{"id":263674,"date":"2025-08-08T10:23:35","date_gmt":"2025-08-08T00:23:35","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=263674"},"modified":"2025-12-22T17:31:48","modified_gmt":"2025-12-22T07:31:48","slug":"shepparton-railway-line-could-shut-for-months-affecting-passenger-and-freight","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=263674","title":{"rendered":"Shepparton Railway Line could shut for months affecting passenger and freight"},"content":{"rendered":"\n<p>In a new benchmark for insane behaviour from Victoria\u2019s Transport Department a decision has been made to shut a major railway line for months. Commuters have been enduring constant shutdowns across the railway network managed poorly by V\/Line this time trains will be removed for 90 days from a major freight and passenger line.<\/p>\n\n\n\n<p>Victoria only knows one way of doing business and that is complete shutdowns for months at a time and many of those shutdowns do not provide the rail network with any real advantage.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>The Hurstbridge Line for example has experienced approximately 3 months of shutdown since January 2025 without benefit to the rail network or its passengers.<\/p>\n<\/blockquote>\n\n\n\n<p>How can it take 90 days of total shutdown to cary a signalling system for a major railway line?  Other rail lines in the state have been upgraded with a 90 day shutdown how can this be required for Shepparton?<\/p>\n\n\n\n<p>There is barely a day that goes by where a V\/Line regional service is not stopped or suspended or delayed.<\/p>\n\n\n\n<p>The misleading statements from Transport Victoria are designed to make passengers feel good about a shutdown when on most rail lines nationally and globally this type of shutdown length would be unnecessary and unwarranted.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>The Allan Labor Government\u2019s Shepparton Line Upgrade will undertake a ten day works blitz to deliver a new train control system \u2013 with Stage 3 of the project set to be completed later this year.<\/p>\n<\/blockquote>\n\n\n\n<p>Why do we need a new train control system when colour light signalling works just fine?  What is this costing the state when a signalling system is already in place and could merely be extended?<\/p>\n\n\n\n<p>These works are far in excess of what are required to allowing for the passing of trains and I ask Transport Victoria to explain what additional benefits this new signalling system will provide over and above the current approach to signalling on the line.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In a new benchmark for insane behaviour from Victoria\u2019s Transport Department a decision has been made to shut a major railway line for months.<\/p>\n","protected":false},"author":21,"featured_media":263675,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[47,17684,186],"tags":[993,13133,13134,8],"class_list":["post-263674","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-rail-news","category-transport-victoria","category-v-line","tag-melbourne","tag-shepparton","tag-shepparton-line-upgrades","tag-victoria"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/263674","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=263674"}],"version-history":[{"count":4,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/263674\/revisions"}],"predecessor-version":[{"id":263703,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/263674\/revisions\/263703"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/media\/263675"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=263674"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=263674"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=263674"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}