{"id":21113,"date":"2024-03-20T02:07:59","date_gmt":"2024-03-19T16:07:59","guid":{"rendered":"https:\/\/www.rtands.com\/?p=53370"},"modified":"2024-03-20T02:07:59","modified_gmt":"2024-03-19T16:07:59","slug":"sandag-prepares-for-78m-3-year-del-mar-bluffs-stabilization-project","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=21113","title":{"rendered":"SANDAG Prepares for $78M, 3-Year Del Mar Bluffs Stabilization Project"},"content":{"rendered":"<p>DEL MAR, Calif. \u2013\u2013 The San Diego Association of Governments (SANDAG) has announced a major project to stabilize the Del Mar Bluffs.<\/p>\n<p>The post <a rel=\"nofollow\" href=\"https:\/\/www.rtands.com\/track-construction\/sandag-prepares-for-78m-3-year-del-mar-bluffs-stabilization-project\/\">SANDAG Prepares for $78M, 3-Year Del Mar Bluffs Stabilization Project<\/a> appeared first on <a rel=\"nofollow\" href=\"https:\/\/www.rtands.com\/\">Railway Track and Structures<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>DEL MAR, Calif. \u2013\u2013 The San Diego Association of Governments (SANDAG) has announced a major project to stabilize the Del Mar Bluffs.<br \/>\nThe post SANDAG Prepares for $78M, 3-Year Del Mar Bluffs Stabilization Project appeared first on Railway Track and Struc&#8230;<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[2888,35,1992,1309,6584,49,51,6585,58,33],"tags":[9],"class_list":["post-21113","post","type-post","status-publish","format-standard","hentry","category-ballast-ties-rail","category-breaking-news","category-del-mar-bluffs","category-freight-railroad","category-lossan-corridor","category-passenger","category-passenger-rail","category-sandag","category-track-construction","category-track-structure","tag-freight"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/21113","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=21113"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/21113\/revisions"}],"predecessor-version":[{"id":21114,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/21113\/revisions\/21114"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=21113"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=21113"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=21113"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}