{"id":29089,"date":"2024-04-20T11:41:00","date_gmt":"2024-04-20T01:41:00","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=29089"},"modified":"2024-04-20T10:43:47","modified_gmt":"2024-04-20T00:43:47","slug":"arena-grants-9-4m-to-electric-rail-freight-project","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=29089","title":{"rendered":"ARENA grants $9.4M to electric rail freight project"},"content":{"rendered":"\n<p>The Australian Renewable Energy Agency (ARENA), on behalf of the Federal Government, has granted $9.4 million in funding for a new project to electrify rail freight transport of commodities.<\/p>\n\n\n\n<p>The grant was awarded to Aurizon Operations to contribute to an $18.8 million Battery Powered Tender for Heavy Haul Fleet Decarbonisation project, a world-first proof of concept rail tender.<\/p>\n\n\n\n<p>The project is expected to develop, test and trial a battery electric tender (BET) to power a diesel-electric locomotive in a hybrid diesel and battery configuration, designed to cut emissions from Australia\u2019s resources industry.<\/p>\n\n\n\n<p>ARENA Chief Executive Officer, Darren Miller, said the project is addressing an emissions challenge in one of Australia\u2019s largest industries.<\/p>\n\n\n\n<p>\u201cAurizon\u2019s battery electric tender is a world first that hopes to pave the way for the rail freight industry and help the resources on its decarbonisation journey,\u201d Mr Miller said.<\/p>\n\n\n\n<p>The BET prototype will consist of a purpose-built wagon housing a 1.8MWh battery. There is the potential that, at scale and with the use of regenerative braking, a BET could enable a power transition from diesel to electricity when coupled with a modified diesel electric locomotive.&nbsp;<\/p>\n\n\n\n<p>In addition, when coupled with future battery electric locomotives, the BET will potentially provide all the power required for up to 50 per cent of Aurizon\u2019s commercial haul routes.<\/p>\n\n\n\n<p>Battery electric locomotion offers a pathway to decarbonising rail freight using existing rail infrastructure, without electrifying railway lines at potentially much greater cost.<\/p>\n\n\n\n<p>Project partner Alta Battery Technology is expected to design and construct the unit in Australia, which will be deployed hauling raw materials for an Aurizon customer.<\/p>\n\n\n\n<p>The project will also see the installation of associated charging infrastructure at an Aurizon customer site. Engineering consultants will provide technical services and engineering work for the charging infrastructure connection.<\/p>\n\n\n\n<p>Aurizon is Australia\u2019s largest rail freight operator, with around 700 active locomotives hauling over 15,000 wagons of product across Australia.<\/p>\n\n\n\n<p>Rail transport emissions from Australia\u2019s heavy haul freight industry accounts for more than 4Mt of CO\u2082e, or 0.8 per cent of Australia\u2019s total greenhouse gas emissions.<\/p>\n\n\n\n<p>The bulk of these emissions are in service of Australia\u2019s resource industry, which relies on heavy rail freight haulage to transport commodities from remote mine sites to ports and refineries.<\/p>\n\n\n\n<p>\u201cThe resources industry is a pillar of the Australian economy, but also accounts for a significant share of emissions,\u201d Mr Miller said.<\/p>\n\n\n\n<p>\u201cARENA is investing in the technological solutions that will enable the sector to reduce emissions across its operations.\u201d<\/p>\n\n\n\n<p>Project design is currently underway, with Aurizon expecting the unit to commence trial operations in early 2026.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Australian Renewable Energy Agency (ARENA), on behalf of the Federal Government, has granted $9.4 million in funding for a new project to electrify rail freight transport of commodities.<\/p>\n","protected":false},"author":20,"featured_media":29090,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[273,163],"tags":[5722,472,9,7],"class_list":["post-29089","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-australia","category-rail-industry-news-australia-new-zealand","tag-aurizon","tag-australian","tag-freight","tag-transport"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/29089","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/20"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=29089"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/29089\/revisions"}],"predecessor-version":[{"id":29091,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/29089\/revisions\/29091"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/media\/29090"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=29089"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=29089"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=29089"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}