{"id":252814,"date":"2025-07-17T17:51:59","date_gmt":"2025-07-17T07:51:59","guid":{"rendered":"https:\/\/railuk.com\/?p=179952"},"modified":"2025-07-17T17:51:59","modified_gmt":"2025-07-17T07:51:59","slug":"essential-improvement-work-to-close-railway-between-tunbridge-wells-hastings-and-bexhill-this-autumn","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=252814","title":{"rendered":"Essential improvement work to close railway between Tunbridge Wells, Hastings, and Bexhill this Autumn"},"content":{"rendered":"<p><a href=\"https:\/\/railuk.com\/travel\/essential-improvement-work-to-close-railway-between-tunbridge-wells-hastings-and-bexhill-this-autumn\/\" title=\"Essential improvement work to close railway between Tunbridge Wells, Hastings, and Bexhill this Autumn\" rel=\"nofollow\"><img loading=\"lazy\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/07\/17084929\/Southern-train-arrives-at-Hastings-station-Network-Rail-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\" style=\"display: block; margin-bottom: 5px; clear:both;max-width: 100%;\" link_thumbnail=\"1\" decoding=\"async\" srcset=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/07\/17084929\/Southern-train-arrives-at-Hastings-station-Network-Rail-485x360.jpg 485w, https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/07\/17084929\/Southern-train-arrives-at-Hastings-station-Network-Rail-80x60.jpg 80w\" sizes=\"auto, (max-width: 485px) 100vw, 485px\" \/><\/a><\/p>\n<p>Passengers travelling between Tunbridge Wells and Hastings and between Bexhill and Hastings are advised to plan ahead as a major programme of improvement work takes place between Saturday 25 October and Sunday 2 November 2025.<\/p>\n<p>Buses will replace Southeastern trains between Tunbridge Wells and Hastings, and Southern trains between Bexhill and Hastings for all nine days. Engineers will use the time to deliver a wide range of essential upgrades to improve the safety, and performance of the railway.<\/p>\n<p>In the Bo Peep and Hastings tunnels, brickwork will be repaired and drainage upgraded to stop leaks damaging railway equipment within the tunnel.<\/p>\n<p>Nearly a kilometre of old rails, sleepers, and ballast will be replaced between Etchingham and Mountfield, and the ballast, the stones that form the track bed, will be replaced between Castle Bridge and Riverhall, helping to reduce faults and delays.<\/p>\n<p>At Frant and Wadhurst, engineers will improve reliability by refurbishing the moveable rails known as switches, which allow trains to change path, as well as track circuits, the part of the signalling system that detects a train\u2019s location.<\/p>\n<p>Embankments and cuttings will be stabilised and strengthened at Frant and near Wadhurst, reducing the risk of landslips and delays.<\/p>\n<p>Vegetation will be cleared and rock anchors added to the cutting slope on the approaches to the Mountfield tunnel.<\/p>\n<p>The footbridge at West St Leonards station will be refurbished to keep it safe and open for passengers.<\/p>\n<p>Between Strawberry Hill and Frant, and from Crowhurst to Mountfield, overgrown vegetation will be cleared to keep track safe from debris and falling trees.<\/p>\n<p><strong>Impact<\/strong><\/p>\n<p>There will be no train services between Tunbridge Wells and Hastings, and between Bexhill and Hastings throughout the closure.<\/p>\n<p>A replacement bus service will operate between Tunbridge Wells and Hastings, and between Bexhill and Hastings. A Southern shuttle train service will run between Ashford and Hastings.<\/p>\n<p>David Davidson, chief operating officer for the South Eastern Railway, said: \u201cWe\u2019d like to thank passengers for their patience while we carry out this essential work.<\/p>\n<p>\u201cWe know that closures are disruptive, and we\u2019re doing everything we can to keep people moving with replacement buses and clear travel information. Getting work done over consecutive days allow us to do more work, more efficiently.<\/p>\n<p>\u201cWe\u2019ve invested significantly in the Hastings line in recent years to address challenges that go back to the line\u2019s construction over 170 years ago.<\/p>\n<p>\u201cThe work we are doing now is part our continued commitment to improving journeys for passengers\u201d.<\/p>\n<p>Southern\u2019s customer service director, Jenny Saunders said: \u201cThe line between Eastbourne and Ashford provides important connectivity for the towns along its route, and these works will help ensure the infrastructure stays reliable for years to come.<\/p>\n<p>\u201cThere is never a good time to close the railway, but we will have plenty of staff, and buses, to help passengers complete their journey.\u201d<\/p>\n<p>Image credit: Network Rail<\/p>\n","protected":false},"excerpt":{"rendered":"<p><a href=\"https:\/\/railuk.com\/travel\/essential-improvement-work-to-close-railway-between-tunbridge-wells-hastings-and-bexhill-this-autumn\/\" title=\"Essential improvement work to close railway between Tunbridge Wells, Hastings, and Bexhill this Autumn\" rel=\"nofollow\"><img loading=\"lazy\" decoding=\"async\" width=\"485\" height=\"360\" src=\"https:\/\/cdn.railuk.co\/wp-content\/uploads\/2025\/07\/17084929\/Southern-train-arrives-at-Hastings-station-Network-Rail-485x360.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"\"><\/a>Passengers travelling between Tunbridge Wells and Hastings and between Bexhill and Hastings are advised to plan ahead as a major programme of improvement work takes place between Saturday 25 October and Sunday 2 November 2025. Buses will replace Southeastern trains between Tunbridge Wells and Hastings, and Southern trains between Bexhill and Hastings for all nine [\u2026]<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[343,47,16031,913,85],"tags":[],"class_list":["post-252814","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-infrastructure","category-rail-news","category-structures","category-travel","category-uk"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/252814","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=252814"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/252814\/revisions"}],"predecessor-version":[{"id":252833,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/252814\/revisions\/252833"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=252814"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=252814"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=252814"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}