: 5px; clear:both;max-width: 100%;\" link_thumbnail=\"1\" decoding=\"async\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07160852\/Image-1-Class-357-1-485x360.jpeg 485w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07160852\/Image-1-Class-357-1-80x60.jpeg 80w\" sizes=\"auto, (max-width: 485px) 100vw, 485px\" \/><\/a><\/p>\n<p>Knorr-Bremse Rail Systems has successfully completed a significant interim door overhaul for the c2c Class 357 \u2018Electrostar\u2019 fleet, securing the long-term reliability and availability of the trains that serve thousands of passengers across London and Essex every day.<\/p>\n<p>As the Electrostar fleet\u2019s door systems reached a critical stage in their maintenance lifecycle, a comprehensive overhaul became essential to ensure ongoing safety and reliability. To carry out this complex programme without disrupting passenger services, the fleet\u2019s maintainer, Alstom, turned to Knorr-Bremse \u2013 a trusted partner of more than 25 years with proven expertise in rail vehicle systems.<\/p>\n<p>The project, delivered at Alstom\u2019s East Ham Depot, covered the entire fleet of 74 Class 357 Electrostar trains, totalling 1,184 passenger doors. Using original equipment components from Knorr-Bremse\u2019s IFE subsidiary, a team of five on-site technicians carried out a complete overhaul of worn components and implemented a crucial cam modification, bringing all doors up to the latest Electrostar standard.<\/p>\n<p>Despite initial engineering challenges encountered, the Knorr-Bremse team streamlined its processes and subsequently achieved the delivery of one train per week, maintaining an impressive 96.3 percent on-time delivery record.<\/p>\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07160809\/Image-2-Class-357JPG.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"183435\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07160809\/Image-2-Class-357JPG-1024x768.jpeg\" alt=\"\" class=\"wp-image-183435\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07160809\/Image-2-Class-357JPG-1024x768.jpeg 1024w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07160809\/Image-2-Class-357JPG-300x225.jpeg 300w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07160809\/Image-2-Class-357JPG-768x576.jpeg 768w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07160809\/Image-2-Class-357JPG-560x420.jpeg 560w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07160809\/Image-2-Class-357JPG-80x60.jpeg 80w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07160809\/Image-2-Class-357JPG-696x522.jpeg 696w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07160809\/Image-2-Class-357JPG-1068x801.jpeg 1068w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07160809\/Image-2-Class-357JPG.jpeg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Photo credit: Knorr-Bremse<\/figcaption><\/figure>\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07160809\/Image-3-c2c-Class-357-1.jpeg\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"867\" data-id=\"183436\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07160809\/Image-3-c2c-Class-357-1-1024x867.jpeg\" alt=\"\" class=\"wp-image-183436\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07160809\/Image-3-c2c-Class-357-1-1024x867.jpeg 1024w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07160809\/Image-3-c2c-Class-357-1-300x254.jpeg 300w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07160809\/Image-3-c2c-Class-357-1-768x650.jpeg 768w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07160809\/Image-3-c2c-Class-357-1-496x420.jpeg 496w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07160809\/Image-3-c2c-Class-357-1-696x589.jpeg 696w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07160809\/Image-3-c2c-Class-357-1-1068x904.jpeg 1068w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07160809\/Image-3-c2c-Class-357-1.jpeg 1134w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption class=\"wp-element-caption\">Photo credit: Alstom<\/figcaption><\/figure>\n<\/figure>\n<p>Richard Campbell, Services Project Manager at Knorr-Bremse, who oversaw the programme, said:&nbsp;<em>\u201cThis project was a significant challenge, both in scale and complexity, but through the commitment of our on-site team and the strong collaboration with Alstom we achieved an excellent outcome.&nbsp;<\/em><\/p>\n<p><em>\u201cOverhauling nearly 1,200 doors to the latest standard while keeping the trains in daily passenger service is a great accomplishment. It underlines Knorr-Bremse\u2019s ability to deliver reliable, high-quality aftermarket solutions that make a real difference to our customers and, ultimately, to passengers.\u201d<\/em><\/p>\n<p>The contract with Knorr-Bremse involved 74 four-car units, initially built at Alstom\u2019s Derby Litchurch Lane Works between 1999 and 2002, and currently leased from Angel Trains and Porterbrook.&nbsp;&nbsp;<\/p>\n<p>Ian Kerr, General Manager East Ham at Alstom, said:&nbsp;<em>\u201cEnsuring the reliability of our Derby-built c2c Electrostar fleet is vital to delivering the safe and dependable service that passengers expect every day. By working closely with Knorr-Bremse, we were able to complete a significant maintenance milestone, strengthening the long-term performance and resilience of the fleet.<\/em><\/p>\n<p><em>\u201cKnorr-Bremse\u2019s technical expertise and on-site support were invaluable in helping us achieve this outcome, and we are very pleased with the quality and efficiency of the project.