{"id":23209,"date":"2024-03-28T23:59:48","date_gmt":"2024-03-28T13:59:48","guid":{"rendered":"https:\/\/www.rtands.com\/?p=53575"},"modified":"2024-03-28T23:59:48","modified_gmt":"2024-03-28T13:59:48","slug":"trimets-max-blue-line-disruption-in-april-for-rail-crossing-upgrades","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=23209","title":{"rendered":"TriMet\u2019s MAX Blue Line Disruption in April for Rail Crossing Upgrades"},"content":{"rendered":"<p>PORTLAND, Ore. \u2013 A section of Gresham\u2019s MAX Blue Line will be closed for a week in April to allow for rail crossing upgrades.<\/p>\n<p>The post <a rel=\"nofollow\" href=\"https:\/\/www.rtands.com\/track-maintenance\/trimets-max-blue-line-disruption-in-april-for-rail-crossing-upgrades\/\">TriMet\u2019s MAX Blue Line Disruption in April for Rail Crossing Upgrades<\/a> appeared first on <a rel=\"nofollow\" href=\"https:\/\/www.rtands.com\/\">Railway Track and Structures<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>PORTLAND, Ore. \u2013 A section of Gresham\u2019s MAX Blue Line will be closed for a week in April to allow for rail crossing upgrades.<br \/>\nThe post TriMet\u2019s MAX Blue Line Disruption in April for Rail Crossing Upgrades appeared first on Railway Track and Structures&#8230;.<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[2888,35,57,6993,62,49,51,1813,63,33,6994],"tags":[],"class_list":["post-23209","post","type-post","status-publish","format-standard","hentry","category-ballast-ties-rail","category-breaking-news","category-commuter-regional","category-gresham-blue-line","category-on-track-maintenance","category-passenger","category-passenger-rail","category-rail-crossing-upgrades","category-track-maintenance","category-track-structure","category-trimet-max-blue-line-improvements-project"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/23209","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=23209"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/23209\/revisions"}],"predecessor-version":[{"id":23210,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/23209\/revisions\/23210"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=23209"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=23209"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=23209"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}