{"id":24957,"date":"2024-04-05T01:52:26","date_gmt":"2024-04-04T15:52:26","guid":{"rendered":"https:\/\/www.rtands.com\/?p=53820"},"modified":"2024-04-05T01:52:26","modified_gmt":"2024-04-04T15:52:26","slug":"metra-outlines-2024-construction-plan","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=24957","title":{"rendered":"Metra Outlines 2024 Construction Plan"},"content":{"rendered":"<p>CHICAGO \u2013\u00a0Metra\u00a0on April 3 detailed its\u00a0construction program for 2024, covering station, track, road crossing, bridge, and signal\/communications improvement projects along the Chicagoland commuter railroad\u2019s 11 lines totaling nearly 500 route-miles. In addition<\/p>\n<p>The post <a rel=\"nofollow\" href=\"https:\/\/www.rtands.com\/passenger\/commuter-regional\/metra-outlines-2024-construction-plan\/\">Metra Outlines 2024 Construction Plan<\/a> appeared first on <a rel=\"nofollow\" href=\"https:\/\/www.rtands.com\/\">Railway Track and Structures<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>CHICAGO \u2013\u00a0Metra\u00a0on April 3 detailed its\u00a0construction program for 2024, covering station, track, road crossing, bridge, and signal\/communications improvement projects along the Chicagoland commuter railroad\u2019s 11 lines totaling nearly 500 route-miles. In&#8230;<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[34,35,31,57,41,6343,32,49,47,42,43,63,33,46],"tags":[9],"class_list":["post-24957","post","type-post","status-publish","format-standard","hentry","category-bnsf","category-breaking-news","category-class-1","category-commuter-regional","category-grade-crossings","category-metra","category-news-and-opinion","category-passenger","category-rail-news","category-regulatory","category-safety","category-track-maintenance","category-track-structure","category-union-pacific","tag-freight"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/24957","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=24957"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/24957\/revisions"}],"predecessor-version":[{"id":24958,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/24957\/revisions\/24958"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=24957"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=24957"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=24957"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}