{"id":23882,"date":"2024-04-01T12:31:35","date_gmt":"2024-04-01T02:31:35","guid":{"rendered":"https:\/\/www.railexpress.com.au\/?p=115775"},"modified":"2024-04-01T12:31:35","modified_gmt":"2024-04-01T02:31:35","slug":"prepare-for-gold-coast-and-beenleigh-line-changes-over-easter-school-holidays","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=23882","title":{"rendered":"Prepare for Gold Coast and Beenleigh line changes over Easter school holidays"},"content":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/04\/230927-RIS-All-Site-Shoot-0199.jpeg\" alt=\"\" style=\"float:right; margin:0 0 10px 10px;\"><figcaption>Images\/Cross River Rail<\/figcaption><\/figure>\n<p><strong>People who travel on the <a href=\"https:\/\/www.railexpress.com.au\/gold-coast-station-contractors-finalised\/\">Gold Coast and Beenleigh<\/a> lines are being urged to allow extra time and plan their travel over the Easter school holidays in advance, with track closures required to allow for critical <a href=\"https:\/\/crossriverrail.qld.gov.au\/\">Cross River Rail<\/a> works.<\/strong><span id=\"more-115775\"><\/span><\/p>\n<p>Track closures on parts of the Gold Coast and Beenleigh lines will take place from Good Friday (29 March) to Sunday 14 April.<\/p>\n<p>Cross River Rail Delivery Authority CEO Graeme Newton said the partial closures allow crews to perform the crucial work safely and efficiently, which isn\u2019t possible with trains running.<\/p>\n<p>\u201cCross River Rail will transform the way we travel to, from and through South East Queensland in the future, but that means there are some impacts to travel and transport services during construction,\u201d Newton said.<\/p>\n<p>\u201cWhile the works are deliberately planned for during the quieter school holiday period, we understand some rail customers will be inconvenienced.<\/p>\n<p>\u201cWe thank customers for their patience as we continue delivering this city-shaping project.\u201d<\/p>\n<p>The works require continuous and intensive work in the rail corridor, and will include track reconfiguration, signalling and testing at the stations from Dutton Park to Salisbury.<\/p>\n<p>The scope of the works also includes installation of a new 45 tonne pedestrian overpass at Pimpama, structural steel works at Yeerongpilly, adding new tactiles and coping to improve accessibility at Dutton Park and building the overhead line structures at Clapham Yard.<\/p>\n<p>Plenty of alternative transport options will be available during the closures, including express and all stop rail replacement buses.<\/p>\n<p>To plan your journey, use the links below:<\/p>\n<ul>\n<li><a title=\"March 24 edm dld MyTranslink\"  rel=\"noopener\">Download the MyTranslink app;<\/a><\/li>\n<li><a title=\"March 24 edm visit Translink\"  rel=\"noopener\">Visit the Translink website; or<\/a><\/li>\n<li><a href=\"tel:131230\">Call 13 12 30.<\/a><\/li>\n<\/ul>\n<p>For more information,\u00a0<a href=\"https:\/\/crossriverrail.qld.gov.au\/news\/prepare-for-gold-coast-and-beenleigh-line-changes-over-easter-school-holidays\/travel-checker\">visit Cross River Rail\u2019s Travel Checker.<\/a><\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/prepare-for-gold-coast-and-beenleigh-line-changes-over-easter-school-holidays\/\">Prepare for Gold Coast and Beenleigh line changes over Easter school holidays<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>People who travel on the Gold Coast and Beenleigh lines are being urged to allow extra time and plan their \u2026 <\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/prepare-for-gold-coast-and-beenleigh-line-changes-over-easter-school-holidays\/\">Prepare for Gold Coast and Beenleigh line changes over Easter school holidays<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[165,163,58],"tags":[],"class_list":["post-23882","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-infrastructure","category-rail-industry-news-australia-new-zealand","category-track-construction"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"People who travel on the Gold Coast and Beenleigh lines are being urged to allow extra time and plan their \u2026 The post Prepare for Gold Coast and Beenleigh line changes over Easter school holidays appeared first on Rail Express.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=23882\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Prepare for Gold Coast and Beenleigh line changes over Easter school holidays - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"People who travel on the Gold Coast and Beenleigh lines are being urged to allow extra time and plan their \u2026 The post Prepare for Gold Coast and Beenleigh line changes over Easter school holidays appeared first on Rail Express.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=23882\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-04-01T02:31:35+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-04-01T02:31:35+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Prepare for Gold Coast and Beenleigh line changes over Easter school holidays - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"People who travel on the Gold Coast and Beenleigh lines are being urged to allow extra time and plan their \u2026 The post Prepare for Gold Coast and Beenleigh line changes over Easter school holidays appeared first on Rail Express.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=23882#blogposting\",\"name\":\"Prepare for Gold Coast and Beenleigh line changes over Easter school holidays - VibeWire Magazine\",\"headline\":\"Prepare for Gold Coast and Beenleigh line changes over Easter school holidays\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1},\"datePublished\":\"2024-04-01T12:31:35+10:00\",\"dateModified\":\"2024-04-01T12:31:35+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=23882#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=23882#webpage\"},\"articleSection\":\"Industry Infrastructure, Rail industry news (Australia, New Zealand), Track Construction\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=23882#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=58#listItem\",\"name\":\"Track Construction\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=58#listItem\",\"position\":2,\"name\":\"Track Construction\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=58\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=23882#listItem\",\"name\":\"Prepare for Gold Coast and Beenleigh line changes over Easter school holidays\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=23882#listItem\",\"position\":3,\"name\":\"Prepare for Gold Coast and Beenleigh line changes over Easter school holidays\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=58#listItem\",\"name\":\"Track Construction\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=23882\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=23882\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=23882#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=23882#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=23882\",\"name\":\"Prepare for Gold Coast and Beenleigh line changes over Easter school holidays - VibeWire Magazine\",\"description\":\"People who travel on the Gold Coast and Beenleigh lines are being urged to allow extra time and plan their \\u2026 The post Prepare for Gold Coast and Beenleigh line changes over Easter school holidays appeared first on Rail Express.