{"id":21463,"date":"2024-03-21T03:36:44","date_gmt":"2024-03-20T17:36:44","guid":{"rendered":"https:\/\/www.vibewire.com.au\/?p=21463"},"modified":"2024-03-21T03:36:44","modified_gmt":"2024-03-20T17:36:44","slug":"caltrain-tests-overhead-wire-electrification-on-track-for-fall","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=21463","title":{"rendered":"Caltrain Tests Overhead Wire; Electrification On Track for Fall"},"content":{"rendered":"<p><span>By Railfan &amp; Railroad Staff<\/span><\/p>\n<p><span>Caltrain met another milestone in the electrification of its system, as it successfully tested electric trains and overhead wires between Redwood City and Mountain View for the first time.\u00a0<\/span><\/p>\n<p><span>Caltrain is currently spending more than $2 billion to electrify its main line between San Francisco and Silicon Valley. The electrification is expected to be completed this fall. The system will use Stadler-built EMU trains and will lead to the retirement of its fleet of mostly F40 locomotives.\u00a0<\/span><\/p>\n<p><span>Live tests started at 20 miles per hour, to ensure the overhead wire and train were properly connected. Once the connection was successfully established, the train increased speed to the corridor\u2019s 79-mile-per-hour maximum limit.<\/span><\/p>\n<p><span>Each of the 23 electric trainsets must complete 1000 miles of testing before it is allowed to carry passengers. Initial tests were conducted between Santa Clara and College Park Stations on the Santa Clara Drill Track, but Caltrain has steadily been expanding the available testing area from San Jose to Mountain View. With this live run, testing can now take place from San Jose to Redwood City, further accelerating the process and keeping the launch of service on schedule for fall 2024.\u00a0<\/span><\/p>\n<p>The post <a href=\"https:\/\/railfan.com\/caltrain-tests-overhead-wire-electrification-on-track-for-fall\/\">Caltrain Tests Overhead Wire; Electrification On Track for Fall<\/a> appeared first on <a href=\"https:\/\/railfan.com\/\">Railfan &amp; Railroad Magazine<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>By Railfan &amp; Railroad Staff Caltrain met another milestone in the electrification of its system, as it successfully tested electric trains and overhead wires between [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":21464,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[47],"tags":[11],"class_list":["post-21463","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-rail-news","tag-usa"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"By Railfan &amp; Railroad Staff Caltrain met another milestone in the electrification of its system, as it successfully tested electric trains and overhead wires between Redwood City and Mountain View for the first time. Caltrain is currently spending more than $2 billion to electrify its main line between San Francisco and Silicon Valley. The electrification\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=21463\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Caltrain Tests Overhead Wire; Electrification On Track for Fall - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"By Railfan &amp; Railroad Staff Caltrain met another milestone in the electrification of its system, as it successfully tested electric trains and overhead wires between Redwood City and Mountain View for the first time. Caltrain is currently spending more than $2 billion to electrify its main line between San Francisco and Silicon Valley. The electrification\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=21463\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-03-20T17:36:44+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-03-20T17:36:44+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Caltrain Tests Overhead Wire; Electrification On Track for Fall - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"By Railfan &amp; Railroad Staff Caltrain met another milestone in the electrification of its system, as it successfully tested electric trains and overhead wires between Redwood City and Mountain View for the first time. Caltrain is currently spending more than $2 billion to electrify its main line between San Francisco and Silicon Valley. The electrification\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21463#blogposting\",\"name\":\"Caltrain Tests Overhead Wire; Electrification On Track for Fall - VibeWire Magazine\",\"headline\":\"Caltrain Tests Overhead Wire; Electrification On Track for Fall\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/03\\\/CalTrain-MWxsSt.png\",\"width\":800,\"height\":458},\"datePublished\":\"2024-03-21T03:36:44+10:00\",\"dateModified\":\"2024-03-21T03:36:44+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21463#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21463#webpage\"},\"articleSection\":\"Rail News, USA\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21463#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"position\":2,\"name\":\"Rail News\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21463#listItem\",\"name\":\"Caltrain Tests Overhead Wire; Electrification On Track for Fall\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21463#listItem\",\"position\":3,\"name\":\"Caltrain Tests Overhead Wire; Electrification On Track for Fall\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=47#listItem\",\"name\":\"Rail News\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21463\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21463\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21463#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21463\",\"name\":\"Caltrain Tests Overhead Wire; Electrification On Track for Fall - VibeWire Magazine\",\"description\":\"By Railfan & Railroad Staff Caltrain met another milestone in the electrification of its system, as it successfully tested electric trains and overhead wires between Redwood City and Mountain View for the first time. Caltrain is currently spending more than $2 billion to electrify its main line between San Francisco and Silicon Valley. The electrification\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21463#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=0#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/03\\\/CalTrain-MWxsSt.