{"id":22857,"date":"2024-03-27T09:37:30","date_gmt":"2024-03-26T23:37:30","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=22857"},"modified":"2024-03-27T09:37:30","modified_gmt":"2024-03-26T23:37:30","slug":"contractors-shortlisted-for-queensland-gold-coast-line-upgrade","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=22857","title":{"rendered":"Contractors shortlisted for Queensland Gold Coast line upgrade"},"content":{"rendered":"<p>AUSTRALIA\u2019s Queensland government has shortlisted contractors to tender for three works packages for the Logan and Gold Coast Faster Rail project, which will quadruple the 20km section of the Brisbane &#8211; Gold Coast line between Kuraby and Beenleigh.<\/p>\n<p>As well as boosting capacity, the project will cut journey times and improve safety by replacing three level crossings with road bridges and eliminating two additional crossings. Stations will also be upgraded.<\/p>\n<p>The shortlisted consortia selected for the three work packages comprise:<\/p>\n<p>LGC Rail Package track quadrupling package: ActivUs consortium consisting of CPB Contractors, Acciona Contractors, UGL Engineering, SMEC Australia and WSP Australia; and the Activate consortium comprising John Holland Queensland, Aurecon Australasia and Aecom<\/p>\n<p>LGC OLCR Package: Beilby Holdings with JF Hull Holdings; and BMD Constructions with Fulton Hogan Construction, and<\/p>\n<p>the $A 173.8m ($US 114m) Loganlea Station Relocation Project: ADCO Construction, DT Infrastructure, and a joint venture of Martinus Rail and Degnan.<\/p>\n<p>The successful bidders will be announced later this year.<\/p>\n<p>The entire Logan and Gold Coast Faster Rail project is estimated to cost $A 5.75bn and will be funded jointly on a 50:50 basis by the Queensland and Australian governments.<\/p>\n<p><em>For detailed data on Australasian rail projects, subscribe to <a href=\"http:\/\/www.irjpro.com\/\" target=\"_blank\" rel=\"noopener\">IRJ Pro<\/a>.<\/em><\/p>\n<p>The post <a href=\"https:\/\/www.railjournal.com\/regions\/australia-nz\/contractors-shortlisted-for-queensland-gold-coast-line-upgrade\/\">Contractors shortlisted for Queensland Gold Coast line upgrade<\/a> appeared first on <a href=\"https:\/\/www.railjournal.com\/\">International Railway Journal<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>AUSTRALIA\u2019s Queensland government has shortlisted contractors to tender for three works packages for the Logan and Gold Coast Faster Rail project, which will quadruple the [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[47,5],"tags":[],"class_list":["post-22857","post","type-post","status-publish","format-standard","hentry","category-rail-news","category-transport"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"AUSTRALIA\u2019s Queensland government has shortlisted contractors to tender for three works packages for the Logan and Gold Coast Faster Rail project, which will quadruple the 20km section of the Brisbane - Gold Coast line between Kuraby and Beenleigh. As well as boosting capacity, the project will cut journey times and improve safety by replacing three\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=22857\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Contractors shortlisted for Queensland Gold Coast line upgrade - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"AUSTRALIA\u2019s Queensland government has shortlisted contractors to tender for three works packages for the Logan and Gold Coast Faster Rail project, which will quadruple the 20km section of the Brisbane - Gold Coast line between Kuraby and Beenleigh. As well as boosting capacity, the project will cut journey times and improve safety by replacing three\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=22857\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-03-26T23:37:30+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-03-26T23:37:30+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Contractors shortlisted for Queensland Gold Coast line upgrade - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"AUSTRALIA\u2019s Queensland government has shortlisted contractors to tender for three works packages for the Logan and Gold Coast Faster Rail project, which will quadruple the 20km section of the Brisbane - Gold Coast line between Kuraby and Beenleigh. As well as boosting capacity, the project will cut journey times and improve safety by replacing three\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=22857#blogposting\",\"name\":\"Contractors shortlisted for Queensland Gold Coast line upgrade - VibeWire Magazine\",\"headline\":\"Contractors shortlisted for Queensland Gold Coast line upgrade\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#articleImage\",\"width\":1028,\"height\":930},\"datePublished\":\"2024-03-27T09:37:30+10:00\",\"dateModified\":\"2024-03-27T09:37:30+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=22857#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=22857#webpage\"},\"articleSection\":\"Rail News, TRANSPORT\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=22857#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=5#listItem\",\"name\":\"TRANSPORT\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=5#listItem\",\"position\":2,\"name\":\"TRANSPORT\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=5\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=22857#listItem\",\"name\":\"Contractors shortlisted for Queensland Gold Coast line upgrade\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=22857#listItem\",\"position\":3,\"name\":\"Contractors shortlisted for Queensland Gold Coast line upgrade\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=5#listItem\",\"name\":\"TRANSPORT\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=22857\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=22857\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=22857#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=22857\",\"name\":\"Contractors