{"id":28438,"date":"2024-04-18T01:37:33","date_gmt":"2024-04-17T15:37:33","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=28438"},"modified":"2024-04-18T01:37:33","modified_gmt":"2024-04-17T15:37:33","slug":"work-starts-on-taipei-mrt-light-green-line-phase-2","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=28438","title":{"rendered":"Work starts on Taipei MRT Light Green Line Phase 2"},"content":{"rendered":"<p>CONSTRUCTION has started on the second phase of Taipei MRT\u2019s Light Green Line from Zhonghe Senior High School to Huilong. The majority of the 13.3km line will be elevated, but a 2.84km section closest to central Taipei will be underground, including two stations.<\/p>\n<p>According to local media, completion of the whole route, also known as the Wanda &#8211; Zhonghe &#8211; Shulin Line, is expected in 2031. The first phase, a 9.5km underground section from Chiang Kai-shek (CKS) Memorial Hall to Zhonge Senior High School and a branch to Juguang is currently under construction and is due to be completed next year.<\/p>\n<p>The line will transition from underground to elevated track close to the Mingde Road junction. Once the whole line is finished, the journey time from the Shulin district to the core areas of Taipei and New Taipei will be reduced by 30 minutes, Mr Lee Cheng-an, head of New Taipei&#8217;s Department of Rapid Transit Systems, told local media.<\/p>\n<p>The new line, which will connect New Taipei&#8217;s Tucheng, Shulin and Xinzhuang districts, will provide interchange with three other MRT lines: the Blue Line, Orange Line and Brown Line at Tucheng and Huilong stations.<\/p>\n<p><em>For detailed data on metro projects across Asia, subscribe to <a href=\"https:\/\/irjpro.com\/\" target=\"_blank\" rel=\"noopener\">IRJ Pro<\/a>.<\/em><\/p>\n<p>The post <a href=\"https:\/\/www.railjournal.com\/passenger\/metros\/work-starts-on-taipei-mrt-light-green-line-phase-2\/\">Work starts on Taipei MRT Light Green Line Phase 2<\/a> appeared first on <a href=\"https:\/\/www.railjournal.com\/\">International Railway Journal<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>CONSTRUCTION has started on the second phase of Taipei MRT\u2019s Light Green Line from Zhonghe Senior High School to Huilong. The majority of the 13.3km [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[47,5],"tags":[],"class_list":["post-28438","post","type-post","status-publish","format-standard","hentry","category-rail-news","category-transport"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.9 - aioseo.com -->\n\t<meta name=\"description\" content=\"CONSTRUCTION has started on the second phase of Taipei MRT\u2019s Light Green Line from Zhonghe Senior High School to Huilong. The majority of the 13.3km line will be elevated, but a 2.84km section closest to central Taipei will be underground, including two stations. According to local media, completion of the whole route, also known as\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=28438\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.9\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Work starts on Taipei MRT Light Green Line Phase 2 - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"CONSTRUCTION has started on the second phase of Taipei MRT\u2019s Light Green Line from Zhonghe Senior High School to Huilong. The majority of the 13.3km line will be elevated, but a 2.84km section closest to central Taipei will be underground, including two stations. According to local media, completion of the whole route, also known as\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=28438\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-04-17T15:37:33+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-04-17T15:37:33+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Work starts on Taipei MRT Light Green Line Phase 2 - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"CONSTRUCTION has started on the second phase of Taipei MRT\u2019s Light Green Line from Zhonghe Senior High School to Huilong. The majority of the 13.3km line will be elevated, but a 2.84km section closest to central Taipei will be underground, including two stations. According to local media, completion of the whole route, also known as\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=28438#blogposting\",\"name\":\"Work starts on Taipei MRT Light Green Line Phase 2 - VibeWire Magazine\",\"headline\":\"Work starts on Taipei MRT Light Green Line Phase 2\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#articleImage\",\"width\":1028,\"height\":930},\"datePublished\":\"2024-04-18T01:37:33+10:00\",\"dateModified\":\"2024-04-18T01:37:33+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=28438#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=28438#webpage\"},\"articleSection\":\"Rail News, TRANSPORT\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=28438#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=5#listItem\",\"name\":\"TRANSPORT\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=5#listItem\",\"position\":2,\"name\":\"TRANSPORT\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=5\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=28438#listItem\",\"name\":\"Work starts on Taipei MRT Light Green Line Phase 2\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=28438#listItem\",\"position\":3,\"name\":\"Work starts on Taipei MRT Light Green Line Phase 2\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=5#listItem\",\"name\":\"TRANSPORT\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=28438\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=28438\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=28438#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=28438\",\"name\":\"Work