{"id":289176,"date":"2025-09-22T21:43:34","date_gmt":"2025-09-22T11:43:34","guid":{"rendered":"http:\/\/www.vibewire.com.au\/?guid=021d6884ff396e5042348db58770e5e6"},"modified":"2025-09-22T21:43:34","modified_gmt":"2025-09-22T11:43:34","slug":"n2-class-steam-locomotive-passes-steam-test","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=289176","title":{"rendered":"N2 Class steam locomotive passes steam test"},"content":{"rendered":"<p><img loading=\"lazy\" width=\"640\" height=\"457\" src=\"https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2025\/09\/250828-062a-P1080482amed-1008x720.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"N2 No. 1744 being overhauled at the North Norfolk Railway. \/\/ Credit: The Gresley Society\" style=\"display: block; margin: auto; margin-bottom: 10px; max-width: 100%;\" decoding=\"async\" srcset=\"https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2025\/09\/250828-062a-P1080482amed-1008x720.jpg 1008w, https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2025\/09\/250828-062a-P1080482amed-300x214.jpg 300w, https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2025\/09\/250828-062a-P1080482amed-768x548.jpg 768w, https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2025\/09\/250828-062a-P1080482amed-750x536.jpg 750w, https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2025\/09\/250828-062a-P1080482amed-624x446.jpg 624w, https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2025\/09\/250828-062a-P1080482amed-600x428.jpg 600w, https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2025\/09\/250828-062a-P1080482amed.jpg 1280w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/>A six-year overhaul of N2 Class No. 1744 is nearing completion, and passed its steam test in August, with a return to service planned for next spring<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A six-year overhaul of N2 Class No. 1744 is nearing completion, and passed its steam test in August, with a return to service planned for next spring<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[13499,2320,2728,47,1419],"tags":[12406],"class_list":["post-289176","post","type-post","status-publish","format-standard","hentry","category-13499","category-norfolk","category-north-norfolk-railway","category-rail-news","category-standard-gauge","tag-rail-advent"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/289176","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=289176"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/289176\/revisions"}],"predecessor-version":[{"id":289178,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/289176\/revisions\/289178"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=289176"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=289176"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=289176"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}