{"id":21180,"date":"2024-03-20T08:07:33","date_gmt":"2024-03-19T22:07:33","guid":{"rendered":"https:\/\/www.railexpress.com.au\/?p=115671"},"modified":"2024-03-20T08:07:33","modified_gmt":"2024-03-19T22:07:33","slug":"major-work-powers-ahead-at-hunter-street-station","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=21180","title":{"rendered":"Major work powers ahead at Hunter Street Station"},"content":{"rendered":"<figure><img decoding=\"async\" src=\"https:\/\/www.railexpress.com.au\/wp-content\/uploads\/2024\/03\/Tunnels_2.jpeg\" alt=\"\" style=\"float:right; margin:0 0 10px 10px;\"><figcaption>Image\/NSW Government<\/figcaption><\/figure>\n<div class=\"block--field-field-news-intro-text block\" data-block-plugin-id=\"field_block:node:news:field_news_intro_text\">\n<div class=\"contextual-region field field--name-field-news-intro-text field--type-string-long field--label-hidden field__item\">\n<p><strong>Work on <a href=\"https:\/\/www.railexpress.com.au\/sydney-metro-west-the-bays-project-ramps-up\/\">Sydney Metro<\/a> West\u2019s <a href=\"https:\/\/www.sydneymetro.info\/west\/project-overview\">Hunter Street Station<\/a> is powering ahead as excavation works continue on this future CBD transport hub.<\/strong><\/p>\n<\/div>\n<\/div>\n<p><span id=\"more-115671\"><\/span><\/p>\n<div class=\"block--field-body block\" data-block-plugin-id=\"field_block:node:news:body\">\n<div class=\"field field--name-body field--type-text-with-summary field--label-hidden field__item\">\n<p>Excavation of the station cavern, where the future station will be built 30 metres underground, is 30 per cent complete thanks to three roadheaders working at the site.<\/p>\n<p>Roadheaders are specially designed electric-powered tunnelling machines that have a rotating head fitted with metal picks to break and excavate rock.<\/p>\n<p>Each roadheader weighs up to 120 tonnes and will be used to excavate the Hunter Street Station cavern and turnback tunnels. The turnback tunnels to the east of the new station will allow trains to turn around before travelling back towards Westmead.<\/p>\n<p>More than 149,000 tonnes of dirt have been excavated by the roadheaders so far, and the largest area of the cavern that has been excavated is 235m2.<\/p>\n<p>As the roadheaders complete excavation on the station cavern and associated tunnels, two tunnel boring machines will be launched at The Bays in mid-2024, to carve out the 3.5-kilometre twin rail tunnels below Darling Harbour to Hunter Street.<\/p>\n<p>When Sydney Metro West opens, passengers will be able to use an underground walkway to connect to metro services on the Metro North West Line and City &amp; Southwest line at Martin Place.<\/p>\n<p>Further connections to the Sydney light rail and train network will also be minutes away on George Street and at Wynyard Station.<\/p>\n<p>Sydney Metro West will double rail capacity between Greater Parramatta and the Sydney CBD, linking new communities to rail services and supporting housing supply, transforming Sydney for generations to come.<\/p>\n<\/div>\n<\/div>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/major-work-powers-ahead-at-hunter-street-station\/\">Major work powers ahead at Hunter Street Station<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Work on Sydney Metro West\u2019s Hunter Street Station is powering ahead as excavation works continue on this future CBD transport \u2026 <\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/major-work-powers-ahead-at-hunter-street-station\/\">Major work powers ahead at Hunter Street Station<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"author":13,"featured_media":1,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[165,163,58,1167],"tags":[],"class_list":["post-21180","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-infrastructure","category-rail-industry-news-australia-new-zealand","category-track-construction","category-tunnelling"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Work on Sydney Metro West\u2019s Hunter Street Station is powering ahead as excavation works continue on this future CBD transport \u2026 The post Major work powers ahead at Hunter Street Station appeared first on Rail Express.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=21180\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Major work powers ahead at Hunter Street Station - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"Work on Sydney Metro West\u2019s Hunter Street Station is powering ahead as excavation works continue on this future CBD transport \u2026 The post Major work powers ahead at Hunter Street Station appeared first on Rail Express.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=21180\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-03-19T22:07:33+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-03-19T22:07:33+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Major work powers ahead at Hunter Street Station - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Work on Sydney Metro West\u2019s Hunter Street Station is powering ahead as excavation works continue on this future CBD transport \u2026 The post Major work powers ahead at Hunter Street Station appeared first on Rail Express.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21180#blogposting\",\"name\":\"Major work powers ahead at Hunter Street Station - VibeWire Magazine\",\"headline\":\"Major work powers ahead at Hunter Street Station\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1},\"datePublished\":\"2024-03-20T08:07:33+10:00\",\"dateModified\":\"2024-03-20T08:07:33+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21180#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21180#webpage\"},\"articleSection\":\"Industry Infrastructure, Rail industry news (Australia, New Zealand), Track Construction, Tunnelling\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21180#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=58#listItem\",\"name\":\"Track Construction\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=58#listItem\",\"position\":2,\"name\":\"Track Construction\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=58\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21180#listItem\",\"name\":\"Major