{"id":293238,"date":"2025-09-29T19:25:44","date_gmt":"2025-09-29T09:25:44","guid":{"rendered":"https:\/\/railuk.com\/?p=183179"},"modified":"2025-09-29T19:25:44","modified_gmt":"2025-09-29T09:25:44","slug":"north-downs-line-between-guildford-and-gatwick-airport-reopened-after-upgrades","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=293238","title":{"rendered":"North Downs Line between Guildford and Gatwick Airport reopened after upgrades"},"content":{"rendered":"<p><a href=\"https:\/\/railuk.com\/travel\/north-downs-line-between-guildford-and-gatwick-airport-reopened-after-upgrades\/\" title=\"North Downs Line between Guildford and Gatwick Airport reopened after upgrades\" rel=\"nofollow\"><img loading=\"lazy\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/09\/29102401\/Guildford-signalling-centre-Network-Rail-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\" style=\"display: block; margin-bottom: 5px; clear:both;max-width: 100%;\" link_thumbnail=\"1\" decoding=\"async\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/09\/29102401\/Guildford-signalling-centre-Network-Rail-485x360.jpg 485w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/09\/29102401\/Guildford-signalling-centre-Network-Rail-80x60.jpg 80w\" sizes=\"auto, (max-width: 485px) 100vw, 485px\" \/><\/a><\/p>\n<p>Trains are running again on the North Downs Line between Guildford and Gatwick Airport following a two-week closure to complete major signalling and level crossing upgrades<\/p>\n<p>During the closure, four level crossings were upgraded on the line: Chilworth, Tangley, Brook, and Burrows Lane. All four crossings are now linked to the Guildford Area Signalling Centre, improving safety and reliability.<\/p>\n<p>At Brook and Burrows Lane level crossings, new radar technology scans the crossing before each train arrives, lowering the barriers only when the route is clear.<\/p>\n<p>At Chilworth and Tangley, new CCTV means a signaller can check the crossing and lower the barriers when it is safe. Burrows Lane, Tangley and Brook crossings are currently three of the &#8220;riskiest crossings&#8221; on the route and these works would decrease the risk of an incident by 97%.<\/p>\n<p>Engineers also upgraded the signalling between Shalford and Gomshall. As part of these works, 16 signals were upgraded along this stretch of railway. Newer equipment means faults are less likely to occur, providing more reliable services for passengers.<\/p>\n<p>Mark Goodall, Wessex route director for Network Rail, said: \u201cWe would like to thank passengers and lineside neighbours for their patience while we carried out these vital improvement works.\u201d<\/p>\n<p>\u201cImproving safety on the railway is our number one priority and these level crossing improvements have made giant strides in improving the safety of the line. Upgrading the signalling to bring it into the Guildford Area Signalling Centre will also streamline the railway and reduce the risk of faults on the line.\u201d<\/p>\n<p>The upgrades are part of a wider programme to modernise the North Downs Line, creating the capacity to run more services in the future.<\/p>\n<p>Andy Gallaugher, GWR station manager for the North Downs line, said: &#8220;We\u2019re grateful that train services are now running again between Guildford and Gatwick Airport.<\/p>\n<p>\u201cThis work helps to lay the foundation for future capacity improvements on the line, helping even more people to access the airport sustainably.\u201d<\/p>\n<p>Image credit: Network Rail<\/p>\n","protected":false},"excerpt":{"rendered":"<p><a href=\"https:\/\/railuk.com\/travel\/north-downs-line-between-guildford-and-gatwick-airport-reopened-after-upgrades\/\" title=\"North Downs Line between Guildford and Gatwick Airport reopened after upgrades\" rel=\"nofollow\"><img loading=\"lazy\" decoding=\"async\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/09\/29102401\/Guildford-signalling-centre-Network-Rail-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\"><\/a>Trains are running again on the North Downs Line between Guildford and Gatwick Airport following a two-week closure to complete major signalling and level crossing upgrades During the closure, four level crossings were upgraded on the line: Chilworth, Tangley, Brook, and Burrows Lane. All four crossings are now linked to the Guildford Area Signalling Centre, [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[47,16115,16016,913,85],"tags":[],"class_list":["post-293238","post","type-post","status-publish","format-standard","hentry","category-rail-news","category-signalling-and-telecoms","category-train-operating-companies","category-travel","category-uk"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Trains are running again on the North Downs Line between Guildford and Gatwick Airport following a two-week closure to complete major signalling and level crossing upgrades During the closure, four level crossings were upgraded on the line: Chilworth, Tangley, Brook, and Burrows Lane. All four crossings are now linked to the Guildford Area Signalling Centre, [\u2026]\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=293238\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"North Downs Line between Guildford and Gatwick Airport reopened after upgrades - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Trains are running again on the North Downs Line between Guildford and Gatwick Airport following a two-week closure to complete major signalling and level crossing upgrades During the closure, four level crossings were upgraded on the line: Chilworth, Tangley, Brook, and Burrows Lane. All four crossings are now linked to the Guildford Area Signalling Centre, [\u2026]\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=293238\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2025-09-29T09:25:44+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2025-09-29T09:25:44+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"North Downs Line between Guildford and Gatwick Airport reopened after upgrades - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Trains are running again on the North Downs Line between Guildford and Gatwick Airport following a two-week closure to complete major signalling and level crossing upgrades During the closure, four level crossings were upgraded on the line: Chilworth, Tangley, Brook, and Burrows Lane. All four crossings are now linked to the Guildford Area Signalling Centre, [\u2026]\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=293238#blogposting\",\"name\":\"North Downs Line between Guildford and Gatwick Airport reopened after upgrades - VibeWire Magazine\",\"headline\":\"North Downs Line between Guildford and Gatwick Airport reopened after