{"id":26999,"date":"2024-04-12T03:06:42","date_gmt":"2024-04-11T17:06:42","guid":{"rendered":"https:\/\/www.rtands.com\/?p=54136"},"modified":"2024-04-12T03:06:42","modified_gmt":"2024-04-11T17:06:42","slug":"camp-hall-rail-project-construction-moves-forward-in-south-carolina-2","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=26999","title":{"rendered":"Camp Hall Rail Project Construction Moves Forward in South Carolina"},"content":{"rendered":"<p>BERKELEY COUNTY, S.C. \u2013 Palmetto Railways\u2019 Camp Hall Rail Project continues in 5 phases before completion in spring 2026.<\/p>\n<p>The post <a rel=\"nofollow\" href=\"https:\/\/www.rtands.com\/track-construction\/camp-hall-rail-project-construction-moves-forward-in-south-carolina\/\">Camp Hall Rail Project Construction Moves Forward in South Carolina<\/a> appeared first on <a rel=\"nofollow\" href=\"https:\/\/www.rtands.com\/\">Railway Track and Structures<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>BERKELEY COUNTY, S.C. \u2013 Palmetto Railways\u2019 Camp Hall Rail Project continues in 5 phases before completion in spring 2026.<br \/>\nThe post Camp Hall Rail Project Construction Moves Forward in South Carolina appeared first on Railway Track and Structures.<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[2888,35,7716,31,36,1309,7717,367,58,33,641],"tags":[9],"class_list":["post-26999","post","type-post","status-publish","format-standard","hentry","category-ballast-ties-rail","category-breaking-news","category-camp-hall-rail-project","category-class-1","category-csx","category-freight-railroad","category-palmetto-railways","category-shortline-regional","category-track-construction","category-track-structure","category-yards-terminals","tag-freight"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/26999","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=26999"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/26999\/revisions"}],"predecessor-version":[{"id":27001,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/26999\/revisions\/27001"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=26999"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=26999"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=26999"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}