{"id":21741,"date":"2024-03-22T04:36:39","date_gmt":"2024-03-21T18:36:39","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=21741"},"modified":"2024-03-22T04:36:39","modified_gmt":"2024-03-21T18:36:39","slug":"big-boy-tender-restoration-continues-at-silvis","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=21741","title":{"rendered":"\u2018Big Boy\u2019 Tender Restoration Continues at Silvis"},"content":{"rendered":"<p><span>By Railfan &amp; Railroad Staff<\/span><\/p>\n<p><span>Work on the tender off of Union Pacific \u201cBig Boy\u201d 4-8-8-4 4014 is continuing at Railroading Heritage of Midwest America this winter.<\/span><\/p>\n<p><span>When 4014 reentered service in 2019, it did so with the tender off of \u201cChallenger\u201d 4-6-6-4 3985, which had already been converted to hold oil. Switching tenders was very common in the steam era, including between different types and classes of steam locomotives. When 3985 was donated to RRHMA a few years ago, part of the deal was that the Silvis, Ill.-based non-profit would rebuild 4014\u2019s tender and then send it back to UP, which in turn would return the one off 3985.\u00a0<\/span><\/p>\n<p><span>Recently the tender was sandblasted and received a coat of primer. Now it is receiving wheel work before being returned to UP. <\/span><\/p>\n<p>The post <a href=\"https:\/\/railfan.com\/big-boy-tender-restoration-continues-at-silvis\/\">\u2018Big Boy\u2019 Tender Restoration Continues at Silvis<\/a> appeared first on <a href=\"https:\/\/railfan.com\/\">Railfan &amp; Railroad Magazine<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>By Railfan &amp; Railroad Staff Work on the tender off of Union Pacific \u201cBig Boy\u201d 4-8-8-4 4014 is continuing at Railroading Heritage of Midwest America [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":21742,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[47],"tags":[11],"class_list":["post-21741","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-rail-news","tag-usa"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.9 - aioseo.com -->\n\t<meta name=\"description\" content=\"By Railfan &amp; Railroad Staff Work on the tender off of Union Pacific \u201cBig Boy\u201d 4-8-8-4 4014 is continuing at Railroading Heritage of Midwest America this winter. When 4014 reentered service in 2019, it did so with the tender off of \u201cChallenger\u201d 4-6-6-4 3985, which had already been converted to hold oil. Switching tenders was\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=21741\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.9\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"\u2018Big Boy\u2019 Tender Restoration Continues at Silvis - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"By Railfan &amp; Railroad Staff Work on the tender off of Union Pacific \u201cBig Boy\u201d 4-8-8-4 4014 is continuing at Railroading Heritage of Midwest America this winter. When 4014 reentered service in 2019, it did so with the tender off of \u201cChallenger\u201d 4-6-6-4 3985, which had already been converted to hold oil. Switching tenders was\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=21741\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-03-21T18:36:39+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-03-21T18:36:39+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"\u2018Big Boy\u2019 Tender Restoration Continues at Silvis - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"By Railfan &amp; Railroad Staff Work on the tender off of Union Pacific \u201cBig Boy\u201d 4-8-8-4 4014 is continuing at Railroading Heritage of Midwest America this winter. When 4014 reentered service in 2019, it did so with the tender off of \u201cChallenger\u201d 4-6-6-4 3985, which had already been converted to hold oil. Switching tenders was\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21741#blogposting\",\"name\":\"\\u2018Big Boy\\u2019 Tender Restoration Continues at Silvis - VibeWire Magazine\",\"headline\":\"\\u2018Big Boy\\u2019 Tender Restoration Continues at Silvis\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/03\\\/Union-Pacific-4014-800-QjTEKe.jpeg\",\"width\":800,\"height\":591},\"datePublished\":\"2024-03-22T04:36:39+10:00\",\"dateModified\":\"2024-03-22T04:36:39+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21741#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21741#webpage\"},\"articleSection\":\"Rail News, USA\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21741#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21741#listItem\",\"name\":\"\\u2018Big Boy\\u2019 Tender Restoration Continues at Silvis\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21741#listItem\",\"position\":3,\"name\":\"\\u2018Big Boy\\u2019 Tender Restoration Continues at Silvis\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21741\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21741\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21741#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21741\",\"name\":\"\\u2018Big Boy\\u2019 Tender Restoration Continues at Silvis - VibeWire Magazine\",\"description\":\"By Railfan & Railroad Staff Work on the tender off of Union Pacific \\u201cBig Boy\\u201d 4-8-8-4 4014 is continuing at Railroading Heritage of Midwest America this winter. When 4014 reentered service in 2019, it did so with the tender off of \\u201cChallenger\\u201d 4-6-6-4 3985, which had already been converted to hold oil. Switching tenders was\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21741#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/03\\\/Union-Pacific-4014-800-QjTEKe.jpeg\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21741\\\/#mainImage\",\"width\":800,\"height\":591},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21741#mainImage\"},\"datePublished\":\"2024-03-22T04:36:39+10:00\",\"dateModified\":\"2024-03-22T04:36:39+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>\u2018Big Boy\u2019 Tender Restoration Continues at Silvis - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"\u2018Big Boy\u2019 Tender Restoration Continues at Silvis - VibeWire Magazine","description":"By Railfan & Railroad Staff Work on the tender off of Union Pacific \u201cBig Boy\u201d 4-8-8-4 4014 is continuing at Railroading Heritage of Midwest America this winter. When 4014 reentered service in 2019, it did so with the tender off of \u201cChallenger\u201d 4-6-6-4 3985, which had already been converted to hold oil. Switching tenders was","canonical_url":"https:\/\/www.vibewire.com.au\/?p=21741","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=21741#blogposting","name":"\u2018Big Boy\u2019 Tender Restoration Continues at Silvis - VibeWire Magazine","headline":"\u2018Big Boy\u2019 Tender Restoration Continues at Silvis","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/03\/Union-Pacific-4014-800-QjTEKe.jpeg","width":800,"height":591},"datePublished":"2024-03-22T04:36:39+10:00","dateModified":"2024-03-22T04:36:39+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=21741#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=21741#webpage"},"articleSection":"Rail News, USA"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=21741#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=21741#listItem","name":"\u2018Big Boy\u2019 Tender Restoration Continues at Silvis"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=21741#listItem","position":3,"name":"\u2018Big Boy\u2019 Tender Restoration Continues at Silvis","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=21741\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=21741\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=21741#webpage","url":"https:\/\/www.vibewire.com.au\/?p=21741","name":"\u2018Big Boy\u2019 Tender Restoration Continues at Silvis - VibeWire Magazine","description":"By Railfan & Railroad Staff Work on the tender off of Union Pacific \u201cBig Boy\u201d 4-8-8-4 4014 is continuing at Railroading Heritage of Midwest America this winter. When 4014 reentered service in 2019, it did so with the tender off of \u201cChallenger\u201d 4-6-6-4 3985, which had already been converted to hold oil. Switching tenders was","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=21741#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/03\/Union-Pacific-4014-800-QjTEKe.jpeg","@id":"https:\/\/www.vibewire.com.au\/?p=21741\/#mainImage","width":800,"height":591},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=21741#mainImage"},"datePublished":"2024-03-22T04:36:39+10:00","dateModified":"2024-03-22T04:36:39+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"\u2018Big Boy\u2019 Tender Restoration Continues at Silvis - VibeWire Magazine","og:description":"By Railfan &amp; Railroad Staff Work on the tender off of Union Pacific \u201cBig Boy\u201d 4-8-8-4 4014 is continuing at Railroading Heritage of Midwest America this winter. When 4014 reentered service in 2019, it did so with the tender off of \u201cChallenger\u201d 4-6-6-4 3985, which had already been converted to hold oil. Switching tenders was","og:url":"https:\/\/www.vibewire.com.au\/?p=21741","article:published_time":"2024-03-21T18:36:39+00:00","article:modified_time":"2024-03-21T18:36:39+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"\u2018Big Boy\u2019 Tender Restoration Continues at Silvis - VibeWire Magazine","twitter:description":"By Railfan &amp; Railroad Staff Work on the tender off of Union Pacific \u201cBig Boy\u201d 4-8-8-4 4014 is continuing at Railroading Heritage of Midwest America this winter. When 4014 reentered service in 2019, it did so with the tender off of \u201cChallenger\u201d 4-6-6-4 3985, which had already been converted to hold oil. Switching tenders was","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"21741","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-05-25 12:23:26","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-03-22 04:37:03","updated":"2026-05-25 12:23:26"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\u2018Big Boy\u2019 Tender Restoration Continues at Silvis\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"\u2018Big Boy\u2019 Tender Restoration Continues at Silvis","link":"https:\/\/www.vibewire.com.au\/?p=21741"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/21741","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=21741"}],"version-history":[{"count":0,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/21741\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/media\/21742"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=21741"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=21741"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=21741"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}