{"id":26124,"date":"2024-04-09T18:49:52","date_gmt":"2024-04-09T08:49:52","guid":{"rendered":"http:\/\/www.vibewire.com.au\/?guid=866555ec1b26a6149d6d0703eb532906"},"modified":"2024-04-09T18:49:52","modified_gmt":"2024-04-09T08:49:52","slug":"orr-gives-approval-for-enhancements-at-dore-totley-station","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=26124","title":{"rendered":"ORR gives approval for enhancements at Dore &amp; Totley station"},"content":{"rendered":"<p><span class=\"field field--name-title field--type-string field--label-hidden\">ORR gives approval for enhancements at Dore &#038; Totley station <\/span><br \/>\n<span class=\"field field--name-created field--type-created field--label-hidden\"><time datetime=\"2024-04-09T08:49:52+00:00\" title=\"Tuesday, 9 April, 2024 - 08:49\" class=\"datetime\">Tue, 09\/04\/2024 &#8211; 08:49<\/time><\/span><br \/>\n<span class=\"orr-published-date\">9 April 2024<\/span><\/p>\n<div class=\"field field--name-field-standfirst field--type-string-long field--label-hidden field__item\">The Office of Rail and Road (ORR) has authorised significant enhancements at Dore &#038; Totley railway station in Sheffield.<\/div>\n<div class=\"field field--name-field-cover-image field--type-entity-reference field--label-visually_hidden\">\n<div class=\"field__label visually-hidden\">Cover Image<\/div>\n<div class=\"field__item\">\n<article class=\"media media--type-image media--view-mode-demo-cover\">\n<div class=\"field field--name-field-media-image field--type-image field--label-visually_hidden\">\n<div class=\"field__label visually-hidden\">Image<\/div>\n<div class=\"field__item\">  <img decoding=\"async\" src=\"http:\/\/www.orr.gov.uk\/sites\/default\/files\/styles\/demo_cover\/public\/2024-04\/dore-station-news-cover.jpg?itok=JSVz_yP3\" width=\"1020\" height=\"575\" alt=\"Dore station platform\" loading=\"lazy\" class=\"image-style-demo-cover\" \/><\/div>\n<\/p><\/div>\n<\/article>\n<\/div><\/div>\n<div class=\"clearfix text-formatted field field--name-body field--type-text-with-summary field--label-visually_hidden\">\n<div class=\"field__label visually-hidden\">Body<\/div>\n<div class=\"field__item\"><\/div>\n<\/p><\/div>\n<div class=\"field field--name-field-components field--type-entity-reference-revisions field--label-visually_hidden\">\n<div class=\"field__label visually-hidden\">Components<\/div>\n<div class=\"field__items\">\n<div class=\"field__item\">\n<div class=\"paragraph paragraph--type--text paragraph--view-mode--default\">\n<div class=\"clearfix text-formatted field field--name-field-text field--type-text-long field--label-hidden field__item\">\n<div>\n<p paraid=\"1225593209\" paraeid=\"{73675c6a-1f2e-4fec-956d-8b47686a6b6c}{40}\">A new platform has been installed alongside a new footbridge providing lift and stair access for passengers. The new platform will serve passengers heading towards Manchester on new track, also authorised by ORR, on the Hope Valley Line between Sheffield and Manchester Piccadilly.\u00a0<\/p>\n<\/div>\n<div>\n<p paraid=\"2145214760\" paraeid=\"{73675c6a-1f2e-4fec-956d-8b47686a6b6c}{72}\">The improvements complete a set of upgrades to the Hope Valley Line. By removing bottlenecks caused by the single-track railway along part of the route, passenger trains will be able to overtake slower-moving freight trains, which should improve reliability.<\/p>\n<\/div>\n<div>\n<p paraid=\"189697363\" paraeid=\"{73675c6a-1f2e-4fec-956d-8b47686a6b6c}{128}\">ORR\u2019s authorisation is a key milestone. It confirms that the project has met standards covering health and safety, accessibility, environmental protection, and reliability and availability.\u00a0<\/p>\n<\/div>\n<div>\n<p paraid=\"1324934904\" paraeid=\"{73675c6a-1f2e-4fec-956d-8b47686a6b6c}{148}\"><a href=\"https:\/\/www.orr.gov.uk\/guidance-compliance\/rail\/health-safety\/laws\/interoperability\/authorisations\"  rel=\"noreferrer noopener\">ORR authorises new and improved railway stations<\/a>\u202flike Dore &#038; Totley station as part of its responsibility to authorise infrastructure and rolling stock that are new or have had a major upgrade or renewal. ORR has worked with Network Rail from the outset of the project to support them through the authorisation process, ensuring that important checks and surveys are carried out.<\/p>\n<\/div>\n<div>\n<p paraid=\"1055571496\" paraeid=\"{73675c6a-1f2e-4fec-956d-8b47686a6b6c}{187}\">Figures published by ORR show there were over 160,000 entries and exits from the station in 2022-2023.<\/p>\n<\/div>\n<div>\n<p paraid=\"208278893\" paraeid=\"{73675c6a-1f2e-4fec-956d-8b47686a6b6c}{203}\"><strong>Steve Fletcher, Deputy Director of Engineering and Asset Management at ORR, said:<\/strong>\u00a0<\/p>\n<\/div>\n<\/div><\/div>\n<\/div>\n<div class=\"field__item\">\n<div class=\"styling-options--alignment--right pull-quote-size--big paragraph paragraph--type--pull-quote paragraph--view-mode--default\">\n<div class=\"pull-quote-container\">\n<div class=\"pull-quote-text\">\n<div class=\"clearfix text-formatted field field--name-field-text field--type-text-long field--label-hidden field__item\">\n<p>\u201cThis is a significant upgrade for Dore &#038; Totley station and one of many such improvements that ORR will be working to authorise along the Hope Valley Line.\u00a0\u00a0<br \/>\u00a0<br \/>\u201cWe\u2019re pleased to have played our part in getting the station ready to open. Our team worked alongside Network Rail to support them through the authorisation process, just as we do for new trains and infrastructure across the country.\u201d\u00a0<\/p>\n<\/div><\/div>\n<\/p><\/div>\n<\/p><\/div>\n<\/div>\n<div class=\"field__item\">\n<div class=\"paragraph paragraph--type--text paragraph--view-mode--default\">\n<div class=\"clearfix text-formatted field field--name-field-text field--type-text-long field--label-hidden field__item\">\n<h2>Notes to Editors<\/h2>\n<ol>\n<li>Pictures of Network rail<\/li>\n<\/ol>\n<\/div><\/div>\n<\/div><\/div>\n<\/p><\/div>\n<div class=\"field field--name-field-related-links field--type-link field--label-above page__related page__related--links\">\n<div class=\"field__label\">Related links<\/div>\n<div class=\"field__items\">\n<div class=\"field__item\"><a href=\"http:\/\/www.orr.gov.uk\/guidance-compliance\/rail\/health-safety\/laws\/interoperability\/authorisations\">Interoperability authorisations<\/a><\/div>\n<\/p><\/div>\n<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>ORR gives approval for enhancements at Dore &amp; Totley station<br \/>\nTue, 09\/04\/2024 &#8211; 08:49<br \/>\n9 April 2024<\/p>\n<p>            The Office of Rail and Road (ORR) has authorised significant enhancements at Dore &amp; Totley railway station in Sheffield.<\/p>\n<p>    Cover&#8230;<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[],"tags":[],"class_list":["post-26124","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/26124","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=26124"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/26124\/revisions"}],"predecessor-version":[{"id":26127,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/26124\/revisions\/26127"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=26124"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=26124"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=26124"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}