upgrades\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/cdn.railuk.co\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/29102401\\\/Guildford-signalling-centre-Network-Rail-485x360.jpg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=293238\\\/#articleImage\"},\"datePublished\":\"2025-09-29T19:25:44+10:00\",\"dateModified\":\"2025-09-29T19:25:44+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=293238#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=293238#webpage\"},\"articleSection\":\"Rail News, Signalling and Telecoms, Train Operating Companies, Travel, UK\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=293238#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=293238#listItem\",\"name\":\"North Downs Line between Guildford and Gatwick Airport reopened after upgrades\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=293238#listItem\",\"position\":3,\"name\":\"North Downs Line between Guildford and Gatwick Airport reopened after upgrades\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=293238\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=293238\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=293238#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=293238#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=293238\",\"name\":\"North Downs Line between Guildford and Gatwick Airport reopened after upgrades - VibeWire Magazine\",\"description\":\"Trains are running again on the North Downs Line between Guildford and Gatwick Airport following a two-week closure to complete major signalling and level crossing upgrades During the closure, four level crossings were upgraded on the line: Chilworth, Tangley, Brook, and Burrows Lane. All four crossings are now linked to the Guildford Area Signalling Centre, [\\u2026]\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=293238#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"datePublished\":\"2025-09-29T19:25:44+10:00\",\"dateModified\":\"2025-09-29T19:25:44+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>North Downs Line between Guildford and Gatwick Airport reopened after upgrades - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"North Downs Line between Guildford and Gatwick Airport reopened after upgrades - VibeWire Magazine","description":"Trains are running again on the North Downs Line between Guildford and Gatwick Airport following a two-week closure to complete major signalling and level crossing upgrades During the closure, four level crossings were upgraded on the line: Chilworth, Tangley, Brook, and Burrows Lane. All four crossings are now linked to the Guildford Area Signalling Centre, [\u2026]","canonical_url":"https:\/\/www.vibewire.com.au\/?p=293238","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=293238#blogposting","name":"North Downs Line between Guildford and Gatwick Airport reopened after upgrades - VibeWire Magazine","headline":"North Downs Line between Guildford and Gatwick Airport reopened after upgrades","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/09\/29102401\/Guildford-signalling-centre-Network-Rail-485x360.jpg","@id":"https:\/\/www.vibewire.com.au\/?p=293238\/#articleImage"},"datePublished":"2025-09-29T19:25:44+10:00","dateModified":"2025-09-29T19:25:44+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=293238#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=293238#webpage"},"articleSection":"Rail News, Signalling and Telecoms, Train Operating Companies, Travel, UK"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=293238#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=293238#listItem","name":"North Downs Line between Guildford and Gatwick Airport reopened after upgrades"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=293238#listItem","position":3,"name":"North Downs Line between Guildford and Gatwick Airport reopened after upgrades","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=293238\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=293238\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=293238#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=293238#webpage","url":"https:\/\/www.vibewire.com.au\/?p=293238","name":"North Downs Line between Guildford and Gatwick Airport reopened after upgrades - VibeWire Magazine","description":"Trains are running again on the North Downs Line between Guildford and Gatwick Airport following a two-week closure to complete major signalling and level crossing upgrades During the closure, four level crossings were upgraded on the line: Chilworth, Tangley, Brook, and Burrows Lane. All four crossings are now linked to the Guildford Area Signalling Centre, [\u2026]","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=293238#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"datePublished":"2025-09-29T19:25:44+10:00","dateModified":"2025-09-29T19:25:44+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"North Downs Line between Guildford and Gatwick Airport reopened after upgrades - VibeWire Magazine","og:description":"Trains are running again on the North Downs Line between Guildford and Gatwick Airport following a two-week closure to complete major signalling and level crossing upgrades During the closure, four level crossings were upgraded on the line: Chilworth, Tangley, Brook, and Burrows Lane. All four crossings are now linked to the Guildford Area Signalling Centre, [\u2026]","og:url":"https:\/\/www.vibewire.com.au\/?p=293238","article:published_time":"2025-09-29T09:25:44+00:00","article:modified_time":"2025-09-29T09:25:44+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"North Downs Line between Guildford and Gatwick Airport reopened after upgrades - VibeWire Magazine","twitter:description":"Trains are running again on the North Downs Line between Guildford and Gatwick Airport following a two-week closure to complete major signalling and level crossing upgrades During the closure, four level crossings were upgraded on the line: Chilworth, Tangley, Brook, and Burrows Lane. All four crossings are now linked to the Guildford Area Signalling Centre, [\u2026]","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"293238","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2025-09-29 10:24:55","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2025-09-29 10:21:23","updated":"2025-09-29 10:24:55"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tNorth Downs Line between Guildford and Gatwick Airport reopened after upgrades\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"North Downs Line between Guildford and Gatwick Airport reopened after upgrades","link":"https:\/\/www.vibewire.com.au\/?p=293238"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/293238","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=293238"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/293238\/revisions"}],"predecessor-version":[{"id":293877,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/293238\/revisions\/293877"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=293238"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=293238"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=293238"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}