{"id":26622,"date":"2024-04-11T03:49:36","date_gmt":"2024-04-10T17:49:36","guid":{"rendered":"https:\/\/www.rtands.com\/?p=54075"},"modified":"2024-04-11T03:49:36","modified_gmt":"2024-04-10T17:49:36","slug":"mdot-maryland-transit-administration-awarded-5m-for-patapsco-pedestrian-bridge","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=26622","title":{"rendered":"MDOT Maryland Transit Administration Awarded $5M for Patapsco Pedestrian Bridge"},"content":{"rendered":"<p>BALTIMORE \u2013 To provide better access for Cherry Hill, Brooklyn, and Lansdowne residents to public transit, the MDOT MTA was awarded $5 million for the Patapsco Pedestrian\/Bicycle Bridge and trail.<\/p>\n<p>The post <a rel=\"nofollow\" href=\"https:\/\/www.rtands.com\/regulatory\/mdot-maryland-transit-administration-awarded-5m-for-patapsco-pedestrian-bridge\/\">MDOT Maryland Transit Administration Awarded $5M for Patapsco Pedestrian Bridge<\/a> appeared first on <a rel=\"nofollow\" href=\"https:\/\/www.rtands.com\/\">Railway Track and Structures<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>BALTIMORE \u2013 To provide better access for Cherry Hill, Brooklyn, and Lansdowne residents to public transit, the MDOT MTA was awarded $5 million for the Patapsco Pedestrian\/Bicycle Bridge and trail.<br \/>\nThe post MDOT Maryland Transit Administration Awarded $&#8230;<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[35,6736,2077,7657,51,6745,42],"tags":[],"class_list":["post-26622","post","type-post","status-publish","format-standard","hentry","category-breaking-news","category-maryland-department-of-transportation","category-maryland-transit-administration","category-omnibus-spending-bill","category-passenger-rail","category-pedestrian-bridge-work","category-regulatory"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/26622","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=26622"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/26622\/revisions"}],"predecessor-version":[{"id":26623,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/26622\/revisions\/26623"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=26622"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=26622"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=26622"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}