\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=23882#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1,\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=23882\\\/#mainImage\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=23882#mainImage\"},\"datePublished\":\"2024-04-01T12:31:35+10:00\",\"dateModified\":\"2024-04-01T12:31:35+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Prepare for Gold Coast and Beenleigh line changes over Easter school holidays - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Prepare for Gold Coast and Beenleigh line changes over Easter school holidays - VibeWire Magazine","description":"People who travel on the Gold Coast and Beenleigh lines are being urged to allow extra time and plan their \u2026 The post Prepare for Gold Coast and Beenleigh line changes over Easter school holidays appeared first on Rail Express.","canonical_url":"https:\/\/www.vibewire.com.au\/?p=23882","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=23882#blogposting","name":"Prepare for Gold Coast and Beenleigh line changes over Easter school holidays - VibeWire Magazine","headline":"Prepare for Gold Coast and Beenleigh line changes over Easter school holidays","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":1},"datePublished":"2024-04-01T12:31:35+10:00","dateModified":"2024-04-01T12:31:35+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=23882#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=23882#webpage"},"articleSection":"Industry Infrastructure, Rail industry news (Australia, New Zealand), Track Construction"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=23882#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=58#listItem","name":"Track Construction"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=58#listItem","position":2,"name":"Track Construction","item":"https:\/\/www.vibewire.com.au\/?cat=58","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=23882#listItem","name":"Prepare for Gold Coast and Beenleigh line changes over Easter school holidays"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=23882#listItem","position":3,"name":"Prepare for Gold Coast and Beenleigh line changes over Easter school holidays","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=58#listItem","name":"Track Construction"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=23882\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=23882\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=23882#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=23882#webpage","url":"https:\/\/www.vibewire.com.au\/?p=23882","name":"Prepare for Gold Coast and Beenleigh line changes over Easter school holidays - VibeWire Magazine","description":"People who travel on the Gold Coast and Beenleigh lines are being urged to allow extra time and plan their \u2026 The post Prepare for Gold Coast and Beenleigh line changes over Easter school holidays appeared first on Rail Express.","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=23882#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"image":{"@type":"ImageObject","url":1,"@id":"https:\/\/www.vibewire.com.au\/?p=23882\/#mainImage"},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=23882#mainImage"},"datePublished":"2024-04-01T12:31:35+10:00","dateModified":"2024-04-01T12:31:35+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Prepare for Gold Coast and Beenleigh line changes over Easter school holidays - VibeWire Magazine","og:description":"People who travel on the Gold Coast and Beenleigh lines are being urged to allow extra time and plan their \u2026 The post Prepare for Gold Coast and Beenleigh line changes over Easter school holidays appeared first on Rail Express.","og:url":"https:\/\/www.vibewire.com.au\/?p=23882","article:published_time":"2024-04-01T02:31:35+00:00","article:modified_time":"2024-04-01T02:31:35+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Prepare for Gold Coast and Beenleigh line changes over Easter school holidays - VibeWire Magazine","twitter:description":"People who travel on the Gold Coast and Beenleigh lines are being urged to allow extra time and plan their \u2026 The post Prepare for Gold Coast and Beenleigh line changes over Easter school holidays appeared first on Rail Express.","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"23882","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-05-26 04:17:41","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-04-01 03:50:51","updated":"2026-05-26 04:17:41"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=58\" title=\"Track Construction\">Track Construction<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tPrepare for Gold Coast and Beenleigh line changes over Easter school holidays\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Track Construction","link":"https:\/\/www.vibewire.com.au\/?cat=58"},{"label":"Prepare for Gold Coast and Beenleigh line changes over Easter school holidays","link":"https:\/\/www.vibewire.com.au\/?p=23882"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/23882","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=23882"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/23882\/revisions"}],"predecessor-version":[{"id":23883,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/23882\/revisions\/23883"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=23882"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=23882"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=23882"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}