{"id":20596,"date":"2024-03-18T07:17:01","date_gmt":"2024-03-17T21:17:01","guid":{"rendered":"https:\/\/www.railexpress.com.au\/?p=115643"},"modified":"2024-03-18T07:17:01","modified_gmt":"2024-03-17T21:17:01","slug":"brunt-road-bridge-to-open-a-year-ahead-of-schedule","status":"publish","type":"post","link":"https:\/\/www.vibewire.com.au\/?p=20596","title":{"rendered":"Brunt Road bridge to open a year ahead of schedule"},"content":{"rendered":"<div>\n<p><strong>The dangerous and congested level crossing at\u00a0<a href=\"https:\/\/bigbuild.vic.gov.au\/projects\/level-crossing-removal-project\/projects\/brunt-road-beaconsfield\"  rel=\"noopener\">Brunt Road, Beaconsfield<\/a>\u00a0will be gone for good one year ahead of schedule, with a final construction push set to start in April.<\/strong><\/p>\n<\/div>\n<p><span id=\"more-115643\"><\/span><\/p>\n<div>\n<p>When traffic flows over the new road bridge, the Pakenham Line will be one step closer to being level crossing-free by 2025 \u2013 improving journeys for the 8,400 drivers passing through each day and allowing for more trains after the Metro Tunnel opens in 2025.<\/p>\n<\/div>\n<div>\n<p>Works will occur until late April to finish the new road bridge that will separate cars and trains for good.<\/p>\n<\/div>\n<div>\n<p>To allow work to be carried out safely, <a href=\"https:\/\/www.railexpress.com.au\/elevated-road-bridge-at-brunt-road\/\">Brunt Road<\/a> will close between Edinburgh Drive and Pioneer Way and Rix Road from Tuesday 9 April to late April, with detours in place for drivers and pedestrians.<\/p>\n<\/div>\n<div>\n<p>There will be a new footpath and shared use path across the new road bridge, providing a direct link to local schools, shops and services on either side of the rail line.<\/p>\n<\/div>\n<div>\n<p>The team have recently installed 160 panels to be painted in earthy, brick tones to form the retaining walls, with 100,000 tonnes of material placed between the panels to form the new bridge.<\/p>\n<\/div>\n<div>\n<p>When Brunt Road reopens in late April, road users will have a safer, more reliable way to cross the rail line, allowing works to start to close the\u00a0<a href=\"https:\/\/bigbuild.vic.gov.au\/projects\/level-crossing-removal-project\/projects\/station-street-officer\"  rel=\"noopener\">Station Street, Officer<\/a>\u00a0level crossing.<\/p>\n<\/div>\n<div>\n<p>Early works will start in Officer shortly after the Brunt Road bridge opens, with the level crossing to be closed for good by 2024.<\/p>\n<\/div>\n<div>\n<p>Closing the Station Street, Officer level crossing will improve safety, reduce congestion, and contribute to a level crossing-free Pakenham line by 2025.<\/p>\n<\/div>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/brunt-road-bridge-to-open-a-year-ahead-of-schedule\/\">Brunt Road bridge to open a year ahead of schedule<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The dangerous and congested level crossing at\u00a0Brunt Road, Beaconsfield\u00a0will be gone for good one year ahead of schedule, with a \u2026 <\/p>\n<p>The post <a href=\"https:\/\/www.railexpress.com.au\/brunt-road-bridge-to-open-a-year-ahead-of-schedule\/\">Brunt Road bridge to open a year ahead of schedule<\/a> appeared first on <a href=\"https:\/\/www.railexpress.com.au\/\">Rail Express<\/a>.<\/p>\n","protected":false},"author":13,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[165,1614,879,163,58],"tags":[],"class_list":["post-20596","post","type-post","status-publish","format-standard","hentry","category-industry-infrastructure","category-infrastructure-projects","category-level-crossing-removal","category-rail-industry-news-australia-new-zealand","category-track-construction"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"The dangerous and congested level crossing at Brunt Road, Beaconsfield will be gone for good one year ahead of schedule, with a \u2026 The post Brunt Road bridge to open a year ahead of schedule appeared first on Rail Express.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Guest authors\"\/>\n\t<meta name=\"google-site-verification\" content=\"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.vibewire.com.au\/?p=20596\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Brunt Road bridge to open a year ahead of schedule - VibeWire Magazine\" \/>\n\t\t<meta property=\"og:description\" content=\"The dangerous and congested level crossing at Brunt Road, Beaconsfield will be gone for good one year ahead of schedule, with a \u2026 The post Brunt Road bridge to open a year ahead of schedule appeared first on Rail Express.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.vibewire.com.au\/?p=20596\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2024-03-17T21:17:01+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2024-03-17T21:17:01+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@VibewireCentral\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Brunt Road bridge to open a year ahead of schedule - VibeWire Magazine\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The dangerous and congested level crossing at Brunt Road, Beaconsfield will be gone for good one year ahead of schedule, with a \u2026 The post Brunt Road bridge to open a year ahead of schedule appeared first on Rail Express.