{"id":221236,"date":"2025-05-21T21:09:00","date_gmt":"2025-05-21T11:09:00","guid":{"rendered":"http:\/\/www.vibewire.com.au\/?guid=f6b787e393822e056bbf704642643bd8"},"modified":"2025-05-21T21:09:00","modified_gmt":"2025-05-21T11:09:00","slug":"structural-steelwork-completed-ready-for-first-part-of-m6-viaduct-deck","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=221236","title":{"rendered":"Structural steelwork completed ready for first part of M6 viaduct deck"},"content":{"rendered":"<p><img loading=\"lazy\" width=\"640\" height=\"360\" src=\"https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2025\/05\/Aerial-view-of-the-first-section-of-the-M6-South-viaduct-being-assembled-May-2025.jpg\" class=\"webfeedsFeaturedVisual wp-post-image\" alt=\"The first section of the south viaduct being assembled. \/\/ Credit: HS2\" style=\"display: block; margin: auto; margin-bottom: 10px; max-width: 100%;\" decoding=\"async\" srcset=\"https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2025\/05\/Aerial-view-of-the-first-section-of-the-M6-South-viaduct-being-assembled-May-2025.jpg 1280w, https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2025\/05\/Aerial-view-of-the-first-section-of-the-M6-South-viaduct-being-assembled-May-2025-300x169.jpg 300w, https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2025\/05\/Aerial-view-of-the-first-section-of-the-M6-South-viaduct-being-assembled-May-2025-768x432.jpg 768w, https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2025\/05\/Aerial-view-of-the-first-section-of-the-M6-South-viaduct-being-assembled-May-2025-750x422.jpg 750w, https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2025\/05\/Aerial-view-of-the-first-section-of-the-M6-South-viaduct-being-assembled-May-2025-624x351.jpg 624w, https:\/\/www.railadvent.co.uk\/wp-content\/uploads\/2025\/05\/Aerial-view-of-the-first-section-of-the-M6-South-viaduct-being-assembled-May-2025-600x338.jpg 600w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/>The first section of structural steelwork has been completed for two viaducts that will carry HS2 over the M6 near Birmingham Airport. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>The first section of structural steelwork has been completed for two viaducts that will carry HS2 over the M6 near Birmingham Airport. <\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[2406,1089,343,2309,47],"tags":[12406],"class_list":["post-221236","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-birmingham","category-hs2","category-infrastructure","category-network","category-rail-news","tag-rail-advent"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/221236","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=221236"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/221236\/revisions"}],"predecessor-version":[{"id":221237,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/221236\/revisions\/221237"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=221236"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=221236"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=221236"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}