{"id":27897,"date":"2024-04-16T08:49:51","date_gmt":"2024-04-15T22:49:51","guid":{"rendered":"https:\/\/www.railexpress.com.au\/?p=115914"},"modified":"2024-04-16T08:49:51","modified_gmt":"2024-04-15T22:49:51","slug":"brunt-road-closed-to-finish-new-road-bridge","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=27897","title":{"rendered":"Brunt Road closed to finish new road bridge"},"content":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/04\/Brunt-Road.jpeg\" alt=\"\" style=\"float:right; margin:0 0 10px 10px;\"><figcaption>Image\/Victoria&#8217;s Big Build<\/figcaption><\/figure>\n<p><strong>The dangerous and congested level crossing at\u00a0<a href=\"https:\/\/bigbuild.vic.gov.au\/projects\/level-crossing-removal-project\/projects\/brunt-road-beaconsfield\"  rel=\"noopener\">Brunt Road, Beaconsfield<\/a>\u00a0will be gone for good one year ahead of schedule, with <a href=\"https:\/\/www.railexpress.com.au\/brunt-road-bridge-to-open-a-year-ahead-of-schedule\/\">Brunt Road<\/a> now closed to allow finishing works to safely take place.<\/strong><span id=\"more-115914\"><\/span><\/p>\n<p>Crews are working 24\/7 until late April to lay 2400 tonnes of asphalt on the new road bridge that will separate cars and trains for good.<\/p>\n<p>To allow work to be carried out safely, Brunt Road is closed between Edinburgh Drive\/Pioneer Way and Rix Road, with detours in place for drivers and pedestrians.<\/p>\n<p>When the road reopens, there will be a new footpath and shared use path across the new road bridge, providing a direct link to local schools, shops and services on either side of the rail line.<\/p>\n<p>With the Brunt Road level crossing gone, the Pakenham Line will be one step closer to being level crossing-free by 2025 \u2013 improving journeys for the 8400 drivers passing through each day and allowing for more trains after the Metro Tunnel opens in 2025.<\/p>\n<p>To find out more about traffic changes and to plan your journey, visit the\u00a0<a href=\"https:\/\/bigbuild.vic.gov.au\/disruptions\/disruptions-map\">disruptions map<\/a>.<\/p>\n<div>\n<p>The team have recently installed 160 panels to be painted in earthy, brick tones to form the retaining walls, with 100,000 tonnes of material placed between the panels to form the new bridge.<\/p>\n<\/div>\n<div>\n<p>When Brunt Road reopens in late April, road users will have a safer, more reliable way to cross the rail line, allowing works to start to close the\u00a0<a href=\"https:\/\/bigbuild.vic.gov.au\/projects\/level-crossing-removal-project\/projects\/station-street-officer\"  rel=\"noopener\">Station Street, Officer<\/a>\u00a0level crossing.<\/p>\n<\/div>\n<div>\n<p>Early works will start in Officer shortly after the Brunt Road bridge opens, with the level crossing to be closed for good by 2024.<\/p>\n<\/div>\n<div>\n<p>Closing the Station Street, Officer level crossing will improve safety, reduce congestion, and contribute to a level crossing-free Pakenham line by 2025.<\/p>\n<\/div>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/brunt-road-closed-to-finish-new-road-bridge\/\">Brunt Road closed to finish new road bridge<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The dangerous and congested level crossing at\u00a0Brunt Road, Beaconsfield\u00a0will be gone for good one year ahead of schedule, with Brunt \u2026 <\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/brunt-road-closed-to-finish-new-road-bridge\/\">Brunt Road closed to finish new road bridge<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[165,879,163,906],"tags":[],"class_list":["post-27897","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-infrastructure","category-level-crossing-removal","category-rail-industry-news-australia-new-zealand","category-state"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"The dangerous and congested level crossing at Brunt Road, Beaconsfield will be gone for good one year ahead of schedule, with Brunt \u2026 The post Brunt Road closed to finish new road bridge appeared first on Rail Express.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=27897\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Brunt Road closed to finish new road bridge - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"The dangerous and congested level crossing at Brunt Road, Beaconsfield will be gone for good one year ahead of schedule, with Brunt \u2026 The post Brunt Road closed to finish new road bridge appeared first on Rail Express.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=27897\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-04-15T22:49:51+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-04-15T22:49:51+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Brunt Road closed to finish new road bridge - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The dangerous and congested level crossing at Brunt Road, Beaconsfield will be gone for good one year ahead of schedule, with Brunt \u2026 The post Brunt Road closed to finish new road bridge appeared first on Rail Express.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=27897#blogposting\",\"name\":\"Brunt Road closed to finish new road bridge - VibeWire Magazine\",\"headline\":\"Brunt Road closed to finish new road bridge\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1},\"datePublished\":\"2024-04-16T08:49:51+10:00\",\"dateModified\":\"2024-04-16T08:49:51+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=27897#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=27897#webpage\"},\"articleSection\":\"Industry Infrastructure, Level Crossing Removal, Rail industry news (Australia, New Zealand), State\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=27897#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"name\":\"Rail industry news (Australia, New Zealand)\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"position\":2,\"name\":\"Rail industry news (Australia, New Zealand)\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=27897#listItem\",\"name\":\"Brunt Road closed to finish new road bridge\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=27897#listItem\",\"position\":3,\"name\":\"Brunt Road closed to finish new road bridge\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=163#listItem\",\"name\":\"Rail industry news (Australia, New Zealand)\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=27897\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=27897\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=27897#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=27897#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=27897\",\"name\":\"Brunt Road closed to finish new road bridge - VibeWire Magazine\",\"description\":\"The dangerous and congested level crossing at Brunt Road, Beaconsfield will be gone for good one year ahead of schedule, with Brunt \\u2026 The post Brunt Road closed to finish new road bridge appeared first on Rail Express.