{"id":26820,"date":"2024-04-11T18:00:04","date_gmt":"2024-04-11T08:00:04","guid":{"rendered":"https:\/\/www.railfreight.com\/?p=51603"},"modified":"2024-04-11T18:00:04","modified_gmt":"2024-04-11T08:00:04","slug":"lack-of-capacity-along-iron-ore-line-puts-hundreds-of-lkab-jobs-at-risk","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=26820","title":{"rendered":"Lack of capacity along Iron Ore Line puts hundreds of LKAB jobs at risk"},"content":{"rendered":"<p><strong>LKAB, the largest iron ore producer in Europe, said that some of its facilities might close unless capacity along the Iron Ore Line, or Malmbanan, doesn\u2019t improve significantly. \u201cLKAB is reviewing closure in either Kiruna or Svappavaara based on what would mean the least damage to the company\u201d, they said.<\/strong><br \/>\n<span id=\"more-51603\"><\/span>Because of capacity issues, LKAB now finds itself with so much iron ore lying in Kiruna and Svappavaara to fill up 600 trains. \u201cWe cannot deliver the volumes we can produce\u201d, a spokesperson from LKAB told RailFreight.com. If either of the facilities close, the job loss might be significant. \u201cThat\u2019s some 300 jobs at LKAB, and perhaps as many from our contractors and consultants\u201d, the spokesperson added. However, it is too early to expect a decision as many parameters need to be considered.<\/p>\n<h2>Moving passengers to buses to leave room for freight?<\/h2>\n<p>The situation is already worrying, as LKAB said it had to reduce production in Malmberget because there was not enough capacity to transport raw materials from Svappavaara. Production in Malmberget has already decreased by one million tonnes per year, which translates into an annual revenue loss of 86.8 million euros at the current prices (one billion SEK).<\/p>\n<p>\u201cIf we cannot, together with the Swedish Transport Administration (Trafikverket) and Norwegian BaneNor, seriously increase the capacity within the existing system, we will be forced to take even more drastic measures\u201d, LKAB underlined. One of the possible solutions mentioned by the LKAB spokesperson is to transfer passenger services from trains to buses in specific sections of the line and times of the day. This would ensure more capacity for freight trains.<\/p>\n<p>LKAB is produced 26.2 million metric tonnes of iron ore in 2024 out of 38 total in Sweden. The country produces around 90 per cent of the European iron ore, making it a key player for the steel industry among others. The vast majority of LKAB\u2019s iron ore travels on freight trains along the Iron Ore Line, which connects the Swedish port of Lule\u00e5 to the Norwegian port of Narvik.<\/p>\n<h2>Recent derailments didn\u2019t help<\/h2>\n<p>The disastrous situation for LKAB was amplified by <a href=\"https:\/\/www.railfreight.com\/infrastructure\/2024\/03\/07\/iron-ore-line-reopens-ahead-of-schedule-but-concerns-remain\/\"  rel=\"noopener\">two derailments near Vassijaure<\/a> that cut off rail access to the Norwegian port of Narvik. The first one occurred on 17 December and led to the railway being unusable until 20 February. On 24 February, however, <a href=\"https:\/\/www.railfreight.com\/infrastructure\/2024\/02\/27\/another-derailment-along-the-iron-ore-line-this-time-it-may-be-sabotage\/\"  rel=\"noopener\">another freight train derailed<\/a> and the line was closed again until 6 March. The spokesperson clarified that the cut of production was not caused by these derailments, but the general lack of capacity along the line. Sill, the derailments caused daily losses for 8.6 million euros for LKAB.<\/p>\n<figure class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"fluid wp-image-50609 size-full\" src=\"https:\/\/www.railfreight.com\/wp-content\/uploads\/2024\/03\/Restoration-of-the-Iron-Ore-Line.webp\" alt=\"\" width=\"720\" height=\"540\" srcset=\"https:\/\/www.railfreight.com\/wp-content\/uploads\/2024\/03\/Restoration-of-the-Iron-Ore-Line.webp 720w, https:\/\/www.railfreight.com\/wp-content\/uploads\/2024\/03\/Restoration-of-the-Iron-Ore-Line-480x360.webp 480w, https:\/\/www.railfreight.com\/wp-content\/uploads\/2024\/03\/Restoration-of-the-Iron-Ore-Line-192x144.webp 192w\" sizes=\"auto, (max-width: 720px) 100vw, 720px\" \/><figcaption class=\"wp-caption-text\">Restoration of the Iron Ore Line after the second derailment. Image: \u00a9\u00a0LKAB<\/figcaption><\/figure>\n<p>\u201cFor the past 20 years, LKAB has pointed out the risks of the railway&#8217;s lack of capacity, the need for extended maintenance of the existing system and the need for double track\u201d, the company claimed. The company also underlined how, for its part, it made significant investments including more wagons, a locomotive workshop and a wheelset maintenance facility. Recently, Trafikverket was commissioned by the Swedish government to <a href=\"https:\/\/www.railfreight.com\/railfreight\/2024\/03\/22\/sweden-to-upgrade-iron-ore-line-after-derailments-and-nato-accession\/\"  rel=\"noopener\">prioritise projects along the Iron Ore Line<\/a>. Most of them should focus on facilitating the traffic of trains with an axle load of 32,5 tonnes compared to the current 30.<\/p>\n<p><strong>Also read:<\/strong><\/p>\n<ul>\n<li><a href=\"https:\/\/www.railfreight.com\/railfreight\/2024\/03\/15\/nurminen-logistics-opens-rail-link-connecting-finland-with-port-of-gothenburg\/\">Nurminen Logistics opens rail link connecting Finland with port of Gothenburg<\/a><\/li>\n<li><a href=\"https:\/\/www.railfreight.com\/corridors\/2024\/03\/11\/how-can-sweden-enhance-rail-freight-capacity-along-the-oresund-axis\/\">How can Sweden enhance rail freight capacity along the \u00d6resund axis?