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21463\\\/#mainImage\",\"width\":800,\"height\":458},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21463#mainImage\"},\"datePublished\":\"2024-03-21T03:36:44+10:00\",\"dateModified\":\"2024-03-21T03:36:44+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Caltrain Tests Overhead Wire; Electrification On Track for Fall - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Caltrain Tests Overhead Wire; Electrification On Track for Fall - VibeWire Magazine","description":"By Railfan & Railroad Staff Caltrain met another milestone in the electrification of its system, as it successfully tested electric trains and overhead wires between Redwood City and Mountain View for the first time. Caltrain is currently spending more than $2 billion to electrify its main line between San Francisco and Silicon Valley. The electrification","canonical_url":"https:\/\/www.vibewire.com.au\/?p=21463","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=21463#blogposting","name":"Caltrain Tests Overhead Wire; Electrification On Track for Fall - VibeWire Magazine","headline":"Caltrain Tests Overhead Wire; Electrification On Track for Fall","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/03\/CalTrain-MWxsSt.png","width":800,"height":458},"datePublished":"2024-03-21T03:36:44+10:00","dateModified":"2024-03-21T03:36:44+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=21463#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=21463#webpage"},"articleSection":"Rail News, USA"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=21463#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","position":2,"name":"Rail News","item":"https:\/\/www.vibewire.com.au\/?cat=47","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=21463#listItem","name":"Caltrain Tests Overhead Wire; Electrification On Track for Fall"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=21463#listItem","position":3,"name":"Caltrain Tests Overhead Wire; Electrification On Track for Fall","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=47#listItem","name":"Rail News"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=21463\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=21463\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=21463#webpage","url":"https:\/\/www.vibewire.com.au\/?p=21463","name":"Caltrain Tests Overhead Wire; Electrification On Track for Fall - VibeWire Magazine","description":"By Railfan & Railroad Staff Caltrain met another milestone in the electrification of its system, as it successfully tested electric trains and overhead wires between Redwood City and Mountain View for the first time. Caltrain is currently spending more than $2 billion to electrify its main line between San Francisco and Silicon Valley. The electrification","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=21463#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=0#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/03\/CalTrain-MWxsSt.png","@id":"https:\/\/www.vibewire.com.au\/?p=21463\/#mainImage","width":800,"height":458},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=21463#mainImage"},"datePublished":"2024-03-21T03:36:44+10:00","dateModified":"2024-03-21T03:36:44+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Caltrain Tests Overhead Wire; Electrification On Track for Fall - VibeWire Magazine","og:description":"By Railfan &amp; Railroad Staff Caltrain met another milestone in the electrification of its system, as it successfully tested electric trains and overhead wires between Redwood City and Mountain View for the first time. Caltrain is currently spending more than $2 billion to electrify its main line between San Francisco and Silicon Valley. The electrification","og:url":"https:\/\/www.vibewire.com.au\/?p=21463","article:published_time":"2024-03-20T17:36:44+00:00","article:modified_time":"2024-03-20T17:36:44+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Caltrain Tests Overhead Wire; Electrification On Track for Fall - VibeWire Magazine","twitter:description":"By Railfan &amp; Railroad Staff Caltrain met another milestone in the electrification of its system, as it successfully tested electric trains and overhead wires between Redwood City and Mountain View for the first time. Caltrain is currently spending more than $2 billion to electrify its main line between San Francisco and Silicon Valley. The electrification","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"21463","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-05-25 10:18:27","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-03-21 03:37:26","updated":"2026-05-25 10:18:27"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=47\" title=\"Rail News\">Rail News<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tCaltrain Tests Overhead Wire; Electrification On Track for Fall\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Rail News","link":"https:\/\/www.vibewire.com.au\/?cat=47"},{"label":"Caltrain Tests Overhead Wire; Electrification On Track for Fall","link":"https:\/\/www.vibewire.com.au\/?p=21463"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/21463","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=21463"}],"version-history":[{"count":0,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/21463\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/media\/21464"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=21463"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=21463"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=21463"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}