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@VibewireCentral\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=20596#blogposting\",\"name\":\"Brunt Road bridge to open a year ahead of schedule - VibeWire Magazine\",\"headline\":\"Brunt Road bridge to open a year ahead of schedule\",\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#articleImage\",\"width\":1028,\"height\":930},\"datePublished\":\"2024-03-18T07:17:01+10:00\",\"dateModified\":\"2024-03-18T07:17:01+10:00\",\"inLanguage\":\"en-AU\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=20596#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=20596#webpage\"},\"articleSection\":\"Industry Infrastructure, Infrastructure Projects, Level Crossing Removal, Rail industry news (Australia, New Zealand), Track Construction\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=20596#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=58#listItem\",\"name\":\"Track Construction\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=58#listItem\",\"position\":2,\"name\":\"Track Construction\",\"item\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=58\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=20596#listItem\",\"name\":\"Brunt Road bridge to open a year ahead of schedule\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=20596#listItem\",\"position\":3,\"name\":\"Brunt Road bridge to open a year ahead of schedule\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?cat=58#listItem\",\"name\":\"Track Construction\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Screenshot-2024-01-07-at-2.32.21\\u202fpm.png\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=20596\\\/#organizationLogo\",\"width\":1028,\"height\":930},\"image\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=20596\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/twitter.com\\\/VibewireCentral\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13\",\"name\":\"Guest authors\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=20596#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Guest authors\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=20596#webpage\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=20596\",\"name\":\"Brunt Road bridge to open a year ahead of schedule - VibeWire Magazine\",\"description\":\"The dangerous and congested level crossing at Brunt Road, Beaconsfield will be gone for good one year ahead of schedule, with a \\u2026 The post Brunt Road bridge to open a year ahead of schedule appeared first on Rail Express.\",\"inLanguage\":\"en-AU\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?p=20596#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/?author=13#author\"},\"datePublished\":\"2024-03-18T07:17:01+10:00\",\"dateModified\":\"2024-03-18T07:17:01+10:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#website\",\"url\":\"https:\\\/\\\/www.vibewire.com.au\\\/\",\"name\":\"VibreWire Online\",\"description\":\"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything\",\"inLanguage\":\"en-AU\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vibewire.com.au\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Brunt Road bridge to open a year ahead of schedule - VibeWire Magazine<\/title>\n\n","aioseo_head_json":{"title":"Brunt Road bridge to open a year ahead of schedule - VibeWire Magazine","description":"The dangerous and congested level crossing at Brunt Road, Beaconsfield will be gone for good one year ahead of schedule, with a \u2026 The post Brunt Road bridge to open a year ahead of schedule appeared first on Rail Express.","canonical_url":"https:\/\/www.vibewire.com.au\/?p=20596","robots":"max-image-preview:large","keywords":"","webmasterTools":{"google-site-verification":"1EIWGZ5FoylKQrO3pqls-2hXlDXKIP1lffdWZCVV0V4","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.vibewire.com.au\/?p=20596#blogposting","name":"Brunt Road bridge to open a year ahead of schedule - VibeWire Magazine","headline":"Brunt Road bridge to open a year ahead of schedule","author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/#articleImage","width":1028,"height":930},"datePublished":"2024-03-18T07:17:01+10:00","dateModified":"2024-03-18T07:17:01+10:00","inLanguage":"en-AU","mainEntityOfPage":{"@id":"https:\/\/www.vibewire.com.au\/?p=20596#webpage"},"isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/?p=20596#webpage"},"articleSection":"Industry Infrastructure, Infrastructure Projects, Level Crossing Removal, Rail industry news (Australia, New Zealand), Track Construction"},{"@type":"BreadcrumbList","@id":"https:\/\/www.vibewire.com.au\/?p=20596#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","position":1,"name":"Home","item":"https:\/\/www.vibewire.com.au","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=58#listItem","name":"Track Construction"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=58#listItem","position":2,"name":"Track