shortlisted for Queensland Gold Coast line upgrade - VibeWire Magazine\",\"description\":\"AUSTRALIA\\u2019s Queensland government has shortlisted contractors to tender for three works packages for the Logan and Gold Coast Faster Rail project, which will quadruple the 20km section of the Brisbane - Gold Coast line between Kuraby and Beenleigh. As well as boosting capacity, the project will cut journey times and improve safety by replacing three\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=22857#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"datePublished\":\"2024-03-27T09:37:30+10:00\",\"dateModified\":\"2024-03-27T09:37:30+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Contractors shortlisted for Queensland Gold Coast line upgrade - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Contractors shortlisted for Queensland Gold Coast line upgrade - VibeWire Magazine","description":"AUSTRALIA\u2019s Queensland government has shortlisted contractors to tender for three works packages for the Logan and Gold Coast Faster Rail project, which will quadruple the 20km section of the Brisbane - Gold Coast line between Kuraby and Beenleigh. As well as boosting capacity, the project will cut journey times and improve safety by replacing three","canonical_url":"https:\/\/www.vibewire.com.au\/?p=22857","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=22857#blogposting","name":"Contractors shortlisted for Queensland Gold Coast line upgrade - VibeWire Magazine","headline":"Contractors shortlisted for Queensland Gold Coast line upgrade","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/#articleImage","width":1028,"height":930},"datePublished":"2024-03-27T09:37:30+10:00","dateModified":"2024-03-27T09:37:30+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=22857#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=22857#webpage"},"articleSection":"Rail News, TRANSPORT"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=22857#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=5#listItem","name":"TRANSPORT"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=5#listItem","position":2,"name":"TRANSPORT","item":"https:\/\/www.vibewire.com.au\/?cat=5","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=22857#listItem","name":"Contractors shortlisted for Queensland Gold Coast line upgrade"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=22857#listItem","position":3,"name":"Contractors shortlisted for Queensland Gold Coast line upgrade","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=5#listItem","name":"TRANSPORT"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=22857\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=22857\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=22857#webpage","url":"https:\/\/www.vibewire.com.au\/?p=22857","name":"Contractors shortlisted for Queensland Gold Coast line upgrade - VibeWire Magazine","description":"AUSTRALIA\u2019s Queensland government has shortlisted contractors to tender for three works packages for the Logan and Gold Coast Faster Rail project, which will quadruple the 20km section of the Brisbane - Gold Coast line between Kuraby and Beenleigh. As well as boosting capacity, the project will cut journey times and improve safety by replacing three","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=22857#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"datePublished":"2024-03-27T09:37:30+10:00","dateModified":"2024-03-27T09:37:30+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Contractors shortlisted for Queensland Gold Coast line upgrade - VibeWire Magazine","og:description":"AUSTRALIA\u2019s Queensland government has shortlisted contractors to tender for three works packages for the Logan and Gold Coast Faster Rail project, which will quadruple the 20km section of the Brisbane - Gold Coast line between Kuraby and Beenleigh. As well as boosting capacity, the project will cut journey times and improve safety by replacing three","og:url":"https:\/\/www.vibewire.com.au\/?p=22857","article:published_time":"2024-03-26T23:37:30+00:00","article:modified_time":"2024-03-26T23:37:30+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Contractors shortlisted for Queensland Gold Coast line upgrade - VibeWire Magazine","twitter:description":"AUSTRALIA\u2019s Queensland government has shortlisted contractors to tender for three works packages for the Logan and Gold Coast Faster Rail project, which will quadruple the 20km section of the Brisbane - Gold Coast line between Kuraby and Beenleigh. As well as boosting capacity, the project will cut journey times and improve safety by replacing three","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"22857","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-05-25 21:01:48","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-03-27 09:41:33","updated":"2026-05-25 21:01:48"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=5\" title=\"TRANSPORT\">TRANSPORT<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tContractors shortlisted for Queensland Gold Coast line upgrade\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"TRANSPORT","link":"https:\/\/www.vibewire.com.au\/?cat=5"},{"label":"Contractors shortlisted for Queensland Gold Coast line upgrade","link":"https:\/\/www.vibewire.com.au\/?p=22857"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/22857","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=22857"}],"version-history":[{"count":0,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/22857\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=22857"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=22857"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=22857"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}