{"id":25823,"date":"2024-04-09T00:54:34","date_gmt":"2024-04-08T14:54:34","guid":{"rendered":"https:\/\/www.rtands.com\/?p=53928"},"modified":"2024-04-09T00:54:34","modified_gmt":"2024-04-08T14:54:34","slug":"watch-smart-gauntlet-track-construction-for-petaluma-north-station","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=25823","title":{"rendered":"WATCH: SMART Gauntlet Track Construction for Petaluma North Station"},"content":{"rendered":"<p>PETALUMA, Calif. \u2013  From April 13th to 14th, SMART will have a partial system closure to install a gauntlet track for a new Petaluma North station.<\/p>\n<p>The post <a rel=\"nofollow\" href=\"https:\/\/www.rtands.com\/track-construction\/watch-smart-gauntlet-track-construction-for-petaluma-north-station\/\">WATCH: SMART Gauntlet Track Construction for Petaluma North Station<\/a> appeared first on <a rel=\"nofollow\" href=\"https:\/\/www.rtands.com\/\">Railway Track and Structures<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>PETALUMA, Calif. \u2013  From April 13th to 14th, SMART will have a partial system closure to install a gauntlet track for a new Petaluma North station.<br \/>\nThe post WATCH: SMART Gauntlet Track Construction for Petaluma North Station appeared first on Railway T&#8230;<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[2888,35,7512,49,1305,372,2807,58,33],"tags":[],"class_list":["post-25823","post","type-post","status-publish","format-standard","hentry","category-ballast-ties-rail","category-breaking-news","category-gauntlet-track","category-passenger","category-passenger-station","category-rapid-transit-light-rail","category-sonoma-marin-area-rail-transit-smart","category-track-construction","category-track-structure"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/25823","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=25823"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/25823\/revisions"}],"predecessor-version":[{"id":25825,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/25823\/revisions\/25825"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=25823"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=25823"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=25823"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}