\u201d<\/em><em><\/em><\/p>\n<p>Lead image credit: Knorr-Bremse<\/p>\n","protected":false},"excerpt":{"rendered":"<p><a href=\"https:\/\/railuk.com\/rolling-stock\/knorr-bremse-keeps-c2c-electrostar-fleet-running-smoothly-with-major-door-overhaul\/\" title=\"Knorr-Bremse keeps c2c Electrostar fleet running smoothly with major door overhaul\" rel=\"nofollow\"><img loading=\"lazy\" decoding=\"async\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07160852\/Image-1-Class-357-1-485x360.jpeg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\"><\/a>Knorr-Bremse Rail Systems has successfully completed a significant interim door overhaul for the c2c Class 357 \u2018Electrostar\u2019 fleet, securing the long-term reliability and availability of the trains that serve thousands of passengers across London and Essex every day. As the Electrostar fleet\u2019s door systems reached a critical stage in their maintenance lifecycle, a comprehensive overhaul [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[16013,16017,47,180,16016,85],"tags":[],"class_list":["post-297824","post","type-post","status-publish","format-standard","hentry","category-general-interest","category-industry-news","category-rail-news","category-rolling-stock","category-train-operating-companies","category-uk"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.10 - aioseo.com -->\n\t<meta name=\"description\" content=\"Knorr-Bremse Rail Systems has successfully completed a significant interim door overhaul for the c2c Class 357 \u2018Electrostar\u2019 fleet, securing the long-term reliability and availability of the trains that serve thousands of passengers across London and Essex every day. As the Electrostar fleet\u2019s door systems reached a critical stage in their maintenance lifecycle, a comprehensive overhaul [\u2026]\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=297824\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.10\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Knorr-Bremse keeps c2c Electrostar fleet running smoothly with major door overhaul - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Knorr-Bremse Rail Systems has successfully completed a significant interim door overhaul for the c2c Class 357 \u2018Electrostar\u2019 fleet, securing the long-term reliability and availability of the trains that serve thousands of passengers across London and Essex every day. As the Electrostar fleet\u2019s door systems reached a critical stage in their maintenance lifecycle, a comprehensive overhaul [\u2026]\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=297824\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2025-10-07T15:14:00+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2025-10-07T15:14:00+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Knorr-Bremse keeps c2c Electrostar fleet running smoothly with major door overhaul - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Knorr-Bremse Rail Systems has successfully completed a significant interim door overhaul for the c2c Class 357 \u2018Electrostar\u2019 fleet, securing the long-term reliability and availability of the trains that serve thousands of passengers across London and Essex every day. As the Electrostar fleet\u2019s door systems reached a critical stage in their maintenance lifecycle, a comprehensive overhaul [\u2026]\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=297824#blogposting\",\"name\":\"Knorr-Bremse keeps c2c Electrostar fleet running smoothly with major door overhaul - VibeWire Magazine\",\"headline\":\"Knorr-Bremse keeps c2c Electrostar fleet running smoothly with major door overhaul\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/cdn.railuk.co\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/07160852\\\/Image-1-Class-357-1-485x360.jpeg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=297824\\\/#articleImage\"},\"datePublished\":\"2025-10-08T01:14:00+10:00\",\"dateModified\":\"2025-10-08T01:14:00+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=297824#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=297824#webpage\"},\"articleSection\":\"General Interest, Industry News, Rail News, Rolling Stock, Train Operating Companies, UK\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=297824#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=297824#listItem\",\"name\":\"Knorr-Bremse keeps c2c Electrostar fleet running smoothly with major door overhaul\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=297824#listItem\",\"position\":3,\"name\":\"Knorr-Bremse keeps c2c Electrostar fleet running smoothly with major door overhaul\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=297824\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=297824\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=297824#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=297824#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=297824\",\"name\":\"Knorr-Bremse keeps c2c Electrostar fleet running smoothly with major door overhaul - VibeWire Magazine\",\"description\":\"Knorr-Bremse Rail Systems has successfully completed a significant interim door overhaul for the c2c Class 357 \\u2018Electrostar\\u2019 fleet, securing the long-term reliability and availability of the trains that serve thousands of passengers across London and Essex every day. As the Electrostar fleet\\u2019s door systems reached a critical stage in their maintenance lifecycle, a comprehensive overhaul [\\u2026]\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=297824#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"datePublished\":\"2025-10-08T01:14:00+10:00\",\"dateModified\":\"2025-10-08T01:14:00+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Knorr-Bremse keeps c2c Electrostar fleet running smoothly with major door overhaul - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Knorr-Bremse keeps c2c Electrostar fleet running smoothly with major door overhaul - VibeWire Magazine","description":"Knorr-Bremse Rail Systems has successfully completed a significant interim door overhaul for the c2c Class 357 \u2018Electrostar\u2019 fleet, securing the long-term reliability and availability of the trains that serve thousands of passengers across London and Essex every day. As the Electrostar fleet\u2019s door systems reached a critical stage in their maintenance lifecycle, a comprehensive overhaul [\u2026]","canonical_url":"https:\/\/www.vibewire.com.au\/?p=297824","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=297824#blogposting","name":"Knorr-Bremse keeps c2c Electrostar fleet running smoothly with major door overhaul - VibeWire Magazine","headline":"Knorr-Bremse keeps c2c Electrostar fleet running smoothly with major door overhaul","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/10\/07160852\/Image-1-Class-357-1-485x360.jpeg","@id":"https:\/\/www.vibewire.com.au\/?p=297824\/#articleImage"},"datePublished":"2025-10-08T01:14:00+10:00","dateModified":"2025-10-08T01:14:00+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=297824#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=297824#webpage"},"articleSection":"General Interest, Industry News, Rail News, Rolling Stock, Train Operating Companies, UK"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=297824#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=297824#listItem","name":"Knorr-Bremse keeps c2c Electrostar fleet running smoothly with major door overhaul"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=297824#listItem","position":3,"name":"Knorr-Bremse keeps c2c Electrostar fleet running smoothly with major door overhaul","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=297824\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=297824\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=297824#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=297824#webpage","url":"https:\/\/www.vibewire.com.au\/?p=297824","name":"Knorr-Bremse keeps c2c Electrostar fleet running smoothly with major door overhaul - VibeWire Magazine","description":"Knorr-Bremse Rail Systems has successfully completed a significant interim door overhaul for the c2c Class 357 \u2018Electrostar\u2019 fleet, securing the long-term reliability and availability of the trains that serve thousands of passengers across London and Essex every day. As the Electrostar fleet\u2019s door systems reached a critical stage in their maintenance lifecycle, a comprehensive overhaul [\u2026]","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=297824#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"datePublished":"2025-10-08T01:14:00+10:00","dateModified":"2025-10-08T01:14:00+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Knorr-Bremse keeps c2c Electrostar fleet running smoothly with major door overhaul - VibeWire Magazine","og:description":"Knorr-Bremse Rail Systems has successfully completed a significant interim door overhaul for the c2c Class 357 \u2018Electrostar\u2019 fleet, securing the long-term reliability and availability of the trains that serve thousands of passengers across London and Essex every day. As the Electrostar fleet\u2019s door systems reached a critical stage in their maintenance lifecycle, a comprehensive overhaul [\u2026]","og:url":"https:\/\/www.vibewire.com.au\/?p=297824","article:published_time":"2025-10-07T15:14:00+00:00","article:modified_time":"2025-10-07T15:14:00+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Knorr-Bremse keeps c2c Electrostar fleet running smoothly with major door overhaul - VibeWire Magazine","twitter:description":"Knorr-Bremse Rail Systems has successfully completed a significant interim door overhaul for the c2c Class 357 \u2018Electrostar\u2019 fleet, securing the long-term reliability and availability of the trains that serve thousands of passengers across London and Essex every day. As the Electrostar fleet\u2019s door systems reached a critical stage in their maintenance lifecycle, a comprehensive overhaul [\u2026]","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"297824","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2025-10-07 15:31:36","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2025-10-07 15:29:28","updated":"2025-10-07 15:31:36"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tKnorr-Bremse keeps c2c Electrostar fleet running smoothly with major door overhaul\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"Knorr-Bremse keeps c2c Electrostar fleet running smoothly with major door overhaul","link":"https:\/\/www.vibewire.com.au\/?p=297824"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/297824","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=297824"}],"version-history":[{"count":3,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/297824\/revisions"}],"predecessor-version":[{"id":298244,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/297824\/revisions\/298244"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=297824"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=297824"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=297824"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}