<\/a><\/li>\n<li><a href=\"https:\/\/www.railfreight.com\/business\/2023\/12\/21\/kombiverkher-extends-swedish-links-with-two-new-services\/\">Kombiverkehr extends Swedish links with two new services<\/a><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>LKAB, the largest iron ore producer in Europe, said that some of its facilities might close unless capacity along the Iron Ore Line, or Malmbanan, doesn\u2019t improve significantly. \u201cLKAB is reviewing closure in either Kiruna or Svappavaara based on what would mean the least damage to the company\u201d, they said. Because of capacity issues, LKAB\u2026<\/p>\n","protected":false},"author":9,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[6845,72,343,5339,5729,6708,5730,6709,3420,1968,5731],"tags":[],"class_list":["post-26820","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bane-nor","category-business","category-infrastructure","category-iron-ore-line","category-lkab","category-lulea","category-malmbanan","category-narvik","category-norway","category-sweden","category-trafikverket"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"LKAB, the largest iron ore producer in Europe, said that some of its facilities might close unless capacity along the Iron Ore Line, or Malmbanan, doesn\u2019t improve significantly. \u201cLKAB is reviewing closure in either Kiruna or Svappavaara based on what would mean the least damage to the company\u201d, they said. Because of capacity issues, LKAB\u2026\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Marco Raimondi\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=26820\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Lack of capacity along Iron Ore Line puts hundreds of LKAB jobs at risk - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"LKAB, the largest iron ore producer in Europe, said that some of its facilities might close unless capacity along the Iron Ore Line, or Malmbanan, doesn\u2019t improve significantly. \u201cLKAB is reviewing closure in either Kiruna or Svappavaara based on what would mean the least damage to the company\u201d, they said. Because of capacity issues, LKAB\u2026\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=26820\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-04-11T08:00:04+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-04-11T08:00:04+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Lack of capacity along Iron Ore Line puts hundreds of LKAB jobs at risk - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"LKAB, the largest iron ore producer in Europe, said that some of its facilities might close unless capacity along the Iron Ore Line, or Malmbanan, doesn\u2019t improve significantly. \u201cLKAB is reviewing closure in either Kiruna or Svappavaara based on what would mean the least damage to the company\u201d, they said. Because of capacity issues, LKAB\u2026\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=26820#blogposting\",\"name\":\"Lack of capacity along Iron Ore Line puts hundreds of LKAB jobs at risk - VibeWire Magazine\",\"headline\":\"Lack of capacity along Iron Ore Line puts hundreds of LKAB jobs at risk\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1},\"datePublished\":\"2024-04-11T18:00:04+10:00\",\"dateModified\":\"2024-04-11T18:00:04+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=26820#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=26820#webpage\"},\"articleSection\":\"Bane NOR, Business, Infrastructure, Iron Ore Line, LKAB, Lule\\u00e5, Malmbanan, Narvik, Norway, sweden, Trafikverket\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=26820#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=72#listItem\",\"name\":\"Business\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=72#listItem\",\"position\":2,\"name\":\"Business\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=72\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=26820#listItem\",\"name\":\"Lack of capacity along Iron Ore Line puts hundreds of LKAB jobs at risk\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=26820#listItem\",\"position\":3,\"name\":\"Lack of capacity along Iron Ore Line puts hundreds of LKAB jobs at risk\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=72#listItem\",\"name\":\"Business\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=26820\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=26820\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9\",\"name\":\"Marco Raimondi\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=26820#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fc241b4d8352e3e7ca08ec32c4ebd712ae862e0499265d83515e97acb5510625?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Marco Raimondi\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=26820#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=26820\",\"name\":\"Lack of capacity along Iron Ore Line puts hundreds of LKAB jobs at risk - VibeWire Magazine\",\"description\":\"LKAB, the largest iron ore producer in Europe, said that some of its facilities might close unless capacity along the Iron Ore Line, or Malmbanan, doesn\\u2019t improve significantly. \\u201cLKAB is reviewing closure in either Kiruna or Svappavaara based on what would mean the least damage to the company\\u201d, they said. Because of capacity issues, LKAB\\u2026\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=26820#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=9#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1,\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=26820\\\/#mainImage\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=26820#mainImage\"},\"datePublished\":\"2024-04-11T18:00:04+10:00\",\"dateModified\":\"2024-04-11T18:00:04+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Lack of capacity along Iron Ore Line puts hundreds of LKAB jobs at risk - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Lack of capacity along Iron Ore Line puts hundreds of LKAB