{"id":20893,"date":"2024-03-19T07:15:04","date_gmt":"2024-03-18T21:15:04","guid":{"rendered":"https:\/\/www.rtands.com\/?p=53353"},"modified":"2024-03-19T07:15:04","modified_gmt":"2024-03-18T21:15:04","slug":"overnight-dnt-closure-for-dart-silver-line-project-construction-2","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=20893","title":{"rendered":"Overnight DNT Closure for DART Silver Line Project Construction"},"content":{"rendered":"<p>DALLAS \u2013 Over the weekend of March 23rd-25th, both DART and the NTTA have agreed to an overnight closure of the DNT to allow for construction on the DART Silver Line Regional Rail Project.<\/p>\n<p>The post <a rel=\"nofollow\" href=\"https:\/\/www.rtands.com\/track-construction\/overnight-dnt-closure-for-dart-silver-line-project-construction\/\">Overnight DNT Closure for DART Silver Line Project Construction<\/a> appeared first on <a rel=\"nofollow\" href=\"https:\/\/www.rtands.com\/\">Railway Track and Structures<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>DALLAS \u2013 Over the weekend of March 23rd-25th, both DART and the NTTA have agreed to an overnight closure of the DNT to allow for construction on the DART Silver Line Regional Rail Project.<br \/>\nThe post Overnight DNT Closure for DART Silver Line Project Con&#8230;<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[35,57,6522,6523,6524,6525,49,51,58],"tags":[],"class_list":["post-20893","post","type-post","status-publish","format-standard","hentry","category-breaking-news","category-commuter-regional","category-dallas-area-rapid-transit-dart","category-dallas-north-tollway-dnt","category-dart-silver-line-regional-rail-project","category-north-texas-tollway-authority-ntta","category-passenger","category-passenger-rail","category-track-construction"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/20893","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=20893"}],"version-history":[{"count":1,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/20893\/revisions"}],"predecessor-version":[{"id":20894,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/20893\/revisions\/20894"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=20893"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=20893"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=20893"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}