starts on Taipei MRT Light Green Line Phase 2 - VibeWire Magazine\",\"description\":\"CONSTRUCTION has started on the second phase of Taipei MRT\\u2019s Light Green Line from Zhonghe Senior High School to Huilong. The majority of the 13.3km line will be elevated, but a 2.84km section closest to central Taipei will be underground, including two stations. According to local media, completion of the whole route, also known as\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=28438#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"datePublished\":\"2024-04-18T01:37:33+10:00\",\"dateModified\":\"2024-04-18T01:37:33+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Work starts on Taipei MRT Light Green Line Phase 2 - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Work starts on Taipei MRT Light Green Line Phase 2 - VibeWire Magazine","description":"CONSTRUCTION has started on the second phase of Taipei MRT\u2019s Light Green Line from Zhonghe Senior High School to Huilong. The majority of the 13.3km line will be elevated, but a 2.84km section closest to central Taipei will be underground, including two stations. According to local media, completion of the whole route, also known as","canonical_url":"https:\/\/www.vibewire.com.au\/?p=28438","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=28438#blogposting","name":"Work starts on Taipei MRT Light Green Line Phase 2 - VibeWire Magazine","headline":"Work starts on Taipei MRT Light Green Line Phase 2","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/#articleImage","width":1028,"height":930},"datePublished":"2024-04-18T01:37:33+10:00","dateModified":"2024-04-18T01:37:33+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=28438#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=28438#webpage"},"articleSection":"Rail News, TRANSPORT"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=28438#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=5#listItem","name":"TRANSPORT"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=5#listItem","position":2,"name":"TRANSPORT","item":"https:\/\/www.vibewire.com.au\/?cat=5","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=28438#listItem","name":"Work starts on Taipei MRT Light Green Line Phase 2"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=28438#listItem","position":3,"name":"Work starts on Taipei MRT Light Green Line Phase 2","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=5#listItem","name":"TRANSPORT"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=28438\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=28438\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=28438#webpage","url":"https:\/\/www.vibewire.com.au\/?p=28438","name":"Work starts on Taipei MRT Light Green Line Phase 2 - VibeWire Magazine","description":"CONSTRUCTION has started on the second phase of Taipei MRT\u2019s Light Green Line from Zhonghe Senior High School to Huilong. The majority of the 13.3km line will be elevated, but a 2.84km section closest to central Taipei will be underground, including two stations. According to local media, completion of the whole route, also known as","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=28438#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"datePublished":"2024-04-18T01:37:33+10:00","dateModified":"2024-04-18T01:37:33+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Work starts on Taipei MRT Light Green Line Phase 2 - VibeWire Magazine","og:description":"CONSTRUCTION has started on the second phase of Taipei MRT\u2019s Light Green Line from Zhonghe Senior High School to Huilong. The majority of the 13.3km line will be elevated, but a 2.84km section closest to central Taipei will be underground, including two stations. According to local media, completion of the whole route, also known as","og:url":"https:\/\/www.vibewire.com.au\/?p=28438","article:published_time":"2024-04-17T15:37:33+00:00","article:modified_time":"2024-04-17T15:37:33+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Work starts on Taipei MRT Light Green Line Phase 2 - VibeWire Magazine","twitter:description":"CONSTRUCTION has started on the second phase of Taipei MRT\u2019s Light Green Line from Zhonghe Senior High School to Huilong. The majority of the 13.3km line will be elevated, but a 2.84km section closest to central Taipei will be underground, including two stations. According to local media, completion of the whole route, also known as","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"28438","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-05-30 03:43:25","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-04-18 01:44:25","updated":"2026-05-30 03:43:25"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=5\" title=\"TRANSPORT\">TRANSPORT<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tWork starts on Taipei MRT Light Green Line Phase 2\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"TRANSPORT","link":"https:\/\/www.vibewire.com.au\/?cat=5"},{"label":"Work starts on Taipei MRT Light Green Line Phase 2","link":"https:\/\/www.vibewire.com.au\/?p=28438"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/28438","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=28438"}],"version-history":[{"count":0,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/28438\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=28438"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=28438"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=28438"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}