jobs at risk - VibeWire Magazine","description":"LKAB, the largest iron ore producer in Europe, said that some of its facilities might close unless capacity along the Iron Ore Line, or Malmbanan, doesn\u2019t improve significantly. \u201cLKAB is reviewing closure in either Kiruna or Svappavaara based on what would mean the least damage to the company\u201d, they said. Because of capacity issues, LKAB\u2026","canonical_url":"https:\/\/www.vibewire.com.au\/?p=26820","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=26820#blogposting","name":"Lack of capacity along Iron Ore Line puts hundreds of LKAB jobs at risk - VibeWire Magazine","headline":"Lack of capacity along Iron Ore Line puts hundreds of LKAB jobs at risk","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=9#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":1},"datePublished":"2024-04-11T18:00:04+10:00","dateModified":"2024-04-11T18:00:04+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=26820#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=26820#webpage"},"articleSection":"Bane NOR, Business, Infrastructure, Iron Ore Line, LKAB, Lule\u00e5, Malmbanan, Narvik, Norway, sweden, Trafikverket"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=26820#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=72#listItem","name":"Business"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=72#listItem","position":2,"name":"Business","item":"https:\/\/www.vibewire.com.au\/?cat=72","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=26820#listItem","name":"Lack of capacity along Iron Ore Line puts hundreds of LKAB jobs at risk"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=26820#listItem","position":3,"name":"Lack of capacity along Iron Ore Line puts hundreds of LKAB jobs at risk","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=72#listItem","name":"Business"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=26820\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=26820\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=9#author","url":"https:\/\/www.vibewire.com.au\/?author=9","name":"Marco Raimondi","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=26820#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/fc241b4d8352e3e7ca08ec32c4ebd712ae862e0499265d83515e97acb5510625?s=96&d=mm&r=g","width":96,"height":96,"caption":"Marco Raimondi"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=26820#webpage","url":"https:\/\/www.vibewire.com.au\/?p=26820","name":"Lack of capacity along Iron Ore Line puts hundreds of LKAB jobs at risk - VibeWire Magazine","description":"LKAB, the largest iron ore producer in Europe, said that some of its facilities might close unless capacity along the Iron Ore Line, or Malmbanan, doesn\u2019t improve significantly. \u201cLKAB is reviewing closure in either Kiruna or Svappavaara based on what would mean the least damage to the company\u201d, they said. Because of capacity issues, LKAB\u2026","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=26820#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=9#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=9#author"},"image":{"@type":"ImageObject","url":1,"@id":"https:\/\/www.vibewire.com.au\/?p=26820\/#mainImage"},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=26820#mainImage"},"datePublished":"2024-04-11T18:00:04+10:00","dateModified":"2024-04-11T18:00:04+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Lack of capacity along Iron Ore Line puts hundreds of LKAB jobs at risk - VibeWire Magazine","og:description":"LKAB, the largest iron ore producer in Europe, said that some of its facilities might close unless capacity along the Iron Ore Line, or Malmbanan, doesn\u2019t improve significantly. \u201cLKAB is reviewing closure in either Kiruna or Svappavaara based on what would mean the least damage to the company\u201d, they said. Because of capacity issues, LKAB\u2026","og:url":"https:\/\/www.vibewire.com.au\/?p=26820","article:published_time":"2024-04-11T08:00:04+00:00","article:modified_time":"2024-04-11T08:00:04+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Lack of capacity along Iron Ore Line puts hundreds of LKAB jobs at risk - VibeWire Magazine","twitter:description":"LKAB, the largest iron ore producer in Europe, said that some of its facilities might close unless capacity along the Iron Ore Line, or Malmbanan, doesn\u2019t improve significantly. \u201cLKAB is reviewing closure in either Kiruna or Svappavaara based on what would mean the least damage to the company\u201d, they said. Because of capacity issues, LKAB\u2026","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"26820","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-05-29 17:30:12","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-04-11 08:32:25","updated":"2026-05-29 17:30:12"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=72\" title=\"Business\">Business<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tLack of capacity along Iron Ore Line puts hundreds of LKAB jobs at risk\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Business","link":"https:\/\/www.vibewire.com.au\/?cat=72"},{"label":"Lack of capacity along Iron Ore Line puts hundreds of LKAB jobs at risk","link":"https:\/\/www.vibewire.com.au\/?p=26820"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/26820","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=26820"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/26820\/revisions"}],"predecessor-version":[{"id":26821,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/26820\/revisions\/26821"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=26820"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=26820"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=26820"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}