Construction","item":"https:\/\/www.vibewire.com.au\/?cat=58","nextItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=20596#listItem","name":"Brunt Road bridge to open a year ahead of schedule"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?p=20596#listItem","position":3,"name":"Brunt Road bridge to open a year ahead of schedule","previousItem":{"@type":"ListItem","@id":"https:\/\/www.vibewire.com.au\/?cat=58#listItem","name":"Track Construction"}}]},{"@type":"Organization","@id":"https:\/\/www.vibewire.com.au\/#organization","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","url":"https:\/\/www.vibewire.com.au\/","logo":{"@type":"ImageObject","url":"https:\/\/www.vibewire.com.au\/wp-content\/uploads\/2024\/02\/Screenshot-2024-01-07-at-2.32.21\u202fpm.png","@id":"https:\/\/www.vibewire.com.au\/?p=20596\/#organizationLogo","width":1028,"height":930},"image":{"@id":"https:\/\/www.vibewire.com.au\/?p=20596\/#organizationLogo"},"sameAs":["https:\/\/twitter.com\/VibewireCentral"]},{"@type":"Person","@id":"https:\/\/www.vibewire.com.au\/?author=13#author","url":"https:\/\/www.vibewire.com.au\/?author=13","name":"Guest authors","image":{"@type":"ImageObject","@id":"https:\/\/www.vibewire.com.au\/?p=20596#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/764687183b9d2913837d7b543a5b43684d46e7eef4e1a9af4821624eb2bebbc0?s=96&d=mm&r=g","width":96,"height":96,"caption":"Guest authors"}},{"@type":"WebPage","@id":"https:\/\/www.vibewire.com.au\/?p=20596#webpage","url":"https:\/\/www.vibewire.com.au\/?p=20596","name":"Brunt Road bridge to open a year ahead of schedule - VibeWire Magazine","description":"The dangerous and congested level crossing at Brunt Road, Beaconsfield will be gone for good one year ahead of schedule, with a \u2026 The post Brunt Road bridge to open a year ahead of schedule appeared first on Rail Express.","inLanguage":"en-AU","isPartOf":{"@id":"https:\/\/www.vibewire.com.au\/#website"},"breadcrumb":{"@id":"https:\/\/www.vibewire.com.au\/?p=20596#breadcrumblist"},"author":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"creator":{"@id":"https:\/\/www.vibewire.com.au\/?author=13#author"},"datePublished":"2024-03-18T07:17:01+10:00","dateModified":"2024-03-18T07:17:01+10:00"},{"@type":"WebSite","@id":"https:\/\/www.vibewire.com.au\/#website","url":"https:\/\/www.vibewire.com.au\/","name":"VibreWire Online","description":"Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","inLanguage":"en-AU","publisher":{"@id":"https:\/\/www.vibewire.com.au\/#organization"}}]},"og:locale":"en_US","og:site_name":"VibeWire Magazine - Your Alternate News Source for Transport, Politics, UFO, Paranormal, Anything","og:type":"article","og:title":"Brunt Road bridge to open a year ahead of schedule - VibeWire Magazine","og:description":"The dangerous and congested level crossing at Brunt Road, Beaconsfield will be gone for good one year ahead of schedule, with a \u2026 The post Brunt Road bridge to open a year ahead of schedule appeared first on Rail Express.","og:url":"https:\/\/www.vibewire.com.au\/?p=20596","article:published_time":"2024-03-17T21:17:01+00:00","article:modified_time":"2024-03-17T21:17:01+00:00","twitter:card":"summary_large_image","twitter:site":"@VibewireCentral","twitter:title":"Brunt Road bridge to open a year ahead of schedule - VibeWire Magazine","twitter:description":"The dangerous and congested level crossing at Brunt Road, Beaconsfield will be gone for good one year ahead of schedule, with a \u2026 The post Brunt Road bridge to open a year ahead of schedule appeared first on Rail Express.","twitter:creator":"@VibewireCentral"},"aioseo_meta_data":{"post_id":"20596","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"seo_analyzer_scan_date":"2026-05-25 04:54:35","breadcrumb_settings":null,"limit_modified_date":false,"open_ai":null,"ai":null,"created":"2024-03-17 21:34:07","updated":"2026-05-25 04:54:35"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/www.vibewire.com.au\/?cat=58\" title=\"Track Construction\">Track Construction<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\tBrunt Road bridge to open a year ahead of schedule\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.vibewire.com.au"},{"label":"Track Construction","link":"https:\/\/www.vibewire.com.au\/?cat=58"},{"label":"Brunt Road bridge to open a year ahead of schedule","link":"https:\/\/www.vibewire.com.au\/?p=20596"}],"_links":{"self":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/20596","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/users\/13"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=20596"}],"version-history":[{"count":2,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/20596\/revisions"}],"predecessor-version":[{"id":20608,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=\/wp\/v2\/posts\/20596\/revisions\/20608"}],"wp:attachment":[{"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=20596"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=20596"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vibewire.com.au\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=20596"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}