\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=27897#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1,\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=27897\\\/#mainImage\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=27897#mainImage\"},\"datePublished\":\"2024-04-16T08:49:51+10:00\",\"dateModified\":\"2024-04-16T08:49:51+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Brunt Road closed to finish new road bridge - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Brunt Road closed to finish new road bridge - VibeWire Magazine","description":"The dangerous and congested level crossing at Brunt Road, Beaconsfield will be gone for good one year ahead of schedule, with Brunt \u2026 The post Brunt Road closed to finish new road bridge appeared first on Rail Express.","canonical_url":"https:\/\/www.vibewire.com.au\/?p=27897","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=27897#blogposting","name":"Brunt Road closed to finish new road bridge - VibeWire Magazine","headline":"Brunt Road closed to finish new road bridge","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":1},"datePublished":"2024-04-16T08:49:51+10:00","dateModified":"2024-04-16T08:49:51+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=27897#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=27897#webpage"},"articleSection":"Industry Infrastructure, Level Crossing Removal, Rail industry news (Australia, New Zealand), State"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=27897#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","name":"Rail industry news (Australia, New Zealand)"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","position":2,"name":"Rail industry news (Australia, New Zealand)","item":"https:\/\/www.vibewire.com.au\/?cat=163","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=27897#listItem","name":"Brunt Road closed to finish new road bridge"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=27897#listItem","position":3,"name":"Brunt Road closed to finish new road bridge","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=163#listItem","name":"Rail industry news (Australia, New Zealand)"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=27897\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=27897\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=27897#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=27897#webpage","url":"https:\/\/www.vibewire.com.au\/?p=27897","name":"Brunt Road closed to finish new road bridge - VibeWire Magazine","description":"The dangerous and congested level crossing at Brunt Road, Beaconsfield will be gone for good one year ahead of schedule, with Brunt \u2026 The post Brunt Road closed to finish new road bridge appeared first on Rail Express.","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=27897#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"image":{"@type":"ImageObject","url":1,"@id":"https:\/\/www.vibewire.com.au\/?p=27897\/#mainImage"},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=27897#mainImage"},"datePublished":"2024-04-16T08:49:51+10:00","dateModified":"2024-04-16T08:49:51+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Brunt Road closed to finish new road bridge - VibeWire Magazine","og:description":"The dangerous and congested level crossing at Brunt Road, Beaconsfield will be gone for good one year ahead of schedule, with Brunt \u2026 The post Brunt Road closed to finish new road bridge appeared first on Rail Express.","og:url":"https:\/\/www.vibewire.com.au\/?p=27897","article:published_time":"2024-04-15T22:49:51+00:00","article:modified_time":"2024-04-15T22:49:51+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Brunt Road closed to finish new road bridge - VibeWire Magazine","twitter:description":"The dangerous and congested level crossing at Brunt Road, Beaconsfield will be gone for good one year ahead of schedule, with Brunt \u2026 The post Brunt Road closed to finish new road bridge appeared first on Rail Express.","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"27897","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-05-30 00:38:55","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-04-15 23:48:29","updated":"2026-05-30 00:38:55"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=163\" title=\"Rail industry news (Australia, New Zealand)\">Rail industry news (Australia, New Zealand)<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tBrunt Road closed to finish new road bridge\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail industry news (Australia, New Zealand)","link":"https:\/\/www.vibewire.com.au\/?cat=163"},{"label":"Brunt Road closed to finish new road bridge","link":"https:\/\/www.vibewire.com.au\/?p=27897"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/27897","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=27897"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/27897\/revisions"}],"predecessor-version":[{"id":27898,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/27897\/revisions\/27898"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=27897"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=27897"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=27897"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}