{"id":29725,"date":"2024-04-22T23:38:30","date_gmt":"2024-04-22T13:38:30","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=29725"},"modified":"2024-04-22T23:38:30","modified_gmt":"2024-04-22T13:38:30","slug":"railway-reopened-exactly-one-month-after-train-derailment-in-grange-over-sands","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=29725","title":{"rendered":"Railway reopened exactly one month after train derailment in Grange-over-Sands"},"content":{"rendered":"<p>Rail passengers are being thanked for their patience after a train derailed in Grange-over-Sands on Friday 22 March 2024.<\/p>\n<p>One month on, services are running again on the Furness line between Lancaster and Barrow-in-Furness.<\/p>\n<p><a href=\"https:\/\/www.networkrail.co.uk\/\" target=\"_blank\" rel=\"noopener\">Network Rail<\/a> engineers have been working around the clock to restore the railway at Grange-over-Sands after a Northern train left the tracks.<\/p>\n<p>A void in the ground was found about 150m away from the derailed train.<\/p>\n<p>More than 8100 hours of work has taken place to get the railway restored so trains can run again.<\/p>\n<p>Engineers removed 400 tonnes of spoil from the embankments, and installed almost 84 tonnes of new materials to repair the damage at the location.<\/p>\n<p>Phil James, Network Rail\u2019s North West route director, said: \u201cI\u2019d like to thank passengers for their patience while we worked tirelessly to get the railway back up and running after it was severely damaged by the void and train derailment.<\/p>\n<p>\u201cThis has been a very complex recovery and repair job. We\u2019re continuing to work with the Rail Accident Investigation Branch on the investigation into what caused the derailment, but we\u2019re really glad we\u2019ve been able to work quickly to get the railway fixed.<\/p>\n<p>\u201cI\u2019m pleased that the line is open again for passengers on the busy Furness line.\u201d<\/p>\n<p>Network Rail have been working closely with train operator, Northern, to keep passengers on the move during the closure.<\/p>\n<p>Craig Harrop, regional director for Northern in the North West, said: \u201cWe\u2019d like to thank our customers for their patience while these important repairs to the rail infrastructure have been carried out by Network Rail. We\u2019re very pleased to be able to resume rail services on the Furness Line and re-connect our customers with the rest of our network.\u201d<\/p>\n<p>Network Rail is working with the Rail Accident Investigation Branch (RAIB) to identify the cause of the void and derailment.<\/p>","protected":false},"excerpt":{"rendered":"<p>Rail passengers are being thanked for their patience after a train derailed in Grange-over-Sands on Friday 22 March 2024. One month on, services are running [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":29726,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[47],"tags":[7,11],"class_list":["post-29725","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-rail-news","tag-transport","tag-usa"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Rail passengers are being thanked for their patience after a train derailed in Grange-over-Sands on Friday 22 March 2024. One month on, services are running again on the Furness line between Lancaster and Barrow-in-Furness. Network Rail engineers have been working around the clock to restore the railway at Grange-over-Sands after a Northern train left the\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=29725\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Railway reopened exactly one month after train derailment in Grange-over-Sands - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Rail passengers are being thanked for their patience after a train derailed in Grange-over-Sands on Friday 22 March 2024. One month on, services are running again on the Furness line between Lancaster and Barrow-in-Furness. Network Rail engineers have been working around the clock to restore the railway at Grange-over-Sands after a Northern train left the\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=29725\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-04-22T13:38:30+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-04-22T13:38:30+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Railway reopened exactly one month after train derailment in Grange-over-Sands - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Rail passengers are being thanked for their patience after a train derailed in Grange-over-Sands on Friday 22 March 2024. One month on, services are running again on the Furness line between Lancaster and Barrow-in-Furness. Network Rail engineers have been working around the clock to restore the railway at Grange-over-Sands after a Northern train left the\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=29725#blogposting\",\"name\":\"Railway reopened exactly one month after train derailment in Grange-over-Sands - VibeWire Magazine\",\"headline\":\"Railway reopened exactly one month after train derailment in Grange-over-Sands\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/Network-Rail-Grange-moK6Pe.jpeg\",\"width\":1534,\"height\":1040},\"datePublished\":\"2024-04-22T23:38:30+10:00\",\"dateModified\":\"2024-04-22T23:38:30+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=29725#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=29725#webpage\"},\"articleSection\":\"Rail News, transport, USA\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=29725#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=29725#listItem\",\"name\":\"Railway reopened exactly one month after train derailment in Grange-over-Sands\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=29725#listItem\",\"position\":3,\"name\":\"Railway reopened exactly one month after train derailment in Grange-over-Sands\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=29725\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=29725\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=29725#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=29725\",\"name\":\"Railway