work powers ahead at Hunter Street Station\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21180#listItem\",\"position\":3,\"name\":\"Major work powers ahead at Hunter Street Station\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=58#listItem\",\"name\":\"Track Construction\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21180\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21180\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21180#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21180#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21180\",\"name\":\"Major work powers ahead at Hunter Street Station - VibeWire Magazine\",\"description\":\"Work on Sydney Metro West\\u2019s Hunter Street Station is powering ahead as excavation works continue on this future CBD transport \\u2026 The post Major work powers ahead at Hunter Street Station appeared first on Rail Express.\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21180#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":1,\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21180\\\/#mainImage\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=21180#mainImage\"},\"datePublished\":\"2024-03-20T08:07:33+10:00\",\"dateModified\":\"2024-03-20T08:07:33+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Major work powers ahead at Hunter Street Station - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Major work powers ahead at Hunter Street Station - VibeWire Magazine","description":"Work on Sydney Metro West\u2019s Hunter Street Station is powering ahead as excavation works continue on this future CBD transport \u2026 The post Major work powers ahead at Hunter Street Station appeared first on Rail Express.","canonical_url":"https:\/\/www.vibewire.com.au\/?p=21180","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=21180#blogposting","name":"Major work powers ahead at Hunter Street Station - VibeWire Magazine","headline":"Major work powers ahead at Hunter Street Station","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":1},"datePublished":"2024-03-20T08:07:33+10:00","dateModified":"2024-03-20T08:07:33+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=21180#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=21180#webpage"},"articleSection":"Industry Infrastructure, Rail industry news (Australia, New Zealand), Track Construction, Tunnelling"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=21180#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=58#listItem","name":"Track Construction"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=58#listItem","position":2,"name":"Track Construction","item":"https:\/\/www.vibewire.com.au\/?cat=58","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=21180#listItem","name":"Major work powers ahead at Hunter Street Station"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=21180#listItem","position":3,"name":"Major work powers ahead at Hunter Street Station","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=58#listItem","name":"Track Construction"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=21180\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=21180\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=21180#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=21180#webpage","url":"https:\/\/www.vibewire.com.au\/?p=21180","name":"Major work powers ahead at Hunter Street Station - VibeWire Magazine","description":"Work on Sydney Metro West\u2019s Hunter Street Station is powering ahead as excavation works continue on this future CBD transport \u2026 The post Major work powers ahead at Hunter Street Station appeared first on Rail Express.","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=21180#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"image":{"@type":"ImageObject","url":1,"@id":"https:\/\/www.vibewire.com.au\/?p=21180\/#mainImage"},"primaryImageOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=21180#mainImage"},"datePublished":"2024-03-20T08:07:33+10:00","dateModified":"2024-03-20T08:07:33+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Major work powers ahead at Hunter Street Station - VibeWire Magazine","og:description":"Work on Sydney Metro West\u2019s Hunter Street Station is powering ahead as excavation works continue on this future CBD transport \u2026 The post Major work powers ahead at Hunter Street Station appeared first on Rail Express.","og:url":"https:\/\/www.vibewire.com.au\/?p=21180","article:published_time":"2024-03-19T22:07:33+00:00","article:modified_time":"2024-03-19T22:07:33+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Major work powers ahead at Hunter Street Station - VibeWire Magazine","twitter:description":"Work on Sydney Metro West\u2019s Hunter Street Station is powering ahead as excavation works continue on this future CBD transport \u2026 The post Major work powers ahead at Hunter Street Station appeared first on Rail Express.","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"21180","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-05-25 08:53:15","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-03-19 23:04:23","updated":"2026-05-25 08:53:15"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=58\" title=\"Track Construction\">Track Construction<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tMajor work powers ahead at Hunter Street Station\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Track Construction","link":"https:\/\/www.vibewire.com.au\/?cat=58"},{"label":"Major work powers ahead at Hunter Street Station","link":"https:\/\/www.vibewire.com.au\/?p=21180"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/21180","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=21180"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/21180\/revisions"}],"predecessor-version":[{"id":21181,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/21180\/revisions\/21181"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=21180"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=21180"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=21180"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}