reopened exactly one month after train derailment in Grange-over-Sands - VibeWire Magazine\",\"description\":\"Rail passengers are being thanked for their patience after a train derailed in Grange-over-Sands on Friday 22 March 2024. One month on, services are running again on the Furness line between Lancaster and Barrow-in-Furness. Network Rail engineers have been working around the clock to restore the railway at Grange-over-Sands after a Northern train left the\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=29725#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/04\\\/Network-Rail-Grange-moK6Pe.jpeg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=29725\\\/#mainImage\",\"width\":1534,\"height\":1040},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=29725#mainImage\"},\"datePublished\":\"2024-04-22T23:38:30+10:00\",\"dateModified\":\"2024-04-22T23:38:30+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Railway reopened exactly one month after train derailment in Grange-over-Sands - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Railway reopened exactly one month after train derailment in Grange-over-Sands - VibeWire Magazine","description":"Rail passengers are being thanked for their patience after a train derailed in Grange-over-Sands on Friday 22 March 2024. One month on, services are running again on the Furness line between Lancaster and Barrow-in-Furness. Network Rail engineers have been working around the clock to restore the railway at Grange-over-Sands after a Northern train left the","canonical_url":"https:\/\/www.vibewire.com.au\/?p=29725","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=29725#blogposting","name":"Railway reopened exactly one month after train derailment in Grange-over-Sands - VibeWire Magazine","headline":"Railway reopened exactly one month after train derailment in Grange-over-Sands","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/04\/Network-Rail-Grange-moK6Pe.jpeg","width":1534,"height":1040},"datePublished":"2024-04-22T23:38:30+10:00","dateModified":"2024-04-22T23:38:30+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=29725#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=29725#webpage"},"articleSection":"Rail News, transport, USA"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=29725#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=29725#listItem","name":"Railway reopened exactly one month after train derailment in Grange-over-Sands"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=29725#listItem","position":3,"name":"Railway reopened exactly one month after train derailment in Grange-over-Sands","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=29725\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=29725\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=29725#webpage","url":"https:\/\/www.vibewire.com.au\/?p=29725","name":"Railway reopened exactly one month after train derailment in Grange-over-Sands - VibeWire Magazine","description":"Rail passengers are being thanked for their patience after a train derailed in Grange-over-Sands on Friday 22 March 2024. One month on, services are running again on the Furness line between Lancaster and Barrow-in-Furness. Network Rail engineers have been working around the clock to restore the railway at Grange-over-Sands after a Northern train left the","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=29725#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/04\/Network-Rail-Grange-moK6Pe.jpeg","@id":"https:\/\/www.vibewire.com.au\/?p=29725\/#mainImage","width":1534,"height":1040},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=29725#mainImage"},"datePublished":"2024-04-22T23:38:30+10:00","dateModified":"2024-04-22T23:38:30+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Railway reopened exactly one month after train derailment in Grange-over-Sands - VibeWire Magazine","og:description":"Rail passengers are being thanked for their patience after a train derailed in Grange-over-Sands on Friday 22 March 2024. One month on, services are running again on the Furness line between Lancaster and Barrow-in-Furness. Network Rail engineers have been working around the clock to restore the railway at Grange-over-Sands after a Northern train left the","og:url":"https:\/\/www.vibewire.com.au\/?p=29725","article:published_time":"2024-04-22T13:38:30+00:00","article:modified_time":"2024-04-22T13:38:30+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Railway reopened exactly one month after train derailment in Grange-over-Sands - VibeWire Magazine","twitter:description":"Rail passengers are being thanked for their patience after a train derailed in Grange-over-Sands on Friday 22 March 2024. One month on, services are running again on the Furness line between Lancaster and Barrow-in-Furness. Network Rail engineers have been working around the clock to restore the railway at Grange-over-Sands after a Northern train left the","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"29725","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-05-31 22:29:06","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-04-22 23:46:25","updated":"2026-05-31 22:29:06"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tRailway reopened exactly one month after train derailment in Grange-over-Sands\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"Railway reopened exactly one month after train derailment in Grange-over-Sands","link":"https:\/\/www.vibewire.com.au\/?p=29725"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/29725","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=29725"}],"version-history":[{"count":0,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/29725\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/media\/29726"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=29725